ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

RRR Measurements in S23 during LS1 Emmanuele Ravaioli Daniel Rasmussen Scott Rowan Thanks to Z. Charifoulline, R. Denz, J. Steckert, H. Thiesen, A. Verweij.
FINITE ELEMENTS SOFTWARE FOR ELECTROMAGNETICS APPLIED TO ELECTRICAL ENGINEERING TRAINING. J. Mur, J.S. Artal, J. Letosa, A. Usón and M. Samplón Electrical.
MQXF Quench Protection Analysis HiLumi workshop – KEK, Tsukuba Vittorio Marinozzi 11/18/2014.
Cryogenic Experts Meeting (19 ~ ) Heat transfer in SIS 300 dipole MT/FAIR – Cryogenics Y. Xiang, M. Kauschke.
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
Possibilities of Finite Element Modelling for a Better Understanding of Heat Transfer in Rutherford-Type Cables The use of COMSOL Multiphysics as an analysis.
MQXF state of work and analysis of HQ experimental current decays with the QLASA model used for MQXF Vittorio Marinozzi 10/28/
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
A novel model for Minimum Quench Energy calculation of impregnated Nb 3 Sn cables and verification on real conductors W.M. de Rapper, S. Le Naour and H.H.J.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Proposal for RRR measurement in S-12 at K MP3 meeting, 15 July 2009, Arjan Verweij With input from Bob Flora and Udo Wagner Arjan Verweij, TE-MPE,
Workshop on Beam Induced Quenches Summary of session 4 “Heat Transfer R&D” SpeakersTopics Pier Paolo Granieri Steady-State Heat Transfer in the LHC Superconducting.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Drilling a Double Cosine-Theta Coil Hunter Blanton, Spencer L. Kirn, Christopher Crawford University of Kentucky Abstract: A double cosine theta coil is.
1 Numerical study of the thermal behavior of an Nb 3 Sn high field magnet in He II Slawomir PIETROWICZ, Bertrand BAUDOUY CEA Saclay Irfu, SACM Gif-sur-Yvette.
The diode lead resistance ‘issue’ A. Verweij, TE-MPE, CSCM workshop 7/10/2011 Contents:  Diode geometry  Measurements performed in the past  Measurements.
LHC diodes: Status report (for information)
Heat management issues A perspective view centered on the design of superconducting devices Opinions of L. Bottura At the mWorkshop on Thermal Modeling.
Plasma Facing PFA Antenna Group POLITECNICO DI TORINO 19 Topical Conference on Radio Frequency Power in Plasmas June 1-3, Newport 1 Mitigation of.
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
QXF quench heater delay simulations Tiina Salmi, T. Salmi.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 1 st Workshop FTEC 2015 Alejandro Fernandez Navarro.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
A PROPOSAL TO PULSE THE MAGNET BUSES TO VALIDATE SPLICE QUALITY H. Pfeffer 3/7/09 Version 4.
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
Splice Joint Design and Analysis John Escallier Brookhaven National Lab bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Protection of 600 A bus bars, follow up W. Venturini Delsolaro and A. Verweij MPP meeting, 17/10/2006.
Daniel Molnar Diode simulations and measurements.
P. P. Granieri 1,2, M. Breschi 3, M. Casali 3, L. Bottura 1 1 CERN, Geneva, CH 2 EPFL-LPAP, Swiss Federal Institute of Technology, Lausanne, CH 3 University.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
The most likely cause of death for a superconducting magnet Input data for thermal modeling of Nb 3 Sn Superconducting Magnets by Andrew Davies Find the.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
CSCM Test description and Risk assessment  Goal  The typical and ultimate current cycle  Test sequence for type test and regular test  Risk assessment.
Status of QLASA Tool Adapter
INTRODUCTION : Convection: Heat transfer between a solid surface and a moving fluid is governed by the Newton’s cooling law: q = hA(Ts-Tɷ), where Ts is.
RB and RQ shunted BusBar current carrying capacities
Quench Simulation at GSI
Quench estimations of the CBM magnet
UK-HL-LHC WP4 Cold Powering
LHC Interconnect Simulations and FRESCA Results
12 October 2009 RRB Plenary R.-D. Heuer
Arc magnet designs Attilio Milanese 13 Oct. 2016
Powering the LHC Magnets
EuroCirCol: 16T dipole based on common coils
FCC hh dump kicker - switch topologies and impact on beam
Dipole diode lead resistance measurement
Circuits description and requirements - Closed Session-
Compact and Low Consumption Magnet Design The DESY Experience
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
Do the splices limit us to 5TeV – plans for the 2010 run
L. Bottura and A. Verweij Based on work and many contributions from:
MQXF coil cross-section status
Using the code QP3 to calculate quench thresholds for the MB
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
Lattice (bounce) diagram
Cross-section of the 150 mm aperture case
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert

Contents Daniel Molnar 2  Introduction  Interconnections and their repair  Physical description  Materials  Modeling with Comsol 4.1  Comparisons to other codes, validations  Shunted lines  Design optimizations for the shunts  Shunt concepts  Other investigations  Conclusions  Acknowledgements

The LHC interconnections Daniel Molnar 3  In case of a quench they should ensure the safe operation i.e. carrying the current  In the main ring there are some (!) connection btw. the dipole and quadrupole magnets  If the protection systems detect a quench,the circuit is opened and the current is decaying with a time constant Tau, 100 sec for dipoles and 30 sec for quadrupole

Motivation Daniel Molnar 4  The motivation is to insure the safe operation of the LHC machine at the nominal beam energy of 7TeV  The 2008 incident has shown that present splices mean a significant danger, and not capable to secure the long term operation at higher current levels Thus they need to be repaired and protected  A shunt will be added to all of them, which has to carry the current even in worst case (adiabatic) conditions

The ideal\designed interconnects Daniel Molnar 5 Different Cu stabilizer pieces Cross section of a well soldered cable Side view of a perfectly soldered joint

And the reality….. Daniel Molnar 6  A vast number of defects and lack of soldering X-raySchematics

Physical description  The first and main physical phenomena which describes such a runaway is the Joule heating, later other physical problems coupled with it (magneto-resistivity) 7 Daniel Molnar

Boundary conditions and initial values Daniel Molnar 8  Most of the following results with the assumption of adiabatic thermal boundaries(worst case)  Electrical boundary conditions: On one side J current density constraint, the other is V=0  Initial conditions: V(t=0)=0 and in most cases T(t=0)=10K, so we have already quenched the cable  Pessimism is the most important factor ! bus

Material properties 9 Daniel Molnar -Magneto resistivity is included in the models, simply adding a constant to the Copper’s electrical resistivity (Self Field Factor) -The superconducting cable consists Nb-Ti and Copper, with the ratio of1: resistivity could not be implemented in numerical calculations (in Comsol), so instead 10^-14 Ohm*m is used

Modeling Daniel Molnar 10  3D model of the problem  Linear shape function for the finite elements, significant save of time  Mesh elements number: for shunted 12236, non shunted  Mesh size: mm in the defects(and shunt), 10 mm for the BUS  Linear interpolation for the material properties i.e. between two known points it uses constant value, not significant simplification  The non linear solver uses a Newtonian algorithm, relative tolerance is 0.02  CPU time is typically 2000 sec, but for instance the He cooling case and quench etc. took sec

Modeling II.  Instead of the actual shape rectangular was used with same cross section, to be able to use rectangular mesh  Symmetries introduced when it’s possible to speed up calculations Time step: 1msec 11 Daniel Molnar

Comparisons, validations  The simulations carried out with Comsol, have been compared to another code QP3  Good agreement between the two results (and between measurements), within a 4-5 % difference  The difference is intrinsic to the fact that QP3 is a 1D model, while in Comsol 3D was implemented  Again we have to point out, both measurements and codes (QP3 and Comsol) show that the runaway is very fast, and in some cases non- protectable ! 12 Daniel Molnar

Non shunted studies Daniel Molnar 13

RQ/RB non shunted 14 Daniel Molnar

Non shunted run-away(cause of 2008 incident) Daniel Molnar 15 A runaway of a joint, notice the sharp and very fast change in the temperature

The shunted bus bars  The main shunt itself is the same for both quadrupole and dipole circuits  Dipole lines can have 4 shunts/ joints, for the quads just below ones  The solder is SnPb, avg. thickness 100 m m  In the calculations the RRR is 200 (pessimistic) 16 Daniel Molnar Main shunt dimensions, top/bottom and side view The main shunt soldered to the BUS

Description of symmetric shunt defects 50 mm 15 mm Holes Up shunt Below shunt BUS wedge U-profile BUS 17 Daniel Molnar Non stabilized cable

Safe operating currents for Dipole lines 18 Daniel Molnar

Safe operating currents for the Quadrupole lines 19 Daniel Molnar

Shunt designs  Naturally questions come up: do we have bigger margin for longer shunt? Or could a smaller reservoir hole for solder mean higher safety?  There are other view points than electro-thermal, such as quality control, accessibility, mechanical studies and solder quality 20 Daniel Molnar Length of Shunt[mm] Current density y component[A/m^2]

RB shunt with smaller holes 21 Daniel Molnar

RQ shunt with smaller holes 22 Daniel Molnar

Additional shunts for quadrupole bus bars(side shunts)  The quad buses have no possibilities for a top shunt(at least idem as below shunt )  There are two designs for side shunts  Again there are other view points than electro-thermal 23 Daniel Molnar Type_a, “bridge” Type_b

RQ Side-shunt type_a, dimensions and results zlzmzr x 8mm -Summary of different designs for the “bridge” side shunt -The original design is not safe The depth is not varied Daniel Molnar

Electrically redesigned versions Courtesy of P. Fessia Daniel Molnar 25

RQ sideshunt type_b dimensions and results 26 x z=zb+zj y zb 15 zj x -Summary of different designs for the “simple” side shunt -The original design is not safe Daniel Molnar

Time constant of the circuit 27 Daniel Molnar

Magneto-resistivity  In all calculations shown before the magnetic effect is included, a constant is added to the resistivity of the Copper –Self Field Factor  One can ask what about the shunt? The current density is higher so is the magnetic field  Nice modeling problem, but practically not so significant 28 Daniel Molnar

Conclusions  The present shunt design could guarantee the safe long term operation of the LHC at 7TeV (13kA or more) for dipole and quadrupole lines as well  The side shunts for the quadrupoles do not mean full redundancy, although with major changes they could be safe  The safe current also strongly depends on the defect of the BUS  Also other calculations are ongoing, such as cooling to He, to investigate the margins in this case 29 Daniel Molnar

Acknowledgements  Many thanks to Arjan Verweij and to Erwin Bielert 30 Daniel Molnar

Thanks 31 Daniel Molnar

Backups 32 Daniel Molnar

Modeling in 1D and 3D  Qp3:1D  The green arrows are the current density vectors  Comsol 4.1:3D  In this case there’s a real redistribution 33 Daniel Molnar defect

RQ shunts summary 34

RB up shunt 35 -Note that the two reservoir holes are always considered to be AIR, with rectangular shape -The defect of SnPb solder is indicated by green lines, different lengths of it -also non perfect contact between wedge and U-profile Top view for up-shunt 15 Wedge U-profile

RQ/RB below shunt Bottom view below shunt -The shunt is the same as for the up one -The defect of SnPb solder is indicated by green lines, different lengths of it -Also the defect is symmetric with respect to the connection of Bus and U profile

QP3 Comsol difference; shunt RRR For RQ shunted calculations(0=0.5) For RB shunted calculations (0=0.5) QP3 the shunt’s RRR=150

QP3 and Comsol 4.1 example Daniel Molnar 38

Modeling considerations: geometry 39 RB (half) RQ(full) RQ(half)

Extreme case: full length non stabilized cable 40

Extreme case II) full length NSC,non symmetric SnPb defect 41

And a more Extreme:No Cu in the defect for RQ below shunt 42

The effect of the SnPb thickness  The “standard” is 100  m but, also the effect of a thicker SnPb layer under (or above) the shunt has been investigated  For an RB below shunt with 8mm of GAP in the SnPb -100  m thickness:16200 A -300  m thickness:15900 A 43

Defect look-a- like 44

Magnetic models, mesh quality 45

Different Time constants-same current 46 The safe current for Tau 30 sec: 16kA (also a bd case)

Modeled RQ side shunts 47

An example of usage beyond Comsol 48  Resistance as a function of time; It could carry14kA without reaching 300 K, shunted version, no void in SnPb