SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
The LT Dipole July 8 th, Motivation Combine expertise of LBNL & TAMU to overcome common obstacles and reach higher fields with regular milestones.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
QXF instrumentation trace development
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
MQXFS1 Coils QC & DRs J. Schmalzle May 14, MQXFS1 Coils MQXFS1 Coils SQXF03 & SQXF05 – Reaction Temperature Data – Electrical Checks – DRs May 14,
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
TQS Overview and recent progress
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
High Order correctors coil manufacturing
ERMC/RMM activities May 2017
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
FRESCA2 Update on the dipole design and new calculations
LCLS-II SPQA Magnet Leads Soldering
MQXF updates P. Ferracin October 9th, 2014.
Electrical integrity of magnets and coils
Coil Fabrication Status
Presentation transcript:

SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014

SQXF Coil 2 Status Outline Splice block removal, bolts seized –Next coil use boron nitride Power lead splice complete –SnPb solder & activated flux used –Very difficult using silver solder and low chloride flux (Nokorode) Heater/VT trace hi-pot test passed, 1kV Straight section (poles) preparation complete 2 voltage taps out of place requiring jumpers, DR written. (photos) Quench heater over saddle/splice blocks procedure. (photos) Applied mold release to impregnation tooling Plan 2 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Seized bolts –At coil winding use boron nitride 3 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Power lead splice complete –SnPb solder & activated flux used –Very difficult using silver solder and low chloride flux (Nokorode) 4 Pre-tinning of reacted cable Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Heater/VT trace hi-pot test passed, 1kV 5 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Straight section (poles) preparation complete 6 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 2 voltage taps out of place requiring jumpers, DR written 7 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 2 voltage taps out of place requiring jumpers, DR written. 8 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Heater/VT trace over saddle/splice blocks procedure? 9 Fred Nobrega SQXF Coil 2 Status 9/9/2014

SQXF Coil 2 Near Term Plan Install shell and form blocks Roll assembly Prepare inner surface of coil Install base plate, stiffener plate, end plates Epoxy impregnate (pump down) ~ 9/22 SQXF Coil 2 Status 9/9/ Fred Nobrega