31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

SOME OF THE MOST COMMON TESTING MISTAKES MADE BY TECHNICIANS PERFORMING VERIFICATIONS TO CAN/ULC The reason I know some of them is because I have.
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Walls crates cables gas chambers electronics CERN adb.
Electrical Power Systems
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Welcome To The Benton County Radio Operators Monthly Get Together.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Tracker Summary Alan Bross MICE CM October 10, 2007.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
2003/Oct/19 version.Page 1 Aerogel HV cable assembling procedures (for W1-NORTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
13 September 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Delivery Installation Connector work Testing Summary.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
V. Bobillier1 Cable installation status.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Mauro Citterio - Mi meeting
Agricultural Science Career Development Event Electric Power
Ladder Assembly All tools and jigs produced Glue dispensing works
Renovation of the 45-year old PS magnets
DOM integration meeting
Chamber Design and Integration RE3/1 and RE4/1
DT Infrastructure: LV, HV, Gas
Pierluigi Paolucci - I.N.F.N. Naples
Personal Protective Equipment
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Limited Streamer Tube Project Summary
Presentation transcript:

31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing

31 January 2006A.Ciocio - SCTSG2 Status of Type IV Installation Type IV cables are delivered in double lengths with connectors installed at the PP3 end and pulled between the UX15 cavern and the US/USA halls US side completed (October) 2044 cables + spares USA side installation started (end of October) Problematic Delivery for 2 months until production officially stopped just before xmas –Only 692 cables received in the 2 month period –Technical problem with wires insulation – Production stopped since the company could not continue with the level of 30% failure and rework

31 January 2006A.Ciocio - SCTSG3 Type IV connector When the stranded 14 AWG conductors receive their plastic coating, some strands are poorly aligned, and the conductor jacket has thin places. The jacket can split when the conductor is bent in a small radius. Options: Replace 100 Km cable Novacavi can’t figure out how to improve their production Delay Use a bigger hood – less bending Modify PP3 Delay Use shrink tube over or to replace the insulation

31 January 2006A.Ciocio - SCTSG4 Type IV Connector (cont’d) Preferred solution: strip the insulation from the four power cables completely, and replace it with heat shrink

31 January 2006A.Ciocio - SCTSG5 Type IV (cont’d) –Previous pictures show a good sample but the insulation of the HV cable and the fat power cables were squashed inside the strain relief clamp –Still working with KontaktSysteme to get a better sample before giving the green light to resume production. Hopefully next week Installation of type IV is still on hold or it might be interrupted by type ii/iii Still undefined schedule

31 January 2006A.Ciocio - SCTSG6 Connectors in situ All double harnesses installed in US15 racks are cut to 1 meter extra on the PS end and connectors are installed in situ by an external company CPE(Italy) was selected to do the job Technical appendix in EDMS and Workpackage produced –Several meetings including a one full day at CERN with CPE senior engineers to improve their methods and define all the issues (cutting to length, tooling, plan, QC) –A team of 10 came in December. –The work started 2 weeks before XMAS mostly to understand how to cut to length, make more samples, plan the big job. –6 came back on January 9 –First rack fully assembled on January 20 –Test of plug in PS backplane – all cables are cut to 2 cm contingency –Electrical test – a few connectors needed rework – OK now –3 racks are worked on in parallel –Add shrink tube on power wires (because of unlikely but possible insulation problem also on this side) –Goal: 2 racks/week completed (realistically 1.5)

31 January 2006A.Ciocio - SCTSG7 Status of PP3 PP3 units are coming but need more –First 100 units were received in October –~1000 by December –1401 units currently at CERN Testing –Shaun Roe carries on the testing and burn-in. –60 units can be tested at the time (2 PP3 crates) with the current number of test cables available – 40 more cables are under construction –24 hours with monitoring continuity on all lines, while varying the dummy load so that the Vcc and Vdd currents go to zero and the full power supply voltage is seen on the PP3. –Voltage limiter test by applying 6V to each PP3 in turn (manually) –Didier Ferrere has also tested one PP3 with a module, again simulating the situation where the module loses the clock and draws no current, while observing Vdd and Vcc with an oscilloscope. He reports no voltage spike observed. –Currently the entire chain (modules/final cables/PP3/PS) in SR1 –Shift for testing and assembly Installation –Cables are plugged in a few dummy Patch Panels during installation to be placed in the right (final) position and are tightened to horizontal bars –Cables will have to be all removed from the current position and plugged in by groups/rows when the installation of the real PP3 will occur –Ashley French and Scott Moncrieff (Melbourne) worked on assembly and installation in November/December –Estimated installation of 90 units per day (limited today by testing capability and problems) –10 PP3 subracks have been installed so far –30 subracks assembled –Problems The plastic support feet of the PCB inside the metal casing of the PP3 had been broken in some cases and the PCB was therefore moving at one end – replaced and under investigation Ground contact between magnetic shields and/or strap holder due to the screw heads protruding above the surface Solution by applying kapton strips to cover screw-heads Current Plan –Rework of remaining subracks (10) that don’t have kapton tape on screws –Produce 200 PP3s for first rack where connector hood is bigger needs more tolerance (shorter standoffs) –Installation of PP3s in racks to which type III cables arrive with highest priority –Edward (Cracow) and Vladimir (Protvino) for the next 2 weeks – need people to continue at full speed after that (Melbourne, Freiburg …)

31 January 2006A.Ciocio - SCTSG8 Testing Tester designed and provided by Ljubljana (Gregor, Erik) –3 Test boxes + 1 coming, 2 Laptops test cables Test steps (for Type IV): –Cables are tested at reception (acceptance test) –After being routed from UX15 to US(A)15 (uncut-double length) –After connectors are installed Test steps (for Type II/III) –Cables are tested at reception (only samples of delivered batches) –After installation row by row in the cable tray –Prague has produced feedthrough board for testing with PS crates Shift planner (developed by D. Robinson) works very well for planning the activities and have people to sign up –(and contact me because of unexpected changing in rate delivery/testing problems) What is needed to be able to take a shift: 1)take the safety training course (level video in B55) Level 4 for working in US15 + Oxybox (we have them) If you have an AIS LOGIN (used for EDH documents), you can follow the course from anywhere (even outside CERN) with AIS login by accessing If you have no AIS LOGIN, you need to register at the following address 2)make the access request on EDH 3)get your safety boots & helmet (or borrow them)

31 January 2006A.Ciocio - SCTSG9 Database Discussion with ID people about the equipment ID for MTF Can probably take items id’s from SCT (and Pixel) production database Still defining PS and ROD items

31 January 2006A.Ciocio - SCTSG10 LINKS Summary SCT Cables Web page – Mapping – Shifts – Safety courses –Level –Level 4: with AIS login Overall Safety and Health Procedure Document – Rack Wizard – ID installation Tuesday mornings, CRM (control room management) meetings Wednesday mornings ID/TC installation meeting December 05 TMB –