SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.

Slides:



Advertisements
Similar presentations
Summary of NFPA 101 Interior Finish Requirements
Advertisements

1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Properties of cast resin transformers
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Enclosure Fire Dynamics Chapter 1: Introduction Chapter 2: Qualitative description of enclosure fires Chapter 3: Energy release rates Chapter 4: Plumes.
Enclosure Fire Dynamics
Reducing Arc Flash Hazard in 3Ø Pad Mounted Transformers and Other Safety Considerations Presented at Western Energy Institute October 12, 2010 Christian.
Circuit Protection Electrical circuits require protection to prevent fire or electrocution in the event of a fault. There are two main types of circuit.
Fire Simulation Software Carlos Gonzalez Garza. Objectives  European Building Regulations.  Combustion  Computational Fluid Dynamics  Discretization.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Electrical Safety This material was produced under a grant (SH22249SH1) from the Occupational Safety and Health Administration, U.S. Department of Labor.
Ralf Trant on behalf of the HSE team Health, safety and environment.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Control Rooms  Serve as operations centers for the control and monitoring of a service or process  Flight control rooms  Power generation control rooms.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
CXS490 Carbon Dioxide Systems
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Mrs. Brinston. a. Electrical malfunction is the second leading cause of fires in hospitals. b. Fortunately, electricity is also the most manageable of.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
2 DGS-SEE SEMINAR ON FIRE PROTECTION FOR PHYSICS RESEARCH FACILITIES OCTOBER 2015 CERN FIRE SIMULATIONS IN THE PS ACCELERATOR TUNNEL TO DEFINE A.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Electrical Safety and Electrical Safe Work Practices EHS Course #525 Reference EHS Electrical Safety Procedure
DGS/SEE Seminar on Fire Protection for Physics Research Facilities 7 and 8 October 2015 CERN Introduction status and perspectives S. La Mendola DGS/SEE/XP.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Fire Resistance of the Load Bearing Structure of High Bay and Instrument Halls Fire and Egress Safety Analysis of the Instrument Halls Björn Yndemark WSP.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
DGS/SEETerritorial Safety Officer (TSO) - Initial Territorial Safety Officer (TSO) – Initial course SPECIFIC HAZARDS ELECTRICITY EDMS No
Office of Highway Safety Fire Cause and Propagation.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
FCC Week April 2016 Rome FCC collaboration “fire safety” S. La Mendola and M. Plagge HSE/SEE/XP R. Trant TE/HDO 14/04/
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Update on the PSB Cooling and Ventilation Systems
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Equipment simplified model SMR UR safety
Dielectric Oil Installations
SOME PROBLEMS FOR ASSESSMENT OF FIRE IN ROAD TUNNELS
Quick help for fault location and reliable detection of defects
COOLING & VENTILATION INFRASTRUCTURE
Business opportunities related to CERN electrical network
Fire protection and prevention
ICT & Environment Seminar
Quick help for fault location and reliable detection of defects
Workshop on fire protection for physics research facilities
FCC study – Fire collaboration WP4 Status & Update
North Area Safety Review 2019
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015

RF System – HV converters (TE-EPC): capacitors at 10kV (no liquid insulation) or 40kV (oil insulation) – Control racks: PLC, cables, PCBs, etc. - classical combustible material – Tetrodes: no identified combustible Power Converters – No oil insulation – Use of small electro-chemical capacitors – Classical combustible materials: cables, PCBs and plastics for capacitors – Mainly copper and metallic component – All components will be in a metallic enclosure not tight – For capacitors some data will be sent to assess impact FIRE LOADS ASSESSMENT (Ongoing)

Electrical distribution – UPS Batteries – Heating Cables in X cable trays – Dry Transformers Cryogenics – Compressors??? – Control racks Cooling & ventilation – Fans, motors??? – Cables – Control racks FIRE LOADS ASSESSMENT (Ongoing)

Transport – Electrical motors??? – Batteries (special vehicles)?? – Control racks Others??? FIRE LOADS ASSESSMENT (Ongoing)

Burning of electronic cabinets and cable trays Main failure modes: 1.Overheating; 2.Short circuit and ground fault; 3.Arcing

Protection measures for cabinets Interior and exterior fire protection (for example according to DIN “Fire behaviour of building materials and building components”) Similar cabinet used for R2E project

Protection measures for cabinets Typically suppression systems are made up of either of the following suppression agents: CO 2 Foam Water Powder Etc. System already in place in ATLAS, ALICE, LHCb and CMS, using different control systems (5 kg bottles CO 2 ) for 52U standard racks. They are based on thermocable and smoke detection. See EDMS “Options for the use of the MiniMax System”

Protection measures for cable trays Tested against EN “Fire resistance tests for service installations Part 11: Fire protective systems for cable systems and associated components” Classified against EN , e.g. EI-S 120 (v e h o i↔o), where E = Integrity I = Insulation S = smoke leakage, less than 200 m 3 /(m 2 ∙h) 120 = duration of fire resistance in minutes

Smoke hazard characterization Literature review Calorimetric fire experiments on electronic cabinets, J. Mangs et Al. Characterization of closed-doors electrical cabinet fires in compartments, W. Plumecocq et Al. Characterization of the fire environments in central offices of the telecommunications industry, A. Tewardson Energy balance in a confined fire compartment to assess the heat release rate of an electrical cabinet fire, M. Coutin et Al. Risk analysis of the LHC underground area at CERN – Fire risk due to faulty electrical equipment, A. Harrison Modelling of electrical cabinet fires based on the CARMELA experimental program

Combustion of electronic cabinets Experimental apparatus, results and models Growth phase Decay phase

Fire Modelling Tools: Quick method to Calculate Fire Load of Cable Trays and Ladders. F. Corsanego DGS/SEE/XP, EDMS Fire Modelling Tools: Characterization of burning behaviour of a stack of horizontal cable trays – unconstrained fire F. Corsanego DGS/SEE/XP, EDMS Combustion of cable trays, available models

Simplified calculation of necessary smoke extraction flow rate Reference smoke extraction flow rate for the tunnel of m 3 /h. See for example Enclosure Fire Dynamics, Karlsson and Quintiere

Definition of smoke extraction concept with EN/CV Organization of the underground volumes in «smoke compartments». Extraction ducts dimensioned for one compartment (18000 m 3 /h). Natural fresh air intake from the access shaft (openings in surface building) Use of smoke curtains (EN ) to define the compartment limits. Use of fire rated smoke extraction ducts (EI-S 120 v e h o ) for multiple compartments (EN ). Higher smoke extraction flow rate for the cryo cavern. One additional smoke extraction duct.

Evacuation of occupants Evacuation of occupants can be simulated (e.g. agent based software, analytical calculations) taking into account the smoke dynamics (production, propagation, extraction) Tenability thresholds are established (visibility, temperature, etc.); t RSET < t ASET (ISO “Fire safety engineering – Evaluation of behavior and movement of people) RSET = Required Safe Egress Time ASET = Available Safe Egress Time

Possible ground for cooperation with universities Contact with Lund university established Possible collaborations in fire and evacuation modeling for HL-LHC

Questions?