Bubble Chamber Planning Meeting 04 September 2013 1.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

EMMA LAYOUT Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Bubble Chamber Experimental Readiness Review September.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Steigerwald results reported in SPIN 2000 JLab measurements in June 2012 after 12 years good agreement Results depend on (energy=same, targets=same, TOF.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Introduction to Bubble Chamber: Ops Training September.
Bubble Chamber: Experimental Overview August 18, 2015.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Overview of the GlueX Tagger and Photon Beamline..
The Stripping Foil Test Stand in the Linac4 Transfer Line
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Bubble Chamber Planning Meeting 07 August
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Bubble Chamber: Status and Test September 1, 2015.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
High energy beam transport.
Test of Optical Stochastic Cooling in CESR
Bubble Chamber Planning Meeting
Electron Beam Setup for Bubble Chamber
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
PEPPo Experiment Readiness Review
UITF MPS system requirements
Introduction to Bubble Chamber: Ops Training
Bubble Chamber – Beam Requirements
Photons centered on collimator
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
CLIC damping rings working plan towards the CDR
J. Seeman Assistant Director for PPA/LCLS
Bubble Chamber Experiments at UITF
(WBS ) Alan Wootton, LLNL April 24, 2002
Installation and Beam Test Schedule
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Maximum Credible Beam Event Paul Emma et al
Extraction Michael Bevins May 17, 2007
Ion Source and LEBT Beam Diagnostics
Two-beam Test-stand Design and Construction Status
UITF Conduct of Operations Review
Cu67 Isotope Radiator & Target
Isotope Readiness Review Run Plans
Presentation transcript:

Bubble Chamber Planning Meeting 04 September

Agenda 1.Bubble Chamber progress at Argonne 2.Superheated Liquids to be used in the experiment 3.Beamline Layout 4.Bubble Chamber cost estimate: procurement and labor 5.Error Analysis 2

I.List of superheated liquids to be used in the experiment: II.Readout: I.Digital Camera II.Need Acoustic Signal to discriminate between (γ,α) and (γ,n) events Superheated Liquids 3 N 2 O Targets 16 O 17 O 18 O Natural Target99.757%0.038%0.205% 16 O TargetDepleted > 5, O TargetEnriched > 80% <1.0% 18 O Target<1.0%Enriched > 80%

I.Will not install BPM on Spectrometer line II.2 Super Harps to measure beam profile and absolute beam position (no need for Quads) III.Fast Valve to protect from vacuum failure: on our beamline or just in front of ¼ Cryo-unit IV.Do we want vacuum pipe to connect vacuum window to chamber? V.Beam Properties at Radiator: Beamline Layout Beam Kinetic Energy, (MeV)3.0 – 8.5 Beam Current (µA)0.01 – 100 Absolute Beam Energy0.1% Relative Beam Energy0.1% Energy Resolution (Spread), σ T /T0.06% Beam Size, σ x,y (mm)1 – 2 4

42” 25° 100” Valve Ion Pump Viewer BPM Corrector 35” Fast Valve BPM Corrector Radiator Viewer Ion Pump 55” Sweep Dipole 25° Vacuum Window Cu Collimator Electron Dump Photon Dump 92” Bubble Chamber 81” 5 Faraday Cup Super HARP Super HARP Or in front of ¼ Cryo-unit

Cost Estimate 6 I.Radiator motion and Sweep Dipole must be in FSD II.BCM0L02 and Electron Dump in Beam Loss Accounting (BLA) III.New beamline components: 2 Super Harps + Fast Valve IV.Summary of labor cost by group: GroupLabor Survey & Alignment3 wks x 2 Magnet Test1 wk x 2 Engineering Design12 wks Software3 wks x 2 EES6 wk x 2 EH&Q4 wks

7 ItemMaterial Procurement ShopLabor New Dipole MagnetDipole Magnet ($8,000) Hall Probe ($2,000) Mapping (1 week) EESDC (1 week) Alignment (2 days) New Power SupplyPower Supply ($5,000)Software (2 weeks) New Beamline2 Super Harps and Fast Valve ($30,000) Pipes + Pedestals ($20,000)Design (6 weeks) Alignment (1 week) Software (4 weeks) EES (5 weeks) Radiator (cooled ladder, FSD) 0.02 and 0.10 mm Cu foils ($2,000) $4,000Design (2 week) Alignment (2 days) Sweep Dipole Electron DumpPure Cu ($5,000)Dump + Pipes ($15,000)Design (2 week) Alignment (1 day) Cu CollimatorPure Cu ($5,000)Collimator + Stand ($5,000)Design (1 week) Alignment (1 day) Photon Dump & StandPure Al ($3,000)$4,000Design (1 week) Alignment (1 day) Safety Review4 weeks Install6 weeks Bubble ChamberAlignment (1 week) Total$60,000$48,000$60,000 Total (with overhead)$75,000$60,000$90,000