(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.

Slides:



Advertisements
Similar presentations
Design and Implementation of Low- Cost Optical Telemetry to Support Radiometric Analysis of the Atmosphere University of Colorado at Boulder Alexandra.
Advertisements

RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Critical Analysis Review NMSGC Student Launch Program University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
UNC ROVERSAT IV University of Northern Colorado Critical Design Review Friday, June
Stevens Institute of Technology - New Jersey Space Grant Consortium with Rutgers University Critical Design Review Mike Giglia, Ethan Hayon Robert Hopkins.
SloshSAT Preliminary Design Review Dr. Robert Walch Dan Welsh Maurice Woods III Motoaki Honda Zach Sears 6/11/2010.
Preliminary Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
DUNLOP LUNAX-II Conceptual Design Review Star Mission to the Moon-X1 Dan Hawk, Dr Schmitt, Dr Konings-Dudin October 13, 2009.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
University of Wyoming Charles Galey, Nicholas Roder, Peter J. Jay, William Ryan 10/14/
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Good Vibrations Conceptual Design Review University of Wyoming James Richey, Justin Thornton, Luke Voss, Jake Thatcher, Tony Allais Oct 27, 2008.
Rock Sat-C Conceptual Design Review The New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Mike Giglia, Ethan.
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
Team Name Final Presentation Team Members Date Rev
2011 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
SloshSAT Conceptual Design Review Dr. Robert Walch Sage Andorka Dan Welsh Zach Sears Maurice Woods III Motoaki Honda Ryan Estrick 14 Oct
NORTHWEST NAZARENE UNIVERSITY CHAD LARSON, BEN GORDON, DAVID VINSON, SETH LEIJA, ZACH THOMAS, DREW JOHNSON NNU Team Conceptual Design Review.
RockSat-C 2011 CoDR Harding Flying Bison ROCKSAT-C Team Conceptual Design Review Harding University Ed Wilson, Mentor, Will Waldron, Student 2, Student.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
Critical Design Review Team Name University/Institution Team Members Date.
2014 CDR Team Name Critical Design Review CDR CDR Delieverables 1.Mechanical drawings in pdf format 2.Electrical schematics in pdf format 3.Completed.
RamRack Preliminary Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
MINNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Tom Thoe Bryce Doug Carlson 11/14/2008.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
User notes: –Please use this template to create your Proposal Analysis Review –You may reformat this to fit your design, but make sure you cover the information.
Critical Design Review Team Name University/Institution Team Members Date.
Hy-V.1 Skin Friction Sensor Experiment Presenters: Ryan F. Johnson Mitchell Foral-Systems November 24, 2008 University of Virginia.
User notes: –The purpose of the flight readiness review is to determine if your experiment is ready to fly. If it is not ready – it will not fly –You must.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Full Mission Simulation Test Report SloshSAT University of Northern Colorado Team Members: Sage Andorka Dan Welsh Motoaki Honda Maurice Woods III Zach.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Critical Design Review The University of Northern Colorado GoGreenSAT Jessica Gage, Max Woods, Brent Hill, Ryan Marshall, Zach Sears Feb
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
BlackBox Sat Critical Design Review Colorado State University-Pueblo April 2, 2004 Greg Barela Jose Segovia Enrique Cornejo.
Temple University Advisors: Dr. John Helferty & Dr. Chang-Hee Won Charles Wright Jinyan Chen Billy Cheng Brittany Gray 1.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Hydraulic System.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
SENSOR SELECTION CALIBRATION OVERVIEWOVERVIEW DESIGN ROADMAP ACKNOWLEDGEMENTSACKNOWLEDGEMENTS The project would not have been possible without the extensive.
Full Mission Simulation Test Report RocketSat CU Boulder
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
SloshSAT Colorado Space Grant Consortium Space Symposium Sage Andorka Dan Welsh Zach Sears Maurice Woods III Motoaki Honda 17 April
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
SOAREX VII Mission Design, construct, test, and fly an ultralight (
Critical Design Review Team Name
Team Name Conceptual Design Review
Team Name Conceptual Design Review
Launch Readiness Report West Virginia University
Presentation transcript:

(PDR ) University of Northern Colorado Nathan and Casey 11/14/08

Due to acceleration of their containers onboard liquids manifest reactive forces on their containers. These forces can have adverse effects on the performance of the vehicle. A simpler analytical model is presented to describe liquid slosh. This simplified model, although not comprehensive, may yield practical results. An experiment to verify the validity of such an analytical model will be conducted. By comparing the predictions made by the analytical model and actual slosh data, the accuracy of such a model can be assessed. Problem: Solution: Experiment: Mission Overview

Objective The primary mission of the SplashSAT experiment is to determine the validity of our analytical method. Method In order to validate our hypothesis we will measure the motion of a fluid filled container aboard the sounding rocket. Comparison of experimental data and mathematical modeling will allow us to check the accuracy of such a model. Mission Overview

Mission Requirements Provide quantitative data about the motion of the canister along the rail.

Subsystems Power System: -Provide 2.5 W of continuous power. -Must supply power for 45 min. Data Storage: -All data will be stored on non-volatile memory. Thermo Control: -System will not be bellow 40 degrees F -System will not be above 100 degrees F (We can not have the water freeze or evaporate) Structures: -No water shall be released into the canister environment.

Special Requirements NONE

Experiment (5V) IR Atmega32 Accelerometers (3.3V) Mechanical Restraints Data Logger SD Card Power Battery Kill G-switch Latch 5 V Reg 3.3 V Reg Power Switch (5V) 5 V Out 3.3 V Out Block Diagrams

Caniste r View

Canister Picture Full

Front Wall

Side Wall

Top View

Electrical Schematics

Software Flow Chart Activation of G- Switch Data Logger Initializes Read Accelerometer Read Encoder Perform Velocity Calculation Write to Data Logger Active – When the G-switch is enabled data collection will begin. (It will collected data until the battery runs out) Memory Budget Samples per Second - Each Sample is 4 bytes - 4 KB per Second - 72 MB

Test Plans What type of testing can be performed on your payload pre-flight? -Bench test -Electrical Test -Vibe/Shake Test What is required to complete testing?: -Both support hardware and software need be purchased.

Test Plans Potential points of failure - Liquid filled canister leaking -Premature activation

Parts List PartAmount ($)Manufacture 3-Axis Accelerometers$30.00DigiKey NiCd Battery$20.00Local Hobby Store G-Switch$10.00DigiKey Experimental Apparatus$150.00BigBlueSaw.com Photo-Gates (4)$80.00DigiKey SD CardSupplied by UNCIn House Data Logger$60.00SparkFun Power System$20.00DigiKey Atmega32$10.00DigiKey Mechanical Restraints$20.00In House Latch$15.00DigiKey TOTAL$415.00

RockSat Payload Canister User Guide Compliance –Mass, Volume To be determined, we would like to discus this in our teleconference. –Payload activation? The payload will be activated by a g-switch upon launch It will comply with Wallops “no volt” requirement with a kill switch.

Shared Can Logistics Plan To be determined, we would like to discus this in our teleconference.

Updated Organizational Chart Nate (Flight Lead) Casey (Minion ) JUS T DO IT

Updated Mass Estimates AssemblyMass (gram) Electronics Board 200 Experimental Apparatus1000 Battery600 Chassis 700 (Aluminum) or 450 (Magnesium TOTAL2250 or 2500

Conclusions Issues and Concerns 1)Is our payload viable with the dimension requirements of the canister? 2) Does our design allow accessibility for other payloads? 3) Is our onboard liquid going to be a concern?