GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.

Slides:



Advertisements
Similar presentations
CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
Advertisements

TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
European Roadmaps for Research Infrastructures presentation by Hans Chang (chair ESFRI) (1st meeting ESFRI Steering Groups, autumn 2005)
1 AAO AusGO : 29 June 2009 Demystifying the Queue at Gemini Observatory AAO Epping - 29 June 2009 Henry Lee Gemini South, Chile.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
Ho-Il KIM Contents K-GMT Project GMT : Off-Axis Primary #1 GMT1 Surface Maps Primary Mirror Covers 1 st Generation Instruments Instrument.
VISTA as seen by the Prime Contractor Adrian Russell.
Conversation with ACCORD on GSMT 21 January 2005 Michael S. Turner, Assistant Director Directorate for Mathematical & Physics Sciences National Science.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Future of the GMT Warrick Couch Swinburne University Centre for Astrophysics and Supercomputing GMT2010: Opening New Frontiers with the Giant Magellan.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
1 Framework Programme 7 Guide for Applicants
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
2013 Survey Science Group Workshop, Feb High-1 Resort.
European Extremely Large Telescope - Status April ESO.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Gemini and the MNRF: An Update Gary Da Costa Chair, Australian Gemini Steering Committee.
APACE Commissioning Event 30 April 2012 THE POLICE AND CRIME PLAN John Smith Chief Executive, Avon & Somerset Police Authority.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
MNRF Management and milestone achievements Chris Evans AAO.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
OWL Concept Design Review Report to ESO Council 8 th Dec 2005.
Introduction of RAVEN Internal meeting on future instrument projects at Subaru Shin Oya ( Subaru Telescope/NAOJ) ‏ Hilo.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Science Concept for Additional Functionality in the Mosaic Planning Tool Jeff Valenti.
Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.
AAAC Jim Ulvestad December 1, Divestment issues  “Divestment,” in the parlance of the Portfolio Review, implies removal of a telescope from the.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
The SALT Development Committee Recommendations Regarding New Instruments (Matt Bershady) Rob Fesen Janusz Kaluzny Wolfram Kollatschney Darragh O’Donoghue.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
1 Mandate and governance of the New United Nations Committee of Experts.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
Future Blanco Instrumentation and how to get it…
Community Science Updates
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
SCLF Science Considerations for Discussion
Observatory Science Operations
Observatory Science Operations
Scientific Potential Current Design Efforts Complementarity with JWST
Report by the Long Range Planning Committee Paolo Dario
Matter and Technologies
Presentation transcript:

GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee

After initial ideas at the 2006 telescope conceptual design review, in 2009 a call for instrument concept studies was issued. The SAC recommended 6 proposals for funding (from 9 received): GMACS – low res, optical, multi-slit spectrograph(s), natural seeing NIRMOS – low res, near-IR, multi-slit spectrograph, natural seeing G-CLEF – high res, optical spectrograph, natural seeing GMTNIRS – high res, 1-5um spectrograph, AO-fed GMTIFS – 1-2.5um IFU spectrograph, AO-fed TIGER – 3-25um high spatial / high contrast Imager, AO-fed Plus (regarded as a facility, not an instrument) MANIFEST – flexible fibre system proposed by the AAO capable of feeding GMACS / NIRMOS / G-CLEF

Each Design Study provided: Scientific motivation for the instrument Technical feasibility Conceptual/preliminary design Approximate schedule for fabrication Risk Assessment Cost estimate to ~30% and was reviewed by a panel of experts, including representatives from outside the GMT partnership. Process completed by 3 rd quarter of GMT Project budget for 1 st generation of instruments is ~70M US$. The cost estimates for the 6 instrument concepts totaled about twice this figure, so down-select process was required.

Criteria for selection process: Scientific Opportunities enabled by the instruments Link to GMT Science Case and science interests of partners Balance – science, operations, partner involvement Bright vs Dark time, variable seeing, cloud-cover, water vapour AO vs natural seeing: sky coverage for natural & laser guide stars Complementarity with other ELTs (or not) Synergies with other facilities (LSST, ALMA, JWST, SKA) Commissioning constraints Coordination with AO Commissioning Sequencing telescope and instrumentation commissioning Overall Budget constraints Panel (Instrument Development Advisory Panel) formed to advise the GMT Board on the way forward.

IDAP: Chaired by the SAC Chair with the GMT Project Scientist ex-officio member Other 10 members chosen primarily to represent the partner organizations, though 2 members were from outside the partnership. Members covered a wide range of scientific interests and included both experts and non-experts as regards instrumentation Major membership criterion was ability to take a broad view. After a number of telecons and a face-to-face meeting, recommendation made to the GMT Board, which was accepted. GMT is to proceed with development of: G-CLEF – broad science case was particularly noted. GMTIFS 1-arm version of GMACS IDAP also recommended that the MANIFEST concept be further developed to exploit GMT’s large field-of-view (20’) by feeding GMACS1 and G-CLEF. GMTNIRS to be pursued if additional funds can be found.

Next Step – develop full preliminary designs for these instruments. GMT project itself is moving towards a full complete PDR of the telescope and all its associated systems in April next year. Assuming this review is successfully completed then the project will move into the construction phase. At present the partnership has ~35% of the required build funds.