1 Installation guidelines for Marlon CS rooflights into fibre cement roof.

Slides:



Advertisements
Similar presentations
Depending on number of homes and to maximize construction efficiencies, either a 8 way or 12 way tube bundle is deployed in the cut. At each drop, 1 tube.
Advertisements

Sectional Assembly and Installation
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Erecting Roof Trusses - Gable
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
StranDNA (UK) Limited Installation Guidelines. Agenda  Housekeeping  Current Conventional Chain  Solution: Chain Reaction DNA  Benefits  Installation.
Mortise Locks Created by M.Martin 9/05. Types - your Ref: P45 of textbook.
20th July 2002 Chevron UK full surface tank fire.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
FirstLight Snowboards DIY Puck setup. Decide where you want to put the pucks. If you want you can T nut the board for the ends of the puck like done in.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Pneumatic Arm Assembly Instructions
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Training Seminar May 30 th, am – 9:30am Meet and Greet- Continental breakfast provided 9:30am – 9:45amIntroduction to CAT 5 Hurricane Screens /
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Dimensioning Guidelines
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Hexagons & Hexagonal Prisms. Hexagons Hexagons are 6 sided shapes. Hexagons can be dimensioned in 2 different ways. 1. Across the faces. 2. Across the.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
How to make a teddy parachute back-pack. Number 3 in the series by Arthur Dibble (and the Ted Berets) November 2007 In conjunction with the web site
Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly.
By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.
Scratch Build a Water Tower
Microscope Data Sheet An example of how to fill it out correctly.
Oneone IN-4 Objective: To construct a catapult or series of catapults in order to test an experimental variable. Core Question: How is the experimental.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
17/02/03Designed by Barry Forbes Graphic Communication Hexagons & Hexagonal Prisms.
Flat plate sensor location Installation options For more information: Rod Hyatt, (508) ASKROD.com.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Dimensioning Guidelines
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
DEVELOPMENT OF SURFACES Part I Prof.T.JEYAPOOVAN Department of Mechanical Engineering Hindustan Institute of Technology and Science Chennai , India.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Hexagons & Hexagonal Prisms.
Main Parts of a Drilling Machine
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Map Reading and Interpretation
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Bamboo Roofing Sheets.
Internal and External Screw Threads
Board Replacement Laminate-Angle/Angle & Lock & Fold
Global Exotics Board Replacement
Board Replacement for Floating Floors
Canta Open Canal Manufacturing Procedure
Chapter 3 DIMENSIONING Dimensioning refers to the act of giving dimensions. Dimension is a numerical value expressed in appropriate units of measurement.
Flag Installation on Roll-up Signs
Lock fixed scale vernier scale Vernier Caliper jaws.
Mounting a BalanceBox®650 to a brick wall
Flag Installation on Roll-up Signs
Bone Level Grommets Step-by-Step
Board Replacement for Engineered Glue-Down Hardwood Floors
Template as part of temporary Services Support
Practical Metalworking
Reading a Tape Measure.
ACD transparency - gaps between tiles - holes in tile to attach them
Reading a Tape Measure.
Arthroscopic Superior Capsular Reconstruction With Acellular Dermal Allograft Using Push-In Anchors for Glenoid Fixation  William T. Pennington, M.D.,
Queen Post Truss Queen post trusses are not common in modern construction but they are still used. The example on the right shows exposed queen post trusses.
Omega Selection Center
Presentation transcript:

1 Installation guidelines for Marlon CS rooflights into fibre cement roof

2 Fix fibre cement sheets up to bottom and side of rooflight

3 Temporarily position fibre cement sheet above rooflight position

4 Temporarily position Marlon CS rooflight in position, overlapping fibre cement sheet at both ends.

5 Pilot drill rooflight and mark cement profile at fixing positions, fixing centres to align correctly with thepurlin positions.(alternatively if purlin positions are accurate the Marlon CS rooflight can be pre-drilled to suit purlinpositions before laying into position)

6 Remove Marlon CS rooflightDrill 12 mm diameter holes in Marlon CS rooflight which allow for thermal expansion.Drill fibre cement sheets and remove dust. Apply foam fillers to purlins.Apply Sealing tape to end and side of rooflight position immediately either side of the fixing holes.(Sealing tape to be 6 mm diameter cross linked butyl.)

7 Position pre-drilled Marlon CS rooflight.

8 Apply sealing tape to side and top end of Marlon CS rooflight.

9 Place pre-drilled fibre cement sheet above rooflight.

10 Insert primary fixings.

11 Insert side stitchers.

12 Pre-drill side stitching holes in fibre cement sheet adjacent to rooflight.Before overlapping the side of the Marlon CS rooflight remove dust. Place and fix the fibre cement sheet.

13 Drill Marlon CS rooflight for remaining side lap stitchers through pre-drilled holes in the fibre cementsheet.Insert grommet fixings.