Magnet Energy Recovery Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters Workshop on Special Compact and Low Consumption.

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Maximizing Your IT Budget through Energy Efficiency Heather Feigum Focus on Energy Advisor.
Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Alternating Current Circuits
Workshop on Special Compact and Low Consumption Magnet Design
By Stephen, Victor, Thomas and Tim. What Is a Transformer? A device designed to transfer energy from one electrical circuit to another.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Chapter 22 Alternating-Current Circuits and Machines.
Main article: Leakage inductance
1 Fly-back Converter fall Basic Topology of a Fly-back Converter.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
Alternating Current Circuits
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
STEADY-STATE POWER ANALYSIS
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Powered Magnets, DB Formation and Decelerator Alexey Vorozhtsov (JINR) International Workshop on Linear Colliders October 2010.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Chapter 7 AC Power Analysis
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Frithiof Andreas Jensen Notes from: “Green Technologies developed at Research Infrastructures”
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
Liesbeth Vanherpe, Olivier Crettiez, Alexey Vorozhtsov, Thomas Zickler Quadrupole Electro-magnets for Linac4 at CERN ATS Seminar, CERN, July 11, 2013.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Chapter 31 Lecture 33: Alternating Current Circuits: II HW 11 (problems): 30.58, 30.65, 30.76, 31.12, 31.26, 31.46, 31.56, Due Friday, Dec 11. Final.
East Area Consolidation Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters 04 June 2015.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
CERN Test Beam Update and Schedule
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
REACTIVE POWER COMPENSATION
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Extraction and beamline progress B.Goddard TE/ABT.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Power Supply & Electrical Engineering for sustainable science
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Pulsed Magnet Power Supply Feasibility Study
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
ILC Power and Cooling VM Workshop
St. George Infrastructure
Bending crystals for magnetic and electric dipole moment measurements
Status of the CLIC DR wiggler design and production at BINP
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Islamic University of Gaza
What are transformers and how do they work?
Arc magnet designs Attilio Milanese 13 Oct. 2016
East Area Consolidation
Development of new power supplies for J-PARC MR upgrade
Pierre-Alexandre Thonet
Why are particle accelerators so inefficient?
Present and Future test facilities for High-intensity Targetry CERN
How to control the local beam density
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Magnet Energy Recovery Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters Workshop on Special Compact and Low Consumption Magnet Design CERN November 2014

Presentation Outline Key message: operating mode (dc, cycling, energy recovery) impacts the magnet design as well as system sizing.  Current Cycling Warm Magnets  Illustration of how magnet current cycling vs dc operation can help fund system upgrades using the East Area study. System level gains.  Magnet Energy Recovery  Definition and benefits across the power supply chain  Magnet and system design intersection  An example of how ISR-era magnets hinder the standardisation process and a proposal for collaborative system design. 2

Current Cycling of Warm Magnets 3

The East Experimental Area  Houses five beam lines  Protons derived from the PS  Momentum 3.5 to 24GeV/c  Slow extraction Targets  Beam T7 can be operated as :  a secondary test beam (<10 GeV/c) or  as an Irradiation facility with primary proton beam  T8 is a primary proton beam for DIRAC exp. (up to p+/cycle)  T9 is secondary test beam (<15 GeV/c at 0 mrad production angle)  T10 secondary test beam (<7 GeV/c at 60mrad production angle)  T11 can be used as  test beam (<3.6 GeV/c at 210 mrad) or  as a very large spot (almost 2x2 m2) hadron beam (CLOUD experiment) 4

ZoneTime in PS Supercycle EASTA4301 h EASTB4044 h EASTC3274 h Number of “EAST” area cycles: 7 Beam takes 400ms to 700ms to pass through the beam line Particles in East Area beam lines: 3.5s over 46.8s of the super-cycle! “duty cycle” is only 7.5 % Duty cycle of East Area installations A typical Super-cycle at CERN 46.8s (39 cycles of 1.2s) 5

Future (3 beam lines)Present (5 beam lines) Energy in GWhPrice in kCHFEnergy in GWhPrice in kCHF Electrical energy Total cooling fluid TOTAL energy cost 653 kCHF 480 kCHF Future Energy Consumption  Assuming future operation in continuous mode  The total energy cost will rise by more than 25%  The cooling fluid (mainly water) costs will rise by 25%  Despite fewer users the operating cost is higher  Unless operation is changed to “cycling mode”… Cycling operating mode: Magnet current is reduced to zero while no beam is present in its vacuum chamber (as opposed to the continuous operating mode) 6

Direct versus Cycling operation Magnet typeTotal (1.2sec)RecoverableThermal loss (1.2sec) Quadrupole (26Gev)11kJ6kJ5kJ Small Dipole (26Gev)31.5kJ25kJ6.5kJ Large Dipole (26Gev)101kJ82kJ19kJ 7 * Assuming cost of electricity between 0.05 and 0.065CHF/kWh. 1kJ of energy over a 1.2sec cycle corresponds to 1kJ/1.2sec=0.83kW of average power. Assuming this 1.2sec (PS) cycle repeats for 24hours over 270 working days the total energy required from the power network (for each 1kJ) is 5378kWh/annum. If this energy is not recovered in capacitor banks after every magnet cycle it is returned to the power network and is not remunerated by the provider. Annual cost of electricity for 1kJ: (Non-recoverable/consumed every 1.2seconds) Swiss francs*

Cycling operation  Cycling operation requires a di/dt through the magnet  23/55 magnets do not support cycling due to a solid steel yoke  Eddy currents would heat up the yoke material 8

FUTURE OPERATION (HYPOTHESIS) Zonenumber of cycle per Supercycleduration in 2011 (in hr)duty cycle Total - East % EASTA243015% EASTA on T % EASTA on T % EASTB % CALCULATION RESULTS: ENERGY-WATER CONSUMPTION Pulsed ModeContinuous Mode Energy in MWhPrice in kCHFEnergy in MWhPrice in kCHF Total magnet electrical consumption Water cooling electrical consumption Air cooling electrical consumption Total electricity consumption Total cooling fluid cost TOTAL energy cost 40 kCHF 653 kCHF Cycling Operation: consumption 9

Cycling Operation: Impact  Cycling operation will raise the project costs:  Magnet consolidation of solid steel yokes: 1.3MCHF  Power Converter replacement costs will increase by: 1.5MCHF  Power converter consolidation was already scheduled  Electrical distribution costs will be lower  2x2MVA transformers are sufficient to power the EAST Area (currently 8 transformers)  BUT pulsed operation will result recurring savings:  10GWh/year  600kCHF/year  …and a much smaller carbon from the East Experimental Area AND pay back of the project costs will occur in 5 years 10

The System View 11 From DC to Cycling magnet current:  Reduction of power converter RMS rating by 40-45%  Reduction of power losses in magnets  Reduction of cooling requirements

Magnet Energy Recovery

Definition  Magnet Energy Recovery is a specific variant of power cycling in which energy is stored locally in the power converter instead of returning it to the grid 13

Magnet Energy Recovery Uncontrolled power from grid:  Average AC power: 28kW  Peak AC power: 210kW 14 Controlled power from grid:  AC input power bound to nearly magnet flat-top power level

System Level Gains 15 (Cost: ~225SFr/kJ) Benefits of energy recovery in the converter:  Significantly lower costs of grid interconnection equipment  Grid infrastructure standardisation/standard equipment  Lower capacity of reactive power compensation  Fault ride-through capability of power converters

Magnet and System design intersection

A real example  We are consolidating the electrical circuits of TT2 Transfer line  BTI247+BTI248  BHZ377+BHZ378 The message from the management: « Benefit of this opportunity to generalise the process of building families of power converters for new projects ». One design per circuit is not an option. 17

(c) Rey Hori / KEK A real example  BHZ377 (type HB2/MCB)  2.5m long  Aperture: 320mm(W) × 80mm(H)  639mH/160mΩ, 490A  BTI247 (type HB1/MCA)  2.5m long  Aperture: 320mm(W) × 80mm(H)  62.9mH/15mΩ, 1500A  they have the same aperture, length and integrated field and so,  they store the same amount of B-field energy! E BHZ377 =76.7kJ E BTI247 = 70.7kJ  However, they have different L,R -> standardisation is a challenge! 18

System Design: where to start? The eternal question: “ should we design a magnet to match with a powering system or design a powering system for the magnet in hand?” 19 The Accelerator Engineer:  a certain magnetic cycle shape  the particle beam characteristics  a required bending angle α  field quality etc The Magnet/Power Engineers:  t rise, t fall, t flat-top  Beam rigidity B.ρ  Ampere turns N.I  Mechanical layout α: bending angle ρ: radius I: electrical current N: winding number of turns

A collaborative approach  Bend proton beam by α rad/meter within certain vacuum chamber dimensions  Magnetic cycle duration (e.g.1.2sec), minimum time extraction-to- extraction (e.g.0.9sec so rise and fall time could be 0.3sec each) 20  Calculate beam rigidity, estimate integrated field/magnet length. At this point the energy E in the magnet is known.  Final windings design (number of turns, wire type/cross-section)  Iterate  Magnet energy known. Use current rise time to calculate peak and RMS power needed. and Prms is typically P rms =0.6×P pk  Propose a family of power converters  Finalise system design V max I rms Accelerator Designer Magnet Designer Converter Designer

Conclusions  We anticipate system level improvements in cost and size  By implementing magnet current cycling where possible.  Economic gains in energy costs can often finance the upgrade of dc magnets  By implementing magnet energy recovery inside power converter  Reduction of grid interconnection costs  Better power quality at the PCC of the power converter  Longer lifetime of upstream transformers and  major saving in reactive power compensation capacity  To achieve a compact and cost effective system design  Standardisation of equipment is needed such as standard distribution equipment and power converter bricks that can be modularised  Reduction of magnet consumption offers benefits in the entire power supply chain RMS ratings  A collaborative system design is instrumental in system-wide optimisation 21

Bibliography  G.Le Godec, Energy Recovery and Modular Approach: introduction to a collaboration, TETM, CERN (EDMS )  J.Cottet, J-P.Burnet, Energy balance of the East Area and possible improvements, TETM, CERN  S.Rossini, K.Papastergiou, Analysis of Energy Management Solutions for Cycling Magnet Applications, Technical Report, 2014 [to appear]  D.Tommasini, Practical definitions and formulae for magnets, CERN, Geneva (EDMS )  L.Vanherpe, T.Zickler, A predictive Software Tool for Compatibility Assessment of Magnet Design Requirements and Power Converter Constraints Based on the Stored Magnetic Energy, IEEE Transactions on Magnetics, vol49,   

Examples of converter standard bricks 23