Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR

ESSIP Plan 2014 / Objective FCM032 Objective FCM03 Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Links and contacts

Comprehensive Explanation ESSIP Plan 2014 / Overview LSSIP  This ECAC wide objective aims at: Improving the collaboration between the NM, ANS providers, airports and airspace users in filing and distributing flight plans, Assist airspace users in filing their flight plans and in re-routings according to the airspace availability and ATFM situation. Improve flight plan distribution to increase consistency of flight plan data amongst all parties involved (IFPS/ETFMS, ANS Providers).

What is new or has changed since LSSIP 2013 ESSIP Plan 2014 / Overview LSSIP  SLoAs ASP01 and ASP02 have been finalised.

Link to European ATM Master Plan ESSIP Plan 2014 / Overview LSSIP  OI Step [DCB-0302] - Collaborative Management of Flight Updates  OI Step [IS-0101] - Improved Flight Plan Consistency Pre- Departure  OI Step [IS-0102] - Improved Management of Flight Plan After Departure

Most important SLoA(s) ESSIP Plan 2014 / Overview LSSIP  ASP04 Processing of APL and ACH messages,  ASP05 Automatically provide AFP for Missing flight plans,  ASP06 Automatically provide AFP message for Change of route,  ASP07 Automatically provide AFP message for a Diversion,  ASP09 Provide AFP message for a Change of requested cruising level.  Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Flight Progress Messages document

Finalisation Criteria and Closed Questions ESSIP Plan 2014 / Overview LSSIP  Automatic processing of: Flight plan messages in ICAO format FPLs derived from RPLs  ATC system able to receive and process flight plan data from IFPS in ADEXP format  Processing of APL and ACH messages  Automatic generation and provision to NM of the AFP messages in ADEXP format for: Missing flight plans Route changes Diversions Changes of aircraft type Changes of aircraft equipment

ESSIP Report 2013 ESSIP Plan 2014 / Overview LSSIP  Objective late, with a slight improvement in its implementation since the previous reporting period. The States yet to implement the most essential SLoAs of this objective have shown a sound commitment to do so. However, the likelihood of implementing all SLoAs still remains low.  The implementation of the objective involves a certain level of investments; it is done through the planned upgrades of current ATM systems or the installation of the new ones. At the same time stakeholders do not recognise direct benefit from implementation.  The implementation is not progressing as expected resulting in:  An inefficient use of the available Network capacity  Late provision of flight plan updates to ATC

Objective Coordinator’s Analysis, recommendations, tips & tricks ESSIP Plan 2014 / Overview LSSIP  Implement the most important SLoA(s)  Pay attention to the need for automation of the AFP message  Amend the progress status if necessary  For partial completion of the objective be more specific on what has been completed and the prospects for the rest of the SLoAs.  Ensure that there is an effective link with the NM and the information on the implementation originates from a ODSG member.

Links and contacts ESSIP Plan 2014 / Overview LSSIP Objective Coordinator: Octavian Cioara NMD Objective Expert: S. Smidt