READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.

Slides:



Advertisements
Similar presentations
Concrete & Asphalt. Concrete –Batching – process of proportioning cement, water, aggregates and additives prior to mixing concrete –Concrete specs usually.
Advertisements

Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
Concrete materials, mixture proportioning, and control tests
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
CONCRETE MIX-DESIGN ACI
Properties of Fresh Concrete
Physical Science Applications in Agriculture
EXAMPLE QUESTIONS According to their sizes, aggregates are divided into 2 main groups, write down the names of these groups and give one example for each.
AGGREGATES There are two types of aggregates Coarse Aggregates
Ch8: Proportioning Concrete Mixes
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Concrete
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
Performance Engineered Concrete Mixtures
Mix Design Concrete School
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Learning Objectives Relevance of fresh concrete properties
Prepared by Marcia C. Belcher Construction Engineering Technology
BASIC CONCRETE PRINCIPLES
Proportioning of Concrete Mixtures
Proportioning of Concrete Mixtures
VOLUMETRIC MIXED CONCRETE MOBILE VOLUMETRIC MIXERS.
Batching, Mixing, Transporting, and Handling Concrete
Mix Design Review.
Batching, Mixing, Transporting, and Handling Concrete
Quality Control Testing
Concrete Construction Practices
Severud Associates Consulting Engineers PC Museum of the American Indian Washington, D.C. Yale University Ingalls Hockey Rink New Haven, CT Eventi Hotel.
Concrete Mix Design Technician School
Recycled Concrete Aggregates ET 494-SPRING 2014 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
WELCOME N.C. DEPARTMENT OF TRANSPORTATION MATERIALS AND TESTS UNIT CONCRETE CERTIFICATION SCHOOL.
Intro to Concrete 18.0 & 19.0 Class notes.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
Silver Oak College Of Engineering & Technology.
Hydraulic Slump. Equipment Slump cone & pan 5/8” x 24” long bull-nose rod Concrete scoop 12” ruler Bucket & sponge.
ACI Concrete Mix Design
2. Suliman AYEADH Al-Otaibi Howaidi Mutlaq Al-Shaibani
UNIT: CONCRETE/MASONARY
JUST IN TIME MIXTURE PROPORTIONING Ken W. Day Consultant, Australia.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
Chemical Admixtures In Concrete. What Are They? Ingredients other than: Ingredients other than: –Cement –Water –Aggregates Added before or during mixing.
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
CONCRETE TECHNOLOGY LECTURE NOTES PROF. DR. KAMBİZ RAMYAR
Cement: TYPE I, Specific Gravity=3.15 Coarse Aggregate: (BSG)SSD= 2.70
1/33.  Performance based approach  Definitions and responsibilities  Standard requirements  Exposure classes  Fresh concrete requirements  Hardened.
Composition of cement paste, concrete admixtures and mix design of superplasticized concrete Exercise 4.
JUST IN TIME MIXTURE PROPORTIONING Ken W. Day Consultant, ConAd Australia.
University of Sydney – Structures CONCRETE Peter Smith 1998 Concrete Making and Testing l Unique material çMade specially for each job çHandling on job.
Ready Mix Concrete MADE BY- RUSHABH . H . SHAH STUDENT AT
Batching, Mixing, Transporting, and Handling Concrete Design and Control of Concrete Mixtures – Chapter 13.
Types of Concrete Mixes
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
1 RECO CEMENT PRODUCTS (Roman Ecological Cement).
Concrete Concrete Cement Sand Gravel Water.
BY:- AIYAPPA T.B, 5TH SEM CIVIL, KPT.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Rajan singh rawat INTRODUCTION Admixtures are ingredients other than basic ingredients cement, water and aggregates that are added to.
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Mixing and Pouring Concrete. Proper mixing has been accomplished when: A.Every particle of sand and stone is coated with the cement paste. B.The sand.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
BY: CASIMIR J. BOGNACKI, PE, FACI CHIEF OF MATERIALS ENGINEERING
BASIC CONCRETE PRINCIPLES
Chemical Admixtures In Concrete
CONCRETE MIX DESIGN.
Concrete Production Material Handling Batching Mixing Transporting
Concrete Production Material Handling Batching Mixing Transporting
2018 Revisions to NYCDOB Code
Concrete for Box Culverts – Wet Cast Concrete
CONCRETE MIX DESIGN PRACTICE OF ETHIOPIA AND ITS APPLICATION ON CONSTRUCTION SITES Presented by: Adiamseged Eyassu WORKSHOP ON CONCRETE CONSTRUCTION PRACTICES.
Presentation transcript:

READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.

READY MIX INDUSTRY (BASED ON ASTM C94) BASIS OF PURCHASE BATCHING MIXING TRANSPORTING

BASIS OF PURCHASE: IN ABSENCE OF A DESIGNATED SPECIFICATION, A PURCHASER MUST REQUEST: DESIGNATED SIZE OR SIZES OF AGGREGATE SLUMP REQUIRED AIR ENTRAINMENT – AIR TEST AT PLACEMENT THE CHOICE OF OPTION A,B,OR C FOR PROPORTIONING THE MIX DRY UNIT WEIGHT FOR YIELD TEST (FOR STRUCTURAL LIGHTWEIGHT CONCRETE)

BASIS OF PURCHASE: OPTION A OR C (ASTM C94) MANUFACTURER ASSUMES FULL RESPONSIBILITY FOR SELECTING THE MIX PROPORTIONS PURCHASE HAS TO DECIDE ON THE 28 DAY STRENGTH OPTION B (IN ADDITION) PURCHASE MUST SPECIFY MIN. ALLOWABLE CEMENT CONTENT TO BE USED IN THE MIX DESIGN DESIGNATED SIZE OR SIZES OF AGGREGATE SLUMP REQUIRED AIR ENTRAINMENT – AIR TEST AT PLACEMENT OVEN DRY WEIGHT FOR YIELD TEST (UNIT DRY WT.)

BASIS OF PURCHASE: OPTION B continued (ASTM C94) PURCHASER ASSUMING THE RESPONSIBILITY FOR PROPORTIONING THE CONCRETE MIXTURE SPECIFY CEMENT CONTENT PER CY SPECIFY WATER CONTENT PER CY THE TYPE AND DOSAGE FOR ALL THE ADMIXTURE SIZE OF AGGREGATE AND SLUMP REQUIRED

BATCHING MEASURED BY WEIGHT CEMENT FINE AND COARSE AGGREGATE FLYASH AND POZZOLANS MEASURED BY WEIGHT AND VOLUME WATER ADMIXTURE

BATCHING BATCH PLANTS HOPPER CAN WEIGH CUMULATIVELY OR INDIVIDUALLY AGGREGATES WATER CONTENT HAS TO BE DETERMINED TOTAL MOISTURE =WATER CONTENT TOTAL WET WT. = DRY AGG + WT. OF MOISTURE POWDERED ADMIXTURE ARE MEASURED BY WEIGHT LIQUID ADMIXTURE ARE MEASURED BY WEIGHT OR VOLUME

BATCHING BATCH PLANTS WEIGH BATCHER TRUCK MIXERS COARSE AGG SHOULD BE DISCHARGED BEFORE OTHER INGREDIENTS ALL SCALES HAVE TO BE CALIBRATED

SHOULD NOT EXCEED 63% OF THE DRUM VOLUME MIXING MIXERS AND AGITATORS STATIONARY MIXERS I.E. TILTING DRUM MIXER DISCHARGES WHILE TILTING THE MIXING, IN OPPOSE TO A NON-TILTING MIXER TRUCK MIXERS (AVG CAPACITY IS 8-9 YDS) Note the cliché – “Give me the whole nine yards!” FRONT DISCHARGE REAR DISCHARGE SHOULD NOT EXCEED 63% OF THE DRUM VOLUME AGITATORS (MAYBE TRUCK MIXERS OR AGITATORS) MUST BE ABLE TO DELIVER THOROUGHLY MIX CONCRETE TO THE JOBSITE SHOULD NOT EXCEED 80% OF THE DRUM VOLUME

MIXING UNIFORMITY TEST SAMPLES MUST HAVE THE SAME: SLUMP- SLUMP TEST UNIT WT. – YIELD TEST AIR CONTENT – AIR METER OR AIR TEST STRENGTH – COMPRESSION TEST

MIXING MIXING AND DELIVERY CENTRAL MIX – CONCRETE THAT IS MIXED COMPLETELY IN A STATIONARY MIXER SHRINK MIX- CONCRETE THAT IS FIRST PARTIALLY MIXED IN A STATIONARY MIXER, AND THEN MIXED COMPLETELY IN A TRUCK MIXER TRUCK MIX –CONCRETE THAT IS COMPLETELY MIXED IN A TRUCK MIXER, 70-100 REVOLUTIONS AT THE MIXING SPEED

MIXING NON-AGITATING MIXING REQUIRES SLUMP TEST USED FOR SHORTER HAULS

TRANSPORTING JOB SITE CONTROL NO ADDITIONAL WATER CAN BE ADDED EXCEPT IF SLUMP DOES NOT REACH SPECIFIED SPEC. AND THE WATER CEMENT RATIO IS NOT INCREASED SHRINK MIX- CONCRETE THAT IS FIRST PARTIALLY MIXED IN A STATIONARY MIXER, AND THEN MIXED COMPLETELY IN A TRUCK MIXER TRUCK MIX –CONCRETE THAT IS COMPLETELY MIXED IN A TRUCK MIXER, 70-100 REVOLUTIONS AT THE MIXING SPEED

TRANSPORTING INSPECTION AT THE JOBSITE CONCRETE MUST BE TESTED FOR SLUMP, AIR CONTENT, AND STRENGTH ACI CERTIFICATION FOR CONCRETE FIELD TESTING TECHNICIAN – GRADE LEVEL I ONE STRENGTH TEST IS PREPARED FOR EVERY 150 CY AND AT LEAST ONE FOR EACH DAY THE CONCRETE IS DELIVERED OR FOR EACH CLASS OF CONCRETE (I.E. CLASS A,B OR C ) AT LEAST THREE STRENGTH TEST SHOULD BE MADE AND AVERAGE I.E. FOR A 4000 PSI CONCRETE THREE SAMPLES - 4400 3600 4300 GIVES AN AVERAGE 4100 AND NONE OF THEM ARE LESS THAN 500 PSI BELOW THE SPECIFY STRENGTH