Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
LS1 Cabling Progress LS1 Committee (LSC) – 21 June 2013 Daniel RICCI on behalf of the Cabling and Optical Fibre Section (EN-EL-CF) EDMS
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Extraction and beamline progress B.Goddard TE/ABT.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Computer Security Sample security policy Dr Alexei Vernitski.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
YETS & LS2 Works EN-EL / Power distribution
ITER-CERN Workshop CERN EN/EL Installation contract policy 17 January 2017 Serge OLIGER On behalf of the Electrical Engineering Group (EN-EL) at CERN.
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Works EN-El on LHC / Power distribution
Identification of the unused cables
ITER-CERN Workshop CERN approach to the large-scale installation of Fibre Optics & Cabling 17 Jan 2017 Daniel RICCI On behalf of the Electrical Engineering.
Injector De-cabling Project
TE-MPE LS1 review Vision from EN-EL(CF)
YETS & LS2 Reminder G. Girardot 20 juin 2017.
the high-voltage network of CERN ToMORROW
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
Status with crucial LSS5 kicker transmission line cables
ILO Industrial Opportunities Days, 6-7 June 2019
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1

What is cabling? 27/09/2013 F Duval Cabling acxtivities LIU 2 1.Contract Management 2.Parc à Cable 3.Cablotheque 4.Preparation of the work 5.Cabling campaigns 6.Infrastructure 7.Radioprotection & radiation resistance

Contract management 27/09/2013 F Duval Cabling acxtivities LIU 3 Based on a 3 years contract with one (or more) installation company Based on a DQE: every single operation and every single component are included in a price list. – Many options: tunnel, radioprotection, quantities – All administrative work is included Importance of the supervision (works and bills of quantities) New common infrastructure: who pays? Strict control of the invoicing and payment process

Parc à Cable 27/09/2013 F Duval Cabling acxtivities LIU 4 Providing cables needed for installation requests (CTRL & Power distribution) Work together with CERN general store for standard cable procurement Procurement of special (eg. radiation resistant) cables: 635 orders for LS1 Management of the cable transport (going to and coming from the work sites) Rewinding in special drums (tunnel access, special lengths for specific work, etc…) Management of cable lifecycle (re-ordering levels, aging, copper recuperation, etc.)

Cablotheque 27/09/2013 F Duval Cabling acxtivities LIU 5 Database collecting all installed cables characteristics (length, type, routing, identification number, etc...) Interfaced with GESMAR (quotation, invoicing, etc...) Updated by CERN and contractors (monitoring) Essential tool for cleaning campaigns

Preparation of the work 27/09/2013 F Duval Cabling acxtivities LIU 6 Defining (checking) the cable specification matching with the installation constrains (bending radius, UV resistance, radiation resistance, etc...) Defining (checking) the cable specification matching with the electrical requirements (current, voltage, etc.) Installing the necessary infrastructure (cable trays, ducts, etc…) Setting up the necessary tooling and logistics.

Cabling campaigns 27/09/2013 F Duval Cabling acxtivities LIU 7 Every user request is collecting by DIC or DIF, then site works have to be organised by geographical areas. Cost effective, easier scheduling, ALARA effective – Installation campaigns – Cleaning campaigns – Irradiated cable replacement campaigns

Infrastructure 27/09/2013 F Duval Cabling acxtivities LIU 8 For fibres, the backbone (the common infrastructure) is now owned by EL The control cable business is not organized around a backbone  Point-to-point installations  Control cables (and related signals) are specific to each system and therefore owned by users. EL remains the expert for installation and removal. Routing is defined by EL together with integration team

Radioprotection and radiation resistance 27/09/2013 F Duval Cabling acxtivities LIU 9 EL is taking care of the whole radioprotection process (training, ALARA committee, dosimeter, protection suits, waste management) with RP and contractors EL is running research on radiation resistant components (e.g. fibres) EL is managing a WG (RIAC) on radiation effects on cables aiming at steering the future cable replacement campaigns.

Future: Constrains 27/09/2013 F Duval Cabling acxtivities LIU 10 LS2 cabling activities will be much more than LS1 – Only small works or surveys can be done in the machines during Xmas breaks and technical stops – Next step for bulky “underground” activities is LS2 – Cabling activities for LS1 were selected in a much larger batch of requests – Postponed activities (mainly LIU, IT and EN/EL) + already known projects for LS2 already represent more than a half of the LS1 workload

11 SPS: regular replacement carried on until 2009 on a higher trend 1 complete SPS point every shutdown Replacement foreseen every 5/6 years today every >10 years TCT: Top cable tray, AA: Almost All, R: Rest, Part: Partial. Future: irradiated cable replacement 27/09/2013 F Duval Cabling acxtivities LIU

12 Galleries Shafts  Overloaded cable trays do not allow pulling cables in the proper technical way  This situation is general for SPS  In some cases, cables cannot be installed anymore Future: Cleaning of overcrowded areas 27/09/2013 F Duval Cabling acxtivities LIU

13 PS ring centre Gallery TP9 Intersection Linac2-Linac4-PSB Gallery TP9 Intersection Linac2-Linac4-PSB Tunnel TT2 Future: Cleaning of overcrowded areas 27/09/2013 F Duval Cabling acxtivities LIU

14 Bld.361 (under the Booster), room BCER Future: Cleaning of overcrowded areas 27/09/2013 F Duval Cabling acxtivities LIU

15 SPS machine Critical state 1: Point 5 surface, shafts and underground Point 4 surface, shafts and underground Point 3 surface, shafts and underground Critical state 3: Point 6 surface, shafts and underground Point 1 surface, shafts and underground Point 2 surface, shafts and underground Point 7 surface, shafts and underground Critical state 5: TT60, TT70 Shafts are the most critical areas for all points. PS-Complex and Meyrin site Critical state 2:  Bld (under the Booster), rooms BCER, BOR, BAT  Bld.354, room CCR et MNR, gallery 815  Gallery TP9 between Bld.354 and Bld.361  Bld.353 (ring centre) and tunnel of PS Bld.350 accelerator  TT2 entire tunnel (from Build. 269 to TT2A towards nTOF) Critical state 4:  Bld.2001 (upstairs), cable connections from Build.2008 Priorities for Cable Clean Up Future: Cleaning of overcrowded areas 27/09/2013 F Duval Cabling acxtivities LIU

Future: requests 27/09/2013 F Duval Cabling acxtivities LIU 16 Organising huge campaigns on a 5/6 year basis is a challenge (compentency management, Worlkload, contractors) – Having a LS1.5 (more than 4 months of actual underground access) after only 1.5/2 years of operations will be very useful for EL Cleaning of SPS-P5 and Booster (mainly for LIU) areas is proposed by EL (TBC) Beyond the Cabling activities, the Low voltage distribution in PS/PSB has to be consolidated (e.g. safety issues)