CEM 515 Assignment #4 Prepared By Ali S. Fagihi EWPD Rotating Equipment Condition Monitoring Program Workflow Processes.

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

Lubrication – Getting it Right Nick Thomas North Sea & Caspian Sales Manager 11 February 2004 at 1500.
Electrical & Instrument Construction Department
TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
Sail marine Consultancy is to provide high quality marine surveying and consulting services with an emphasis on safety and integrity. Sail marine Consultancy.
ABC Group Management Meeting: ANDON SYSTEM ANDON ABC Group Manufacturing.
VIBRATION AND LUBE OIL PRESSURE SWITCH INSTALLATION AND MONITORING Higgins Station.
January 2003 Chemical Engineering Department King Fahd University of Petroleum & Minerals Dhahran Environment Refinery Petrochemicals Desalination Gas.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Root Cause Analysis Enhancement Jan 21, 2006 Presented by: Mohammed A. Al-Dossary Construction Engineering & Management Quality Management CEM 515 Term.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Environmental Assessment Public Meeting
Machine / TA Inspections Rick Weight Cashman Mining Field Service Supervisor Brett Avery Cashman Field Service Technician.
Department of Industrial & Systems Engineering Florida International University Cyber Manufacturing Blueprint Version 2 November 2, 1998.
The art of Engineering
College Strategic Plan by
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
Introduction and Course overview by S. O. Duffuaa.
Implementing Policies and Procedures Fadwa Bawazir, CPHQ Director, TQM Dept. Hera General Hospital.
How to Present Effective Safety Meetings
Unit 3: Command & Control IC/IMT Interface
Texas Pipeline Association
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
“Safety is a Measure of Success” Presented by: Abdul Waheed – Reliability Engineer Qurayyah Sea Water Maintenance Division May 3, 2009 Presented by: Abdul.
Brooklyn Navy Yard Cogeneration Partners
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2A: KEEPS.
Global Solutions Personal Focus Innovative Energies purpose built 12,500 sq. foot West Auckland manufacturing facility.
REMOTE SITE MANAGEMENT SOLUTION. AGENDA 2  About KoçSistem  Current Situation in Base Stations  Remote Site Management System: Sitelink  Sitelink.
Riyadh Al-Dakheel Group. INTRODUCTION  RDG established in 2000 in the Eastern Province of Saudi Arabia  More than 500 employees are currently working.
Colorado Springs Utilities Environmental Services Functional Assessment Presentation for the American Public Power Association’s 2001 Engineering & Operations.
King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID#
From Research Prototype to Production
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
PRODUCTION OPERATIONS AND MAINTENANCE
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Personnel Requirements for Implementing the New Triad Robert B. Barker December 15, 2005.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
ROLE This position reports to the Chef Service Prevention HSE Member of the IA Ops HSE Division. Provides Technical HSE support to all IA Ops Divisions.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Maritime Saudi Arabia 2010 Agility Logistics.
1 Bill Prymak, US Department of Energy Golden Field Office February 19, 2009 Energy Assessments: What are the Benefits to Small and Medium Facilities?
Tier I Working Group 2 nd Quarter FY 2010 May 14, 2010.
King Fahd University of Petroleum & Minerals College of Computer Sciences & Engineering Computer Science Department Summer Training Presentation 2 July.
High Consequence Areas & Pipeline Assessment Intervals Pipeline Safety Trust New Orleans, LA November 20, 2008 Elizabeth Komiskey, P.E. PHMSA/Office of.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of Implementation.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
My Internship at Saudi Aramco Company
Cryoplant Controls Installation
Ordering Process Dep. At Atlas Copco
Mechanical Engineering Facilities Engineering
Systems Implementation,
Clinical Engineering Lecture (3).
Northeast Biomanufacturing Center and Collaborative
Presented to the Project Certification Committee on November 16, 2011.
AGA Distribution Best Practices Program Control Room Management
Applied Industrial Management (IET 327) Instructor: Dr. Hans Chapman
Term Project: Challenges in supplying Energy to Central Region
Final Design Authorization
Company X ISO9001:2000 Implementation Databases
High wheel space Temperature issues
New York State Utility Inspection & Testing
Presentation transcript:

CEM 515 Assignment #4 Prepared By Ali S. Fagihi EWPD Rotating Equipment Condition Monitoring Program Workflow Processes

East West Pipelines Overview Red Sea Arabian Gulf Abqaiq PS 9 PS 11 PS 8 PS 7 PS 5 PS 4 PS 2 PS 1 Yanbu PS#3 PS#10 PS#6 Vision Pipelines Department Vision is to be a recognized leader in the transport of Oil and Gas, a good environmentally conscious and proud of human and technical excellence. Mission To transport oil, gas and Refined products, through out the Kingdom of Saudi Arabia and operate and maintain pipelines network and facilities in a safe and environmentally responsible manner by utilizing highly qualified workforce and most up to date technologies.

EW Rotating Equipment Overview EquipmentNumber Gas Turbines 82 Pumps513 Motors537 Compressors49 Gearboxes71 Power Gen. 24 Cooling Fans 209 Total1485

EW Condition Monitoring Programs Lube Oil Condition Vibration Survey Analysis Borescope Inspection Condition Monitoring Programs More Reliability & Minimum Down time More Reliability & Minimum Down time

Brainstorming Meeting Between With Our Customer (Operation & Maint.) To Discuss If the Performance Of the Existing CMP. Phase#1 Define The Quality Issue Mission To Improve/Enhance the Existing Condition Monitoring Program Workflow Processes to the best with high quality And Less Cost. Input Output

Equip. Monthly Survey Equipment Survey Report (RE Field Technician) Survey Report Distribution (RE Supervisor) Equipment Report/Alert Review& Approval (RE Supervisor ) Survey Report Review & Issue Required Alerts (RE Engineer ) Report/Alert Distribution To Plant Foreman & Maint. Engineer (RE Clerk ) Manually Entering the Approved Alert Recommendations to the Tracking System & Filling For History (RE Filed Tech. & Engineers) Monthly Follow Up For Open Alerts Status (RE Filed Tech. & Engineers) Issue Monthly Alert Status Report (RE Engineers) Delay in Issuing The Survey Report Effort Duplication Unavailable History For All Levels Less Engineering Filed Involvement Inaccurate UpdateMore Cost Using more Communication Machines Delay In Implementing Eng. Recommendation Customer (Operation& Maint.) Not Satisfied