CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.

Slides:



Advertisements
Similar presentations
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Advertisements

BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Engineering Design Review for TRD-Readout Chamber
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
T.Schneider/LHCb Muon EDR
New results from MMSW Micromegas quadruplet 20/03/2015Michele Bianco RD51 week M. Bianco a, H. Danielsson a, J. Degrange a, R. De Oliveira a, F. Perez.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
RPC Assembly STATUS (Update on Support Panels Crisis) F.G. CERN
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
MICROMEGAS CONNECTICS Electronics Boards And Readout Panels 25 JUNE 2013.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
M. Bianco On behalf of the ATLAS Collaboration
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
ATHENA - Module Construction P. Riedler, J. Rochet.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Aristotle University of Thessaloniki QC – QA readiness at AUTh tooling and procedures D. Sampsonidis, P. Charalampous, S. Kompogiannis, and C. Lampoudis.
Concept Design for LBNF Far detector (LAr single phase)
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GRPC development in Lyon
European DHCAL Meeting 13/06/08
Baby-MIND Modules & Services
Update on Pavia MM mechanical prototype
Remaining items (per module) for panel construction (mostly Fabien)
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Mechanics: (Tim).
Gluing jigs for Demonstrator
Pressure vs height (solid CPA plane)
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Mechanical analysis of Foam and plastic honeycomb panels
Presentation transcript:

CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT

 Concept remind  Vacuum table manufacturing and measurements  MM panels design  Future plans 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT

 A sandwich of two soft skin is glued without mechanical constraints.  A sandwich is: o One glass fibre skin (0.5mm) o Aluminium honeycomb surrounded with an aluminium frame o Second glass fibre skin (0.5mm)  Sandwich schematic view Jordan Degrange/Francisco Perez Gomez PH/DT

 Manufacturing concept o The skins are sucked with two vacuum tables o The vacuum table surfaces are perfectly flat o The vacuum table surfaces are set in parallel position Jordan Degrange / Francisco Perez Gomez PH/DT

 Dimensions: 1300X600  Manufactured at CERN  Outer surface: Epoxy gel coat ‘’EP Gel coat Weiβ’’ (1+1 reinforced layer).  Structural layer: Glass fibre “Glasgewebe FK g/m2 Leinwand’’ + AXSON Epolam 5015 (5 layers).  4 perforated sides aluminium honeycomb.  Araldite 2011

Jordan Degrange - Francisco Perez Gomez CERN PH/DT Gel coat + Glass fibre (3.5mm) Glass fibre (3mm) Perforated Al Honeycomb (60mm) Al profile (60X30mm) Al inserts (Ø40mm)

Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Perforated Al honeycomb

Jordan Degrange - Francisco Perez Gomez CERN PH/DT

CERN Metrology labCERN PH/DT  Temperature: 20°C  Planarity : 0.077mm  Temperature : 21°C  Planarity : 0.08mm  Temperature : 22.5°C  Planarity : 0.03mm  There’s a temperature influence on flatness to be investigated. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

 Reference holes on boards for alignment  Ultem plugs to avoid drilling panels after assembly  All plugs are precisely pre-glued on the board using a dedicated tool  Aluminium frame pre-assembled on tool  Aluminium honeycomb  Araldite 2011 is the best candidate for gluing  Panel manufacturing in one shot Jordan Degrange - Francisco Perez Gomez CERN PH/DT

4 reference holes. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

4 reference holes. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

2 pins Ø5g6 X Ø5,5g6 Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Ref. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Ø5.50 Ø5.0 Jordan Degrange - Francisco Perez Gomez CERN PH/DT Ø5.50

Jordan Degrange - Francisco Perez Gomez CERN PH/DT Alignment pin Reference plug glued Cyanoacrylate 3M EC100

Ref. Spacer Board Alignement Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Ref. Jordan Degrange - Francisco Perez Gomez CERN PH/DT … vacuum pump ON

Jordan Degrange - Francisco Perez Gomez CERN PH/DT

2 reference holes per profile Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Ref. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Vacuum Table Ref. Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Precision shims (11,4mm)

Jordan Degrange - Francisco Perez Gomez CERN PH/DT

 Assembled and glued on drift panel using alignment holes  Mesh glued on well defined surface.  Acts as gas manifold.  Large gluing area.  Ground connection Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Joint groove Ground connection holes Gas IN/OUT

Gas IN/OUT (Ø2,5mm) Gas distribution channel Gas distribution holes (Ø0.5mm  Ø1.5m m) Cleaning channel Surface glued on drift panel Jordan Degrange - Francisco Perez Gomez CERN PH/DT

Alignment pin Board Fixation pins and ground connection Deflection = 0.01mm

Jordan Degrange - Francisco Perez Gomez CERN PH/DT

 Prepare all needed elements for 1 panel assembly (frame, plugs, pins, etc..)  Manufacturing of 1 full set of mesh support.  Investigation of temperature and humidity influence on VT flatness  Drill reference holes on vacuum tables.  Assembly and QC of 1 panel for tooling and procedure validation  Test on gas distribution  Test on mesh gluing  Ground connections tests  Test on zebra fixation  Electrical tests on Zebra connectors Francisco Perez Gomez / Hans Danielsson CERN PH/DT/EM2