Энергетический Углеродный Фонд JI Projects in the Russian Power Industry Mikhail Rogankov Chief Executive Officer acting Energy Carbon Fund Tel.: +7 (095)

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Perspective of JI in Hungary József Feiler Climate Change Unit.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
JI: Russian project developer perspective NCSF March 9-10 th 2006, Bonn National Carbon Sequestration Foundation.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Libor Krkoska Head of office EBRD Bosnia & Herzegovina 18 April 2013 © European Bank for Reconstruction and Development | EBRD – Your partner.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
POWER GENERATION TECHNOLOGIES
Cogeneration.
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Jane.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
1V Int. Scientific and Practical Workshop "Ashes from TPPS", April 24/25, 2014, Moscow, Russia Forecast in Power Production and Impact on CCPs in Europe.
Options for climate friendly technologies for power generation and their related costs and potential environmental impacts Sustainable Energy Development.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Renewables Go Big Big Wind Christian Kjaer Chief Executive Officer European Wind Energy Association European Parliament, 2 September 2009.
RENEWABLE ENERGY POTENTIALS Projections to 2050 BASED ON THE PRESENTATION of Mohamed El-Ashry Chairman REN 21 3rd Ministerial Meeting in Gleneagles Dialogue,
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
1 Coal Mine Methane Emission Reduc tion Projects By Oleg Tailakov UNDP April 29 th, 2008.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Environmental Protection and Infrastructure Operational Programme Tímea Baán EIOP Managing Authority Ministry of Economy and Transport.
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
Experience of SEC “Biomass” in development of JI projects in Ukraine Dr. Georgiy Geletukha SEC Biomass, Ukraine UNFCCC Workshop on Joint Implementation.
Spain: Can we give up any of the primary energy sources? Alejo Vidal-Quadras Roca Vice-President of the European Parliament Member of the Industry, Energy.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
ENERGY POLICY DEVELOPMENTS EE & RE OPPORTUNITIES U.S. Business Mission 2010 June 15 – 17, 2010 Chisinau, Republic of Moldova.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Latest on Bioenergy in the EU Emissions Trading System and in the CDM Latest on Bioenergy in the EU Emissions Trading System and in the CDM B. Schlamadinger.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Paul Scherrer Institut 5232 Villigen PSI WEC Oct. 01 / EM01/JA01 18 th World Energy Congress Round Table 6: Sustainability (Living in One World) Wednesday,
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Energy Efficiency in District Heating and Joint Implementation Mark van Wees CAP SD Energy and Climate Consultants Moscow, August 2006.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
E7 Private CDM Investor CDM Program + Experience presented by Klaus Baumann e7 Senior Program Manager/Project Director RWE Environmental Affairs UNEP RISOE.
Joint Implementation in the Czech Republic - building on our own experience Climate Change Department Tomas Chmelik Pavel Zamyslicky Climate Change Department.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Joint Implementation by the Netherlands Maurits Henkemans Ministry of Economic Affairs Netherlands Moscow.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
1 Cogeneration in the Forest Products Industry January 2008 by Phil Zirngibl.
A Presentation by Mattie Kennedy.  Japan is only 16% energy self-sufficient  Japan has the 3 rd largest nuclear production  Japan is the largest.
Sustainable Energy Plan June 22, 2002 Sustainable Development Council John Auguste (Ministry of Works, Communications, and Public Utilities)
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
El Gallo Hydroelectricity Project PDD Analysis
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
WHY TO PROMOTE LOCAL ENERGY RESOURCES? 1 LAEF Latvia Renewable Energy Federation Riga, June 18, 2015.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Morten Pedersen Deputy Programme Director Danish Environmental Protection Agency Climate Change Division.
The Prototype Carbon Fund: Project Portfolio Development Issues.
“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
What JCF observed in its
German Emissions Trading Authority (DEHSt)
UNFCCC JI Workshop, Bonn
Baseline setting and monitoring under Joint Implementation
Presentation transcript:

Энергетический Углеродный Фонд JI Projects in the Russian Power Industry Mikhail Rogankov Chief Executive Officer acting Energy Carbon Fund Tel.: +7 (095) Fax: +7 (095) Web-site: сarbonfund.ru

Энергетический Углеродный Фонд ECF organisational structure Management Board Inventory and Monitoring Founder - RAO UES Council Chairman: Mr. A.Chubais Projects, R&D International Co-op & Market Development Established in: 2001 Status: Non-commercial investment environmental organisation Mission: support environmentally sustainable development of the energy sector by using market based mechanisms to reduce GHG and other pollutants emissions Founder: RAO UESR

Энергетический Углеродный Фонд RAO UESR on a Country’s Energy Sector Scale Share of power production in RF = 69.4% Share of heat production in RF = 32.4% Installed capacities = GW Electricity generation = TWh Heat generation = mln. Gcal Number of Employees = 577,600

Энергетический Углеродный Фонд Structure of GHG emissions in Russia (according to the Third National Communication)

Энергетический Углеродный Фонд PRIMARY ENERGY RESOURCES DEMAND (according to the Ministry of Energy in 2003) Mln. tce

Энергетический Углеродный Фонд Potential of organizational/technological measures of energy resources saving by sectors for the period till 2020

Энергетический Углеродный Фонд UESR IS “CONDEMNED” TO JI 50% of equipment has reached the end of its lifetime (needs replacement/refurbishment) 67% of gas in the fuel mix – a nice opportunity for combined cycle technology and gas turbines Non-conventional renewables are less than 1% in the power mix while a lot of regional power utilities wants to develop them (a number of projects are well developed) 5,000 small hydro - in oblivion and needs rehabilitation Typical situation: CHP plants can replace old and low efficient boiler-houses’ and provide district heating improvement In some cases switch from coal/heavy oil to gas can be provided A great number of project proposals are facing the investment barrier

Энергетический Углеродный Фонд Diversity of projects Geographical: From Kaliningrad to Vladivostok Technological: Combined cycle Switch to gas Renewables CHP Local improvements (program projects) Scale of projects: from 1 MW to 450 MW From 1 mln. Euro to …. Short-term (from 1.5 years) Mid-term Long-term

Энергетический Углеродный Фонд –Combined Cycle instead of Steam turbines –Upgrading TPPs with gas turbines –Switch from coal/heavy oil to gas –Improvements in CHP and district heating systems (including decommissioning of old low efficient boiler houses) –Renewables: rehabilitation of mini hydro (5,000 stations from 1 to 5 MW) wind stations (on-shore and off-shore): geothermal plants at Kamchatka peninsular (big program): medium-scale hydro –Program projects (a number of small-scale measures of the same type united in one program): small steam turbines instead of steam pressure reduction and cooling devices; small hydro plants; variable speed motor drives, etc., etc. THERE IS ROOM FOR JI AT MOST OF UESR’s POWER PLANTS Project Technology Diversity in RAO “UESR”

Энергетический Углеродный Фонд RAO “UESR’s” Carbon Potential ResourceEmission reductions, M ton for the period Carbon incomes, M Euro 1.ERUs from JI in (70 small- and medium scale projects) Emission reductions from JI in early stage Plus: Emission Trading at international markets (if UESR is authorized to do that with the gained emission reductions versus quota). Emission Trading through National ETS and Intercorporate ETS (Both compatible with EU ETS. Both are under development)

Энергетический Углеродный Фонд 9 PDDs have been developed by Energy Carbon Fund Ufa CHP plant No. 4 - gas turbine 2x3.15 MW Pravdinsk Hydro No. 3 – small Hydro 50 MW off-shore wind park in Kaliningrad region 450 MW unit at Shekinsky TPP - combined cycle technology 450 MW unit at Tomsk CHP No. 3 – combined cycle + flare gas 6.5 MW unit at Mutnovckaya Geo Power Plant – Geothermal Plant ___________________________________________________ Mednogorsk CHP - 2x10 MW combined cycle + district heating Kirishi TPP – switch from heavy oil to gas (2 boilers) Amursk CHP No. 1 – switch from coal to gas (2 boilers) + optimization of the plant performance RED – are the projects participating in ERUPT-4, they have been validated by TUV Sueddeutschland in 2004

Энергетический Углеродный Фонд You are welcome to UESR and Energy Carbon Fund both for JI development and R&D You will deal with the company which: By 52% is owned by the Russian Government; Has the full GHG inventory for 365 power plants from 1990 approved by independent entity (Environmental Defense – USA) and by Russian independent experts; Has a functioning GHG monitoring system throughout the Company and regional utilities; Has an experience in participating in 4 foreign tenders; Has 9 PDDs already developed, 3 validated; Has its own methodologies, standardized baselines, etc.; Has a project database (320 project proposals and 27 of priority) and criteria to select carbon projects HAS A WILL TO ACHIEVE REASULTS !!!

Энергетический Углеродный Фонд PROBLEMS OF JI PROJECTS Additionality – projects have a double origin: efficiency and GHG reduction. There is no means to separate them from each other. Host company will not deal with economically non-efficient project JI procedures were not discussed at COP 9 (CDM methodologies are used) No difference between large scale projects and small-scale Some technologies go without saying for JI (renewables, switch for gas and biomass, use of flare gas, methane from coal mines, etc.) There is double validation: national and international (some outcomes could be recognized by another validator) JI requirements are becoming more and more complicated There is little time left to prepare and start JI projects before 2008 ECF database on JI projects: overview

Энергетический Углеродный Фонд GHG Emissions in the Power Sector according to the Inventory 708,5 470,2487,8 475,7