The EGO R&D Program Filippo Menzinger EGO Date: 22 September 2005.

Slides:



Advertisements
Similar presentations
24. June 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory SPIE Glasgow 2004.
Advertisements

Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Task M2 – Advanced Materials and Techniques for Resonant Detectors Motivation : Reduce thermal noise contribution to the acoustic detector noise budget.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
G v1Squeezed Light Interferometry1 Squeezed Light Techniques for Gravitational Wave Detection July 6, 2012 Daniel Sigg LIGO Hanford Observatory.
Work Package 4: Development of low loss dielectric coatings for advanced detectors Scientific motivation: Mechanical dissipation from dielectric mirror.
CNMFrascati 12/01/061 High Power Laser System for Advanced Virgo C.N.Man Design goals Present technology Other activities in the world Virgo+ and Laser.
1 Science Opportunities for Australia Advanced LIGO Barry Barish Director, LIGO Canberra, Australia 16-Sept-03 LIGO-G M.
LIGO-G W Is there a future for LIGO underground? Fred Raab, LIGO Hanford Observatory.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Observing the Most Violent Events in the Universe Virgo Barry Barish Director, LIGO Virgo Inauguration 23-July-03 Cascina 2003.
TeV Particle Astrophysics August 2006 Caltech Australian National University Universitat Hannover/AEI LIGO Scientific Collaboration MIT Corbitt, Goda,
Generation of squeezed states using radiation pressure effects David Ottaway – for Nergis Mavalvala Australia-Italy Workshop October 2005.
Towards a Design Study Proposal for a 3rd Generation Interferometric Gravitational- wave Detector Harald Lück London, October 26th 2006.
Test Configuration for Control For the test configuration we used a VME based control system, constituted by a VME crate with a VMPC4a from Cetia (CPU.
Burst noise investigation for cryogenic GW detector TITECH NAOJ Daisuke TATSUMI 2nd Symposium ‐ New Development in Astrophysics through Multi-messenger.
Recent Developments toward Sub-Quantum-Noise-Limited Gravitational-wave Interferometers Nergis Mavalvala Aspen January 2005 LIGO-G R.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
1/25 Current results and future scenarios for gravitational wave’s stochastic background G. Cella – INFN sez. Pisa.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Summary and Plans for the WG3 activity H.Lück, M.Punturo.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
A new facility for thermal conductivity measurements Filippo Martelli Univ. of Urbino and INFN Florence GWADW 2006 – 27/5-02/ – La Biodola.
JRA3 STREGA - Introduction Geppo Cagnoli IGR – University of Glasgow ILIAS-GW Meeting, Orsay, 5 th -6 th Nov 2004.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
R&D on thermal noise in Europe: the STREGA Project Geppo Cagnoli University of Glasgow AMALDI 6 – Okinawa - Japan June
Francesco Cottone INFN & Physics Departments of Perugia, Pisa, Florence (Collaboration Work under VIRGO Project) Thermomechanical properties of silicon.
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
ILIAS - GWA N5 - Strega JRA3 General Meeting Orsay - November 5th-6th, 2004 M1 Activities.
Virgo-Material “macro” group M.Punturo. VIRGO-MAT2 VIRGO-MAT components Virgo-MAT is composed by three INFN groups –Firenze/Urbino M.Lorenzini, G.Losurdo,
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
LISA News from ESA O. Jennrich LISA Project Scientist.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
STREGA & ET - 4th ILIAS-GW general meeting 1 STREGA legacy for ET Michele Punturo INFN Perugia.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
Stochastic Background Data Analysis Giancarlo Cella I.N.F.N. Pisa first ENTApP - GWA joint meeting Paris, January 23rd and 24th, 2006 Institute d'Astrophysique.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO G M Intro to LIGO Seismic Isolation Pre-bid meeting Gary Sanders LIGO/Caltech Stanford, April 29, 2003.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
ELiTES 1 st General Meeting Tokyo, October 2012 Federico Ferrini – EGO Director Thanks to the European Union Delegation.
1 Cascina – October 19, 2011 ASPERA Forum Laurent Pinard Substrates, Polishing, Coatings and Metrology for the 2 nd generation of GW detector Laurent PINARD.
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
Material Downselect Rationale and Directions Gregory Harry LIGO/MIT Kavli Institute for Astrophysics and Space Technology On behalf of downselect working.
The Quest for Gravitational Waves: a global strategy
R&D VIRGO-EGO N5-W3 R&D EGO-VIRGO-July 8th, 2004.
The Search for Gravitational Waves with Advanced LIGO
Wide Bandwidth Dual Acoustic GW Detectors
Nergis Mavalvala Aspen January 2005
Is there a future for LIGO underground?
Evolution of the Virgo detector: The Virgo+ plans
Advanced VIRGO Experiment
GW150914: The first direct detection of gravitational waves
Main Efforts of the Core Optics WG
Flat-Top Beam Profile Cavity Prototype: design and preliminary tests
Renzo F. Parodi INFN-Genova
T3 DEVELOPMENT OF SELECTIVE READOUT SCHEMES
The views of Virgo collaboration groups on upgraded/advanced Virgo
Presentation transcript:

The EGO R&D Program Filippo Menzinger EGO Date: 22 September 2005

2 EGO R&D program EGO – The European Gravitational Observatory - in order to fulfill one of his statutory missions, i.e, to promote an open co-operation in R&D, has a specific R&D budget for major Virgo upgrades, for new detectors and, in general, for gravitational physics. R&D contracts are open to all GW European laboratories.

3 Scope of the EGO R&D program EGO launched in Autumn 2002 the first call for R&D proposals open to European groups regarding advanced GW detectors. To this call responded groups pertaining to the Virgo collaboration, resonant detector groups, and groups in Germany and UK. The proposals were examined by the EGO Scientific and Technical Advisory Committee, the “STAC”. On STAC recommendation several R&D were financed by EGO

4 The R&D program Funds allocated or committed in years : 2,183 k€ 25 Signed conventions/contracts with proponent laboratories 12 Fellowships contained in those conventions. Of these R&D programs the repartition may be broadly shown as in this graph

5 Adaptive optics for GW ITFsNaples University CNRS OCA- ILGA Virgo Control System upgrade IN2P3 LAPP INFN-Pisa-EGO Surface corrective coatings for GW ITFsIN2P3 LMA Full scale prototype of fused Silica SuspensionsUniversity Perugia Improvement of Q measuring facility for mirrorsUniversity Perugia Improvement of coatings QUniversity Perugia IN2P3 LMA Optimisation of interferometer optical parametersCNRS OCA-ILGA ESPCI Modelling of Thermal NoiseUniversity Perugia University Firenze-Urbino Study of signal re-cyclingIN2P3 LAL Laser cooling of fibresPisa University CO 2 laser for monolithic suspensionsGlasgow University Wide band transducer for Dual Torus detectorUniversity Padova Spherical detector for high frequency gwU.Roma-2 Tor Vergata Study of quantum noiseCNRS LKB CNRS ILGA Thermal Noise at Cryogenic TemperaturesINFN Pisa and al Data analysis of gw from coalescing BHCardiff University CNRS-ILGA Study hollow fibre opticsCNRS OCA - ILGA Si absorption characterization a 1.5  m ESPCI R&D themes

6 Last April the STAC examined the intermediate reports submitted by most of the current contractors for the EGO R&D program Hereafter, some elements of those reports and of comments by STAC are reported. the R&D program status

7 The research group reported successful demonstration of anti-Stokes cooling of a small sample of BaY 2 F 8 (BaYF) single crystals doped with Yb (2.5%) grown in the University of Pisa laboratory. The experiment consisted of measuring the cool down of the crystal over time (~50 minutes) while it was being pumped by 3W of 1025 nm CW light from laser diodes. The steady-state cooling achieved was 4K at room temperature. Observations: The experiment has been successful. The next key issue is to develop a detailed plan of how this idea can be actually implemented in a suspended interferometer in order to reduce thermal noise of fibres. Silicon Suspensions laser coolingUniversity-Pisa

8 Improvement Q measuring facilityPerugia A close collaboration, as STAC previously suggested, was set up between Perugia and LMA-Lyon on the measurement apparatus delivered to Lyon. The positive results are clear from both the Perugia and Lyon reports of progress. Progress has been made in improving the sensitivity of the instrument at Perugia which has as its goal the direct measurement of the thermal noise. The sensitivity of the instrument is now sufficient to measure the peaks of the thermally-excited resonances in the test piece, and the use of the instrument to characterize a series of coatings can now start.

9 Thermal Noise at Cryogenic Temperatures INFN-Pisa et al.,EGO The cryogenic facility is growing properly. The laboratory space at EGO is completed and the large cryostat is expected to be delivered at EGO in a few weeks time. It is designed to house a full last stage of Virgo-kind suspension with a full Virgo-size mirror. Everything seems in schedule and no major problems are foreseen, apart from the fact that no Company with the necessary experience to produce monolithic Si strips at reasonable price has been found so far. This could become a problem along the research line on the use of pure Si as mirror material.

10 Fused Silica SuspensionsPerugia The research group reports completion of a fused silica wire production facility in Perugia. They validated the wire production procedure. The facility is now in production mode that is fully automated and stable. It is possible to set a fibre diameter and the computer selects the pulling speed to drive the machine. They are able to produce custom designed fibres with variable diameters from microns. The group successfully developed and delivered an OH flame based fibre pulling system. The machine is currently under installation at EGO in the new laboratory there created to house both the fibre pulling techniques and the Cryogenic facility. They also validated the silicate bonding procedure and have transferred knowledge about the technique to the EGO staff at Cascina.

11 CO 2 laser for monolithic suspensionsGlasgow Good progress was made on the development of the CO 2 laser fibre pulling and welding machine. A simple machine with a fixed feed-pull speed ratio was tested and used to produce ribbons (5-9mm wide and 100  m-300  m thick) and fibres (15  m-18  m diameter). The power stability of the CO 2 laser was improved to get better control on the width and thickness of the ribbons. Components for the first version of the more complicated pulling machine are on order and the test of the first prototype is expected to start soon. The performance of that prototype will give a good indication on the overall progress made in this project. Its deliver at EGO is expected in early spring 2006

12 Signal re-cyclingLAL The Orsay LAL group works together with groups in LIGO on the development of simulation tools for a dual recycled interferometer and on the commissioning of the 40m Caltech prototype in its dual recycled configuration. The proposed work for the next period is side-band phase noise propagation, radiation pressure effects, higher order modes, implementation into SIESTA. STAC suggested to put high priority on the validation of the simulation with experimental results wherever possible.

13 Data analysis ILGA-Cardiff Spinning binary black holes A new postdoc was engaged (Nov 2004) at Cardiff for this effort. Her first efforts (April 2005) have been to ‘get up to speed’ in the field; new work has led to developing a code to compute the waveform from a pair of spinning binary black holes. This is still in development and testing. The objective remains to develop templates which cover the additional variable of the black hole spins, a quite necessary undertaking.

14 Control System upgradeAnnecy-LAPP, Pisa, EGO -Task 1 - DSP (Pisa, EGO). 6U VME Carrier board hosting a PC/104Plus CPU module with Fast Ethernet and Linux OS, a mezzanine board with up to 6 DSPs and a mezzanine board for timing and optical link interface. Prototypes are in construction; tests in course. -Task 2 and 3 – (LAPP) TOLM (Timing and Optical Link mezzanine) - Good progress with extensive test of the digital optical link and start of development of interface programs have been reported. -Task 4 - ADC (LAPP). Improved differential interface modules with programmable filter for the existing ADC boards: 30 boards (60 channels) ready for tests by May. The new ADC board will integrate such new features after tests. -Task 5 - New DAC/Coil driver (Pisa, EGO) Conceptual design ready. A prototype has been tested smoothly. -Task 6 - New demodulation board (LAPP). No progress reported as yet. -Task 7 - New detection electronics at higher modulation frequency (LAPP). No progress reported as yet. Observations: -Overall, the activities are progressing quite well. -Most activities at Pisa are reportedly focused on the DSP board. However, progress has been made also on the development of the new DAC (Task 5). -It is advisable that a detailed prioritized plan for the swap of the new electronic boards and modules is agreed with Virgo and prepared.

15 Modeling Thermal NoisePerugia and Florence-Urbino The collaboration set up, tested and shared a simulation environment, with ANSYS, to model thermal noise in mirrors and mirror suspensions. Perugia Then Perugia dedicated to model the VIRGO mirrors, to a simulation of substrate+suspension wires+multilayer coating (taken from F/U results)+silicate bond, and made comparisons between the outcome of the model and relevant quantities, as mirror modes frequencies and quality factors, measured during the Virgo Commissioning runs. Results are satisfactory for frequencies, while for quality factors indicate that thermo-elastic losses should be taken in account. Florence/Urbino Then Florence/Urbino dedicated to silicon fibres, to include soon thermoelastic effects, and to methods for a fruitful modelisation of coatings, with aim to extract relevant parameters as the loss angle.

16 Spherical ResonatorRoma Tor Vergata The objective of the research is to demonstrate the feasibility of ultra-cryogenic spherical detectors. The scheduled milestone is to start data taking of MiniGrail, a solid sphere copper- aluminium detector with a mass of about 1 ton at the end of the second year. At the first run, the noise spectrum was taken and compared with the full electro- mechanical numerical model. The noise temperature was 70 mK and eight thermal peaks were identified without any unexpected resonances and spurious noise. The observation by resonant antennae makes up for less sensitive frequency band by laser interferometers. The R&D of resonant antennae is of benefit also to cryogenic interferometers. Therefore, the importance of the R&D of resonant antennae does not reduce even though interferometric detectors attain better sensitivity at around 100 Hz. Also good point of the R&D of the resonant antennae is the cost effectiveness of the experiments, which makes small experimental groups enter this field. They may supply future good scientists working on gravitational wave research.

17 Wide band transducer (Dual Torus)Padova The objective of the research is to investigate the noise characteristic of the proposed wideband mechanical amplifier for the dual cylindrical detector. The mechanical amplifier realizes noise matching between a massive resonant antenna and a sensitive displacement sensor to produce optimised signal. The target is in three years to measure thermal noise of the mechanical amplifier at room temperature and to investigate contributed noises at a level of thermal noise. For this target, a mechanical amplifier prototype was designed and successfully analysed by ANSYS in the first year. And in the second year, its transfer function has been measured with a test oscillator. The research is only a part of the development of the dual cylindrical detector and the final result of this research will be tested in the future. However, STAC supports the activity of this group by the same reason as for 'Spherical detectors'.

18 Quantum noiseLKB/ARTEMIS This experiment, with the objective to study both theoretically and experimentally the quantum noise in gravitational wave interferometers, continues to progress well. It is a collaboration of the Paris-LKB and Nice- ARTEMIS laboratories, and both sides are contributing to the effort. Recent progress involves the fabrication of a higher-finesse cavity, using mirrors coated by LMA; a finesse of has been realized. An improvement in the frequency stabilization has been made.

19 Improvement of coatings Q and Corrective coatings LMA 1.Improvement of coatings QLMA-Lyon The report gives a clear and helpful description of the ringdown apparatus built by Perugia and with modifications by Lyon. Following the STAC recommendations of Fall 2004, a much stronger collaborative effort has been pursued, and the result is that the apparatus is now fully functional and capable of making measurements which can discriminate at the required level. The objective of the research has been met: Now it is possible to make a coating run and then, without removing the sample from the clean room where the coating was made, a definitive characterization of the mechanical loss of the coating undertaken. 2.Corrective coatingsLMA-Lyon The first three mirrors with Mexican Hat produced so far have been sent to Caltech for testing, to better learn about their appropriate construction procedure. A first simulation of the mirrors has been done and it looks rather promising. The project, globally, sounds good.

20 Hollow FibersILGA Nice concentrated their R&D activities on studying the use of fibres as mode cleaners, activity encouraged by the STAC. They first positively checked the possibility of efficient laser-fibre coupling. Other tests showed that fibres do not add significant to frequency noise and at high frequency to amplitude noise. Problems with low frequency noise do not seem to be serious. Polarization noise is under study but in any case existing fibres do not preserve polarization. Collaboration with Limoges began on improving fibre quality (existing fibres are not single-mode). Also fibre end are very sensitive to dust. Various solutions of this problem are under study.

21 Interferometer OptimizationNice and ESPCI The R&D program consists in upgrading the two simulation codes and software systems developed in Nice and at ESPCI and in comparing the results of the codes. The Nice code has been upgraded and made more user friendly. First comparison between the Nice (DARKF) and ESPCI (NV) codes have been performed pointing towards bugs that have been corrected. Preliminary studies of a flat mode interferometer are also on their way and turn out to be promising.

22 Absorption at 1.5 micron of Si ESPCI With their own CW laser, they have found a minimum absorption of 40 ppm/cm for slightly doped silicon crystals (P and N, with resistivity of the order of 1000 Ohm.cm). For VIRGO at low temperature (77 K and below) this is already better than silica for the thermal point of view (thermal lens effect), With the new laser provided byEGO the density of power in their experiment is about 40 GW/m 2 (30 W peak power focused on a 30 micron spot) and, even with a new generation of antenna with a 1 kW source and an order of 1 MW in the arm, the density of power in VIRGO will be around 0.1 GW/m 2. This will induce an extra absorption of a few hundredth ppm which is negligible.

23 The VESF fellowship program In Autumn 2004, in the framework of its R&D program, and in support of the Virgo- EGO Scientific Forum, VESF, EGO launched a program of fellowships open to European groups working on theory of gravitation interested in dedicating work to the sources of gravitational waves that may fall within the observational reach of Virgo and its possible upgrading. These fellowships were for up to 10 man-years for 2005 and for 2006 (and similar amounts for the following years, subject to the availability of funds). The durations of the fellowships was intended to be from a month to two years. The great majority are two-years. It was expected that fellowship holders would come periodically to EGO to illustrate the advancements of their work. 9 Conventions were drawn with groups of 4 European Countries: France, Greece, Italy, Spain

24 The approved VESF fellowship bi-annual program University of Alicante, Dpto. Fisica Aplicada, Spain Probing general relativity and nuclear physics with gravitational waves from newly born neutron stars Aristotle University of Thessaloniki, Department of Physics, Greece Non-linear oscillations of compact stars and gravitational waves, synergy between the non-linear perturbation methods and numerical relativity. Institut Henri Poincare, Paris 3-month program on General Relativity, Gravitational Waves, Relativistic Astrophysics and Cosmology LAL (Orsay)+IAP (Paris)+Cardiff Post-newtonian theoretical study of compact binary sources templates Istituto Astrofisica Spaziale e fisica Cosmica of CNR, Rome Gravitational Waves by Gamma-Ray bursts Physics Dept., University of Rome La Sapienza Study of the r-modes instabilities in rotating neutron stars SISSA/ISAS, International School for Advanced Studies, Trieste, and Oxford Gravitational-waves Emission from Mixed Binary Systems Universita' degli Studi di Trento - Dipartimento di Fisica Gravitational wave search with the operating network of interferometers and resonant detectors Physics Dept., Pisa University Stellar evolution of progenitor systems and Analysis of local Galactic sources for stochastic background Universitat de Valencia, Spain Numerical General Relativistic magneto-hydrodynamics simulation of accretion discs as GW sources

25 Future call for R&D proposals The STAC – the EGO Scientific and Technical Advisory Committee - recommended that a White paper on R&D be completed by the Virgo collaboration in a timely way to be made available as part of the next call for proposals for research. The next STAC meeting, in the middle of October, is expected to give suggestions on the general targets for a new call for proposals in R&D. The STAC recommended already that the Fellowships be used creatively to draw groups to the Observatory, and engage them in a mix of commissioning, data analysis, and research targeting future developments. At the VESF executive board of last 2 September it was considered important to open a new a new call for proposals for a few fellowships in theoretical and DA studies. The EGO Council next November will decide on the when, how and how much for the development of EGO R&D program.

26