St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.

Slides:



Advertisements
Similar presentations
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Advertisements

St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
ODOT Structure Project Manager Training
HELP !!!!!! International border bridge located over the Rainy River on the Minnesota Trunk Highway 72 and Ontario Provincial Highway 11 This route provides.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
By : Prof.Dr.\Nabil Mahmoud
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Hawk Measurement Systems Smart Sensor Technology for Bridge Health.
Let’s Learn About Bridges
Santa Maria River Bridges Widening. Project Location.
Chapter 34 Bridge Construction.
Hull History Center INFORMATION PACK
Totally Precast Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
Types of Bridges. Stone Arch Bridges Concrete Arch Bridges.
CONSTRUCTION.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
Oakland Jr. High – STEM Classes – Project Update and 3D Printing March 26, 2015.
Lesson 1 Scientific Inquiry Lesson 2 Measurement and Scientific Tools
Bridges from all over the World! By: Maria Peloro & Christine Sniffen Bridges powerpoint project 2 nd period science.
There are many types of bridges including:
Successful Bridge Design Cameron Stacy. Introduction A bridge is a structure used to compensate for an obstacle such as a valley, river, or to assist.
THE BROOKLYN BRIDGE Ana Cristina Ayala Anette Rossi.
Highways/BridgesHighways/Bridges American Bar Association Forum on the Construction Industry American Bar Association Forum on the Construction Industry.
BRIDGE BUILDING.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Office of Highway Safety Gusset Plate Inspection Issues Mark Bagnard.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Bridge Photos MINNEAPOLIS (March 23) - Old photos of the Interstate 35W bridge show two steel connecting plates were visibly bent as early as four.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
I-35W Mississippi River Bridge An Engineering Failure
I35W St Anthony Falls Old Bridge. 10th Avenue Bridge Minneapolis, MN.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Gerord Neil Jr Joel Villalobos Period 4 Arch. Design.
BANDRA-WORLI SEA LINK BY : PRAJAPATI NIHAR V..
Daire McCormack Natasha Brady Peadar Barrett.  Constructed in 1928 and spanned the Ohio River between Point Pleasant, West Virginia and Kanauga, Ohio.
The Point Pleasant Bridge Disaster The Collapse of “Silver Bridge”
Transportation infrastructure: Are bridges an area of concern? Ryan Church and Jason Mumbach September 17, 2008.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
THE HISTORY OF BRIDGES TRANSPORTATION IN AMERICA.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
4A6-1 Disaster Case Study Group 9 Milford Haven: Steel Box Girder Collapse Alan Hunt Danielle Pickett Ed Lawlor Michael Cirillo.
THE WONDERFUL WORLD OF BRIDGES
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
By Kelly Warden December  Opened in 1967 along I-35 W  Bridge goes over the Mississippi River in Minneapolis, Minnesota  Minnesota’s 5 th busiest.
Bridges and Loads Modified by Matthew Silbernagel.
Point Pleasant Bridge Disaster Group 19. Events and consequences 5PM December people killed, 9 injured Only major connection between West Virginia.
Totally Precast Concrete Bridges
Presented by Md. Imran Kabir Student No: November 26 , 2014
Engineering Terms Bridge Unit.
Understanding Structural Engineering
Danube Bridge Vidin – Calafat
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Blatnik Bridge Management Study
Beam bridge Truss bridge Arch bridge Suspension bridge
Types of Bridges.
Totally Precast Concrete Bridges
Successful Bridge Design
Let’s Learn About Bridges
Presentation transcript:

St. Anthony Falls Bridge By: Timothy Brewer

St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35 W, 8 Lanes of Traffic Total Length: 1,907 feet/ Width/Height: 113.3/115 ft Beginning Date Of Construction: 1964 Completed: November 1967

Construction Designated Bridge 9340 Sverdrup & Parcel designed the bridge in 1961 Hurcon Inc. and Industrial Construction Company were given the building contracts Contracts were worth more than 5.2 million dollars at the time Construction began in 1964

Opened in 1967

The Collapse

August 1, 2007 At 6:05 p.m. CDT, the central span of the bridge suddenly gave way, thus followed by its adjoining spans. The south part of the bridge went 81 ft eastward when it collapsed, while the northern parts landed on 3 freight cars in a ship yard. A state of emergency for the city of Minneapolis was declared the next day, August 2 nd. Navy divers began arriving on August 5 th to survey the wreckage from underneath.

Victims and Survivors 13 people were killed (8 males, 5 females) A school bus carrying 60 children rested against a guardrail of the collapsed structure. 1 youth worker was severely injured and 10 Children had minor injuries. During the first 40 hours, 11 area hospitals treated 98 victims

Causes of the Collapse html?elr=KArksi8D3PE7_8yc+D3aiUo8D3PE7_ eyc+D3aiUeyc+D3aUU Thin or undersized gusset plates Added weight over the years Equipment on the bridge

Fractured Gusset Plate

Reconstruction

Reconstruction Information Figg Bridge Engineers & Flatiron Constructors Inc. were given the new building contract Cost for the new bridge was around 9 million dollars 339 days to complete By completing the bridge, it helped the overall traffic problem seeing as 140,000 cars on average traveled across it on any given day.

New Design, Techniques, and Materials Foundation Consists of drilled shafts Four for each of the eight central span piers Each has a steel casting over concrete Pier Construction Each pier will be cast on-site atop the footings on each bank. Superstructure Construction Temporary scaffolding and forms will be built to provide a mold for the parts of the bridge over land.

Design, Techniques, and Materials Cont. Segment Placement The center spans box girder segments are precast and will be fitted by lowering them from a crane. Assembly Segments are linked together by steel cables threaded through them, with each segment linked to the adjacent ones and full-length cables linking the entire array. Final Segment After all the segments are in place, the final gap between the assembled sides is cast in concrete, completing the central span.

New I-35W Bridge 100-year life span 10 lanes of traffic, five in each direction—two lanes wider than the former bridge 1,223 feet long, 684 feet less than the previous. 189 feet wide—the previous bridge was 113 feet wide 13 foot wide right shoulders and 14 foot wide left shoulders, the previous bridge had no shoulders Light Rail Transport-ready which may help accommodate future transportation needs

Additional Information The completed bridge incorporates "Smart Bridge" technology to enhance bridge inspections and assist in the advancement of bridge design. In a partnership between Mn/DOT, the Federal Highway Administration, and the University of Minnesota, over 320 sensors throughout the structure monitor the bridge behavior. These include vibrating wire strain gages embedded in the concrete of the foundations, piers and superstructure, long gauge fiber optic strain gauges, accelerometers, linear potentiometers, and corrosion potential sensors embedded in the wearing surface.