Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.

Slides:



Advertisements
Similar presentations
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Advertisements

Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Magnets for the ESRF upgrade phase II
Jim Stewart (JLAB) Internal Magnet Review May 2009.
Slide HALLD TAGGER MAGNET STRUCTURAL ANALYSIS Presented by William Crahen 6/10/09 Pole Plate analysis Vacuum chamber analysis Vacuum chamber tie rods and.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Jim Stewart Tagger Magnet Design Review July 2009.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Tagging Near the End-Point Richard Jones, University of Connecticut GlueX Collaboration Meeting, Newport News, May 8-10, Current design capabilities.
AWAKE Electron Spectrometer Design Simon Jolly 4 th September 2012.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
23 July 2012D. Sober1 Some thoughts on Hall D tagger magnet field mapping D. Sober Catholic University of America GlueX Beam/Tagger biweekly meeting 23.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
Overview of the GlueX Tagger and Photon Beamline..
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
SBS Magnet John J. LeRose. Magnet: 48D cm gap, 2-3 Tesla*m Solid angle is 70 msr at 15 ° GEM chambers with 70 μm resolution Momentum resolution.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Some Design Considerations and R &D of CEPCB Dipole Magnet
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
Solenoid Yoke Door-Barrel Connection
The design schemes of the low field dipole magnets
The Budker Institute of Nuclear Physics
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
FRESCA2 Update on the dipole design and new calculations
Large Booster and Collider Ring
Update on GEp GEM Background Rates
Compact and Low Consumption Magnet Design The DESY Experience
CEPC Booster Ring Magnets
IR Beam Transport Status
Presentation transcript:

Tagger and Vacuum Chamber Design

Outline. Design considerations. Stresses and deformations. Mechanical assembly.

Design Considerations. The basic tagger parameters are: Main beam energy = 12 GeV. Magnetic field = 1.5 T – 12 GeV radius of curvature = 26.7 m. Momentum range of analysed electrons = 0.6 to 9.0 GeV/c. Intrinsic average focal plane momentum resolution = 0.05%. Total weight of the tagging spectrometer less than 100 tonnes, which means the main beam bend angle is less than 15 degrees.

Adopted design. Total main beam bend angle = 13.4 degrees. Total length of focal plane (25% to 90% of ) ~ 9 m. The focal plane detector package is divided into two parts. Set of 141 fixed scintillators spanning the full energy range with 0.5 % resolution. Movable microscope of finely segmented counters with 0.1% resolution spanning the coherent peak – tagged photon energies between 8.5 and 9 GeV for GlueX. Magnet configuration of two identical rectangular dipoles in series, in front of which there is a quadrupole to optimise the focal plane vertical focussing – the photon energies of interest to GlueX are analysed in the first magnet. For each: Gap width = 3.0 cm. Pole length = 3.1 m. Weight = 36 tonnes – heaviest single yoke piece ~13 tonnes. Coil power = 30 kW. A straight focal plane with optics which are not inferior to those for a single dipole tagger.

Reasons for adopting a two rather than a single dipole design. Single dipole is ~ twice the length ( 6.2 m) and twice the weight (~75 tonnes) of the individual magnets in the two magnet configuration. Difficult to find suppliers of ~ 6.5 m lengths of high quality iron at a reasonable cost. Top and bottom yokes for the single magnet tagger each weigh ~26 tonnes which will require heavy duty lifting equipment to assemble the magnet or undertake future repairs or modifications. The long structure of a single dipole tagger will be awkward to manoeuvre during installation. The smaller magnets can be made by more manufacturers and will probably be cheaper. Building costs will be less for the two magnet option – cheaper crane or rigging costs, smaller access doors etc.

Vacuum chamber design. Since the tagger is broad-band it analyses electron energies from 25% to 90% of which are focussed along a focal plane ~ 9 m in length. The structure of the vacuum chamber should not intercept any of the analysed electrons, and the chamber should extend to within a few cm of the focal plane. The vacuum chamber should also allow the main electron beam to exit cleanly from the spectrometer. A long (~12.5 m) relatively narrow (~0.8 m) chamber with no internal supports is required. The design adopted uses the pole shoes of the dipole magnets as part of the vacuum system. The vacuum chamber fits around the pole shoes. Vacuum seals are made between a lip around each pole shoe and the top or bottom surfaces of the vacuum chamber. Compressed rubber O-rings form the vacuum seals.

The two identical magnets tagger Magnet 1 Magnet 2 Vacuum chamber The vacuum force is around 70 tonnes, so the vacuum chamber needs external support.

The electron entrance angle :5.9 degrees Main beam exit angle: degrees Main beam bending angle 13.4 degrees The angle between the photon exit beam and the focal plane: 9.94 degrees General view of the tagger showing the lay-out of the dipole magnets, focal plane and a selection of electron trajectories.

Length: 3.09 m. Width: 1.09 m. Height:1.41m. Weight: ~38 Tons for one magnet. Conductor area: 135 cm 2. Current: 144 A. Magnetic field: 1.5 T. Pole gap: 3 cm 1 Vertical section through one of the dipole magnets showing pole profile and coil geometry

Vacuum chamber 1 1 Top view Front view Right hand side view looking along output flange Pumping port

Vacuum chamber sections AA` and BB` O-ring Groove Weld Compression pad

Enlarged view of output flange (Electrons pass from back to front in the figure) For compression pad screws Vacuum window compression pad For compression fitting screws Main flange bolt hole Bevelled edge To manufacture the vacuum chamber: a. Weld together complete assembly. b. Skim those parts of the top and bottom surfaces used for the vacuum seals to make them flat and parallel.

Stresses and Deformations. For each magnet: magnetic force between the poles is ~ 150 tonnes, weight ~ 36 tonnes. Vacuum Forces. Total force on chamber~ 70 tonnes. This is supported by: Honeycomb strengthening of ~40 tonnes, 4 vertical struts from manet 2 of ~15 tonnes, 3 vertical struts from magnet 1 of ~ 10 tonnes. Magnet 2 Magnet 1

Magnet stress calculation with magnetic, vacuum and weight forces - (3 point support defines boundary condition). 3 point supports

Magnet deformation calculation with magnetic, vacuum and weight forces. (Maximum deformation in the pole gap is less than 0.21mm which is much smaller than the O-ring compression of ~6mm for the two O-rings) 3 point supports

Vacuum chamber stress analysis - (for complete chamber). 1. Stainless steel – walls 15mm, ribs 20mm*160mm.

Vacuum chamber stress analysis – (for complete chamber). 1.Stainless steel – walls 15mm, ribs 20mm*160mm. Boundary condition: gap between pole shoes and vacuum chamber side walls allowed to vary by 0.1 mm.

2. Aluminium – walls 15mm, ribs 20mm*160mm. Vacuum chamber stress analysis – (for complete chamber). Stresses on both the SS and Al chambers approximately the same.

Vacuum chamber stress analysis – (for complete chamber). 2. Aluminium. Deformation of Al chamber ~3 times that for SS chamber.

Mechanical Assembly. Vertical section showing the arrangement for compressing the vacuum O-rings. * Rods connected between yoke and vacuum chamber used to apply compression to the O-rings. Rubber O-ring.

Vertical sections showing how O-ring compression is defined. Back of vacuum chamberBottom pole shoe Spacer Compressed O-ring

Vertical section showing how coils are supported against magnetic forces.

. Vertical sections showing brackets which counteract the magnetic forces on lower coils. Pads

Vertical section showing how the weights of the lower coils are supported. (Upper coil weights supported by magnetic force brackets.)

Vertical sections showing lower coil weight support brackets.

Brackets O-ring compression along exit face. O-ring compression along the back and side walls of vacuum chamber. Magnetic force and weight of coils.

Sequence of brackets– outwith exit face. Top pole shoe Vacuum chamber Bottom pole shoe Bottom yoke

Sequence of brackets– along an exit face for a top yoke. Top yoke Pole shoe Top surface of vacuum chamber Vertical rods are equispaced.

Top yoke Top coil Bottom coil Top pole shoe Vacuum chamber Exit flange Support arms View with coils added.

The Tagger and vacuum chamber assembly procedure will be described in one of the following presentations.