Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.

Slides:



Advertisements
Similar presentations
0 - Electron Discrimination in Liquid Argon Time Projection Chamber.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
MODULAr: concept design of internal detector mechanics A. Menegolli, University and INFN Pavia.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
1 MicroBooNE: LarSoft Simulation & PMT Response Tests Jessica Esquivel August Nevis Labs, Columbia University.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Status of LBNE LAr and LAr1 at FNAL Bruce Baller - Fermilab.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Detector R & D in the 35 ton Membrane Cryostat 9/11/2015HV Feed for BNL Meeting1 Hans Jostlein This is a draft and a list of possible studies. The main.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Greetings to Veljko from Fermilab December 9, 2010.
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
TPC Design Concept: From MicroBooNE to LAr20
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.
Grounding Guidelines Developed for LBNE
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
CLAS12 Drift Chamber Prototyping
K.T. McDonald  BooNe Electronics Meeting Jan. 13,  BooNE Comments on  BooNE Readout Parameters Based on the Electronics Meeting of Jan. 7, 2009.
November 4, 2004Carl Bromberg, FNAL LAr Exp. Workshop Nov. 4-6, Liquid argon as an active medium Carl Bromberg Michigan State University & Fermilab.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
February 2010Hans Jostlein1 Cellular Design for a Large Liquid Argon TPC Detector - Design goal -Cellular Design -Additional Possibility: -Light Detection.
Accelerator-based Long-Baseline Neutrino Oscillation Experiments Kam-Biu Luk University of California, Berkeley and Lawrence Berkeley National Laboratory.
DARK MATTER SEARCH Carter Hall, University of Maryland.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
View of TPC Optimization from Reconstruction Working Group Xin Qian and Tingjun Yang 1.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
Thoughts on TPC Optimization Xin Qian BNL 1. Outline Detector Parameters – TPC angle – Wire pitch – Wire angle – Wire pattern – Wire plane gap Basic reconstruction.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Overview of 35ton Phase 2 Detector Bo Yu 35t Installation Readiness Review August 25, 2014.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Daniel H. Gutiérrez Velázquez Fermi National Accelerator Laboratory PPD – Neutrino MicroBooNE.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
First tests on the roll-formed field cage.
Cold CMOS Electronics for the readout of very large LAr TPCs
BESIII EMC electronics
Presentation transcript:

Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working Group TIPP 2011, 8-14 June 2011

Outline  LArTPC principle of operations  MicroBooNE TPC design  LBNE LAr40 TPC design  Summary Other presentations describing MicroBooNE and LBNE LAr40: Membrane cryostat technology and prototyping program towards kton scale Neutrino detectors, Rucinski Front End Readout Electronics of the MicroBooNE Experiment, Chen Cold electronics development for the LBNE LArTPC, Thorn 2

3 How Does a LArTPC Work dE/dx of 1 MIP: 2.1MeV/cm

Advantages of LAr TPCs Neutrino interactions recorded in the small LAr TPC at FNAL: ArgoNeut Full 3D event reconstruction sub-mm position resolution dE/dx for particle ID e/  separation >90% Low energy threshold particle energies →15 MeV Scalable to multi ‐ kiloton size Optimized TPC geometry Low noise electronics Multiplexed readout High LAr purity 4

Stacked detectors for large cryostats Key Technology in Building Large Scale LArTPC: Cold Electronics 5 Having front-end electronics in the cryostat, close to the wire electrodes yields the best SNR Highly multiplexed circuits with fewer digital output lines not only greatly reduce the number of cryostat penetrations, but also give the designers of both the TPC and the cryostat the freedom to choose the optimum configurations A typical readout configuration with warm electronics: long cables connect the sense wires to the FEE, resulting in large electronics noise. To reduce the cable length, one has to implement cold feedthroughs below the liquid level, which increases the cryostat complexity. 5 Noise (ENC) vs Sense Wire and Signal Cable Length - in relation to MIP Signal for 3x3 and 5x5 mm Wire Spacing

MicroBooNE Introduction  MicroBooNE is the first large LArTPC that will be exposed to a high intensity neutrino beam FNAL)  It has 3 goals: 1. Resolving the source of the MiniBooNE low energy excess by employing precision electron/photon differentiation offered by LArTPC’s; 2. Measuring exclusive cross sections on argon in the 1 GeV range by exploiting high resolution of event topology available from LArTPC’s; 3. Exploring technological innovations and methods to provide a basis for the design of the next generation of LArTPC detectors at larger scales. 6

MicroBooNE TPC Key Design Parameters ParameterValue TPC active volume2.33m (H) x 2.56m (W) x 10.37m (L), 86 ton Sense wire planes3 planes of wires (Y: vertical, U&V: ±60°from Y), 3mm between wires, 3mm between planes Wire properties150µm, SS304+2µmCu+Au flash, 9.8N tension Field cage 2.54cm tube at 4cm pitch, four 1G  resistors in parallel between tubes Cathode bias-128 kV, 500V/cm drift field In vessel electronicsCMOS ASIC, 16ch chips, 8256 ch. total ENC: pF, 1µs peaking time. Cryostat12.2m(L) x 3.9m(OD), holds 170 ton LAr. 7

A Partial Cross Section of the Cryostat 8

Major Differences from ICARUS, other than the shape and size  Cryostat uses foam insulation to reduce cost.  It will be purged with argon gas instead of vacuum evacuation to demonstrate the feasibility of very large non-evacuable cryostat for LBNE.  All front end analog electronics for the wire readout are submerged in the LAr, directly connected to the sensing wires to reduce electronic noise (~600e vs. 1500e).  2.5 m maximum drift length (vs. 1.5m)  It has a $20M cost cap 9

A Wire Carrier Design Enables Direct Connection to the Front-End Electronics Shown here is a stack of MicroBooNE wire carrier boards on the readout side of the frame. Copper posts on the bottom boards making electrical connection to the two boards above via through hole sockets. The ASIC motherboards are plugged onto these pins. Wire ends are terminated by a machine onto brass rings A wire carrier base board The cavities hold the terminated wire ends, while the pins define the wire locations and making electrical connections to the wires 32 wires placed onto the wire carrier board A cover is riveted onto the board, locking down the wires. 10

The Wire Frame The top and bottom C-channel frames hold adjustable tensioning bars on which the wire carriers are attached. Each tensioning bar can be adjusted along two guiding rods on the C-frame, and many tensioning screws (not shown) to ensure the tension and the position accuracy of all wires. 11

In Vessel Front End Electronics Preamp motherboards CMOS preamp/shaper ASIC motherboards are installed on the mounting rails attached to the TPC wire frame. The input connectors are plugged into the mating pins on the wire carriers. Bias voltages to the wires are provided through the preamp motherboard. The ASICs are fully submerged in the liquid argon. 12

MicroBooNE TPC Inside the Cryostat The TPC will be fully assembled outside of the cryostat, mounted onto a cart and inserted into the cryostat. 13

LBNE LAr40 Introduction  LAr40 is one of the two technology options for the far detector of the Long Baseline Neutrino Experiment.  LBNE Primary Objectives: Neutrino oscillation Nucleon decay Supernova,…  LAr40 has 33 kton fiducial LAr mass to achieve the sensitivity of “two 100-kt (fiducial) Water Cherenkov Module equivalents”  Currently sited at the 800’ level at the Homestake Mine at SD. 14

LAr40 Conceptual Design at 800L 15

LAr40 Key Design Parameters Cryostat2 x 49m(L) x 19m(H) x 24m(W), 50 kton total LAr mass TPC cell active volume 7m (H) x 7.5m (W) x 2.5m (L), 180 ton active LAr mass Number of TPC cellsIn each cryostat: 108 = 2(high) x3(across) x18(deep) Anode Plane Assembly (APA) 7m x 2.5m active area, 5cm thick, with cold electronics mounted on one end. Wire properties150µm, CuBe, 4.9N tension Wire planes4 planes on either side of an APA Grid (vertical, non-readout), U & V wrapped in a helical pattern (±45º nominal), X (vertical) 5mm nominal wire pitch Cathode bias-187 kV, 500V/cm drift field, 3.7m drift In vessel electronicsCMOS ASICs, 2304 front-end ch. per APA, ~0.5 x10 6 ch. total. ~15mW per ch. Highly multiplexed and redundant digital output with zero suppression 16

Anode Plane Assemblies (APA) 7mx2.5m, stainless steel construction, 250kg 4 planes of 5mm pitch 2304 sense wires, 3312 wires total Electronics on one end of the frame The central part of a TPC cell is the anode plane assembly. It is a stainless steel framework, with 4 layers of wires on either side. The two induction wire planes (U & V) are ±45º, and wrap around the APA in a helical fashion. This enables all the wires to be readout at one narrow end of the APA, greatly simplifies the placement of the front-end electronics. In the cryostat, two APAs are stacked with minimal dead space at the joint. 17

APA Cross Section Views Cross section of the readout end of an APA Cross section of the non-readout short end of an APA Cross section of a long end of an APA A design to achieve modularity and minimum dead space between modules 18

APA Close-up View A smaller scale model is shown 19

Cathode Plane Assemblies (CPA) 7mx2.5m, stainless steel construction, ~100kg One stainless steel wire mesh plane -187kV bias voltage 20

TPC Assembly in the Cryostat APAs CPAs Field cage 108 APAs 144 CPAs Installed under 7 mounting rails hanging from the cryostat ceiling This construction is chosen to simplify the TPC structure: gravity helps to keep the modules stable. A very small roof hatch is needed in the cryostat for TPC installation 21

Summary and Outlook  The use of in vessel cold electronics is the key for the new generation of LArTPCs. MicroBooNE: superior signal to noise LAr40: results in drastic reduction in the cable plant (source of contaminants), enables highly modular and efficient TPC construction, and allows the cryostat to be optimized with minimal penetrations.  The modular design of the LAr40 TPC simplifies fabrication, transport, storage and installation of the detector, makes scaling straightforward.  MicroBooNE is currently preparing for the DOE CD2 review this summer. TPC Construction is scheduled to start in the fall.  LBNE is planning to make a “Technology Decision” near the end of this year, and the DOE CD1 early next year. If LArTPC is chosen to move forward, we’ll start to construct a 1kton scale TPC (LAr1) to demonstrate and validate the LAr40 design. 22

Backup Slides 23

24 Signals in LAr TPC  A 3mm MIP track should create 210keV/mm x 3mm /23.6eV/e = 4.3fC.  After a 1/3 initial recombination loss: ~2.8fC  It is expected that the TPC design will maximize the drift path to equal or exceed the charge life time, thereby reducing the signal to 1/e≈  The expected signal for 3mm wire spacing is then ≈1fC=6250 electrons, … and for 5mm, ≈10 4 electrons, for the collection signal.  The induction signals are smaller Induced Current Waveforms on 3 Sense Wire Planes: Charge signal:

LAr40 TPC Readout Scheme 25

Intermediate Wire Support Wire support structures are mounted along the 5 internal frame bracings. Maximum unsupported wire length =1.6m Dead space introduced ~ 1mm 26