Marine Environmental & Construction Project Management Projects on time and within budget.

Slides:



Advertisements
Similar presentations
TEN-T support for Port projects under 2012 Annual Call INFO DAY 2012: Ports (AP) Jose Anselmo, DG MOVE Morten Jensen, TEN-T Executive Agency Brussels,
Advertisements

Energy Facilities 11 AAC Energy facilities. (a)The siting & approval of major energy facilities by districts and state agencies must be based,
Connecticut Brownfield Sites
1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
Spill Response Waste Reduction. Gold Crew Gold Crew with the following capabilities: Spill Cleanup – Concentrated Type II Water based Oil Spill Dispersant.
ENERGY SURVEYING Please Click through this presentation.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Transportation Systems Highway Transportation Characteristics.
Marine Litter Presentation On Marine Litter To The. Workshop at “Mombasa Marine Park Conservation Alliance Project” on the 7 th September, 2011 at the.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
Revised: 11/08/2010 Environmental Health & Safety (EH&S) Management David L. Patterson Director, Environmental Health & Safety Cal Poly Pomona Web:
Infection Prevention Fireworks, Non-Clinical IP Issues for CAHs Randy Benson Executive Director RHQN.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Fossil fuel is formed from decayed plants or animals under high pressure, high temperature and bacteria action. To find oil and natural gas, companies.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
Chapter I. Introduction. Naval Architecture: the science and engineering of designing ships and other kinds of waterborne crafts. Kinds of ships Sub systems.
Environmental Legislation and Agencies Review. Sets a time table for phasing out ozone- depleting substances.
Solutions for Flaring & Venting CNG Marine Transportation
USS MISSISSINEWA (AO 59) Oil Offloading Operations Ulithi Atoll, FSM February 2003.
Environmental Management Services
Claire Gibson, Wave Hub General Manager 19 February 2013
Gulf of Mexico Simultaneous Operations Safe Work Practice
Regulation of Pipelines
Oil & Gas Issues. High Arctic: Challenges Protection the fragile natural landscape. Adjusting to the cold climate. Drilling on ice flows and small islands.
Chapter 14.3 Environmental Issues. The Emergence of Environmentalism Every time we drive a car or throw away trash, we are harming our environment. The.
Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental.
WHO WE ARE 2007 BP SHIPPING clean seas safe ships commercial success.
Shanghai International Maritime Forum 2007 Oil Transportation and Pollution Prevention Tim Wilkins 国际油轮船东协会 Regional Manager Asia-Pacific Environmental.
- Main Types of Water Pollution in Hong Kong - Source of Stream Pollution - Source of Marine Pollution - Cause of Water Pollution in Hong Kong - Effect.
Don’t Scrub When You Can Be Clean A Mobile CNG Pipeline Operational in 6-12 months Low capital expense Relatively short contract duration Phased-in approach.
Swinomish Oil Spill Preparedness Project Jon Boe Swinomish Environmental Management Specialist Swinomish Indian Tribal Community La Conner, Washington.
Definition of Hydrography
Dredging Engineering: Building & Maintaining Underwater Highways
Name that Legislatio n! Review. Sets a time table for phasing out ozone- depleting substances.
The TERMPOL Review Process RDIMS# Presentation Outline  What is TERMPOL?  The Purpose of TERMPOL  How TERMPOL Works  Benefits of TERMPOL 
ENERPLUS REGULATORY STRUCTURE (U.S. OPERATIONS) MARCH 2012.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
Mission 5 By Poseidon's Goldfish (Ellie, Shin Be, Mike and Dyson)
Ch Water Sustainability through Science and Technology.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Unit 2 Careers. Aerospace Engineer A person who the research, design, development, construction, testing, science and technology of aircraft and spacecraft.
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
British Columbia Agency Update Pacific States / BC Oil Spill Task Force AGM October 1, 2014 Wes Shoemaker, Deputy Minister BC Ministry of Environment.
Environmental Issues Latin America. Review What is air pollution? –The addition of harmful chemicals to the atmosphere What is acid rain? –Rain containing.
Port Authority of Guam PB International PORT EXPANSION PLAN.
ENVIRONMENT.
1 Iowa AWMA Meeting Kurt Shobe, MS, PG, CHMM GeoStat Environmental, LLC.
Boiler Operations, Maintenance and Performance Conference.
What does a Civil Engineer do?
Table 1. Environmental impacts associated with upstream and downstream petroleum operations Aniefiok E. Ite et al. Petroleum Exploration and Production:
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
Euromed October 2010 A Flexible Desalination Solution.
EURO-AG Ltd 14, Tramvayny prospect, office 308 St. Petersburg, Russia T: F: E :
AIS/WX Project Disseminating Environmental Information to Mariners via AIS Technology Bill Benning Chief Technology Officer Marine Exchange of Alaska.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Same dredger, different location: Environmental impacts of dredging
The Briggs Group.
Sarah Black, Project Manager, The Green Blue
St. Louis District Biological Opinion RRAT
THE RELEVANCE OF SURVEY APPLICATION IN OFFSHORE CONSTRUCTION
Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer
EHS: Spill Prevention, Control, and Countermeasure (SPCC) Jackson, MI / 40 CFR Part
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Update on TCEQ’s Role in Oil & Gas Waste Management
Presentation transcript:

Marine Environmental & Construction Project Management Projects on time and within budget

O&G Construction- Marine Projects Harvey Solutions formed 2007 Marine Environmental & Construction Project Management Cliff Harvey-Owner/Director Clients & Projects: 1.Ocean Engineering Systems; 1.Hong Kong- Pipeline trenching, 2.Turkey (Marmara & Black Sea) 2.Woodside; 1. Karratha-shore crossing & pipe pull 2.Pipeline trenching 3.Berth pocket blasting & dredging 3.Chevron-KJV; 1.LNG access channel dredging 2.MOF island construction reclamation 3.Temporary island wharf construction 4.APLNG-Conocophillips 1.43% Gladstone LNG dredging & reclamation (~14 Mil cubes) 2.Construction of Jetty, MOF, Landing ramps, ferry terminals, aggregate import and export terminals

Environmental 10 years prawn farm construction, operation management, development & assesments Plume modelling and monitoring- – national & international Interface management/relationship development – Excellent track record with State, Federal agencies Marine transport (MSQ), regulation (AMSA), Parks (GBRMPA & DAFF) Hydrocarbon spill management – Marine & intertidal

Previous Projects: Hong Kong Twin Pipeline burial

Previous Projects: Hong Kong Fleet management 500t Derrick Barge Hong Kong

Previous Projects: Hong Kong Plant Mixed air diving Post-lay Trenching machine Barge deck layout On the fly engineering

Previous Projects: Hong Kong Vessel & Plant import/export

Previous Projects: Business development CNG compressor distributorship Turkey Concurrent contracts for Botas and VISCAS Turkey

Previous Projects: Pluto-material offload facility & berth pocket Marine Blasting

Previous Projects: Pluto Shore crossing Pipe pull

Previous Projects: Pluto Shore Crossing Backfill

Previous Projects: Pluto BMF Dredging & Blasting

Environmental Site management: (EMP’s) Waste (WMP’s) General Contaminated Hard waste Waste stream procedures and procedures Training of staff increasing awareness and behavioural change Interface management Sub-contractor Client

Oil spill management (>10m 3 )

River health assessments

Peak flow management

Plume management

Seabed Survey

Stairway to the moon END