Technical Support 2008 1 8/7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
Technical Support /11/08 PHENIX WEEKLY PLANNING 12/11/2008 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch

Technical Support /7/08 Shutdown ’08 Schedule Design & Safety Review Action Items: Mu Trigger Done RPC Prototype InstallationDesign in progress ready for review by 8/15 New BeampipeWaiting for Funding recommence efforts continue 10/1 CM CraneVendor response rec’d, address remaining concerns and resubmit for final quote by 8/31 Sta. 1 and MMN ScaffoldingDone RPC Factory: Prototype C tests Complete Prototype D Testsgaps & module frames received on schedule for 9/15 installation Dark Current test standin design due 9/30 Mu Trigger FEE upgrade: Station 2/3 scaffoldingDone Station 1 scaffoldingDone Rack components (N&S)on order, receive by 8/8

Technical Support /7/08 Shutdown ’08 Schedule Mu Trigger FEE Upgrade (cont’d): Rack assemblyin progress finish by 8/15, install by 8/22 LV cable prepDone Optical cable prepIn progress N&S platforms Fabricate & installfabrication in progress, install by 8/15 (Pearson) Rebuild Bridge & EyebrowComplete by 9/30 Prep work for platforms (water/elec)in progress finish by 8/15 LV cable installationComplete by 8/29 optical cable installationComplete by 8/15 FEE installation N&S sta’s. 1,2 & 3Aug-Sep. FEE water and dry air installationAug-Sep Rack (N&S) installation8/22 Install S rack cooling & electricOct. Install FEE’s in MMS for RPC testNov. Rack room electronics, etc.Sep.– Oct. Final rack utilities Sep.-Oct Disassemble station1 scaffoldcomplete by Oct 15 Testing Sep.-Nov. Complete by 11/15 RPC engineering & safety reviewDone

Technical Support /7/08 Shutdown ’08 Schedule, cont’d RPC proptotype installation: Prep workcomplete by Oct 31 move (7) MuID pipes move gap 5 south cable tray Rack prepComplete by Aug 29 RPC prototype gas systemJuly - Aug Move shielding for installationJuly - Sep RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug RPC prototype install (RPC2 – PHENIX) Sep. – Oct. (RPC3 – C. Pearson) Sep. - Oct. Install rack in tunnel southSep. Replace tunnel shielding/Vapor BarrierNov. (C. Pearson) Connect electronics/gas Sep. – Nov. MuTr Decapacitations (Sta. 1 N and MMN)Station 1 Done Sta, 2/3 in progress/ finish by 8/15 Fan Tray maintenancein progress (on going fill-in) PC1 west work (needs planning)Oct. 15 CM Crane InstallOct. 20 HBD InstallOct. 27 DC East?/West RepairsNov. 15

Technical Support /7/08 Shutdown ’08 Schedule, cont’d Remove all inst’n equipment Sta 2/3 scaffoldsRemove by 11/15 all other testing equipmentRemove by 12/1 Prep for shutdown 2009 Gap 5 N piping and cable tray re-loc.Oct. – Dec. Gap 2 N cable tray & crate re-mountsOct. – Dec. Prep for run 9 Begin run 9 Prep12/1/09 Install all lampshadesComplete by 11/26 Roll in EC12/22 Pink/White/Blue sheets12/29 Close shield wall 12/31 Cryo Start up1/1/09 Flammable Gas/start shifts 1/11/09 Start physics1/18/09 End Run 96/30/09

Technical Support /7/08 1) Run Power to new MuTrgr FEE racks on MMN and MMS - Final design of the reworked North Muon Power Distribution System is set. Nearly all material acquired eithout cost. Paul is m revising the One-Line electrical drawing. CAD approval required…maybe by next week. Effort should take ~ 1 week. The new power cable feed to the MuTrigger rack is installed (2 cables, 1 spare) with no connection to the panel down below. The new North side power panel is installed on the IR North east corner wall. The new 75 KVA transformer for the entire North Arm service is reconditioned and tested satisfactory. The power for the South RPC tunnel Rack(s) to be taken from an existing (spare) breaker in the Muon Tracker power panel. This should take less than 1 day to install. PHENIX electrician needs to install vertical section of cable tray from North Magnet Lampshade to underside of new rack platform. CAD concurrence for construction details (Pearson) is required. MuTrigger LV Rack construction to require 4 man days to complete starting Monday 8/11. 2) Install power feeds to RPC north & south tunnel racks from IR power panels. – Plan is to run the cables from the IR to the North tunnel rack locations. The south RPC rack power can be taken from the existing (spare) breakers in the SMI power panel located on the IR south west wall. These cable runs may take a few days to complete due to new power tray runs required into the tunnel areas. Not done due to lack of manpower – working on other higher priority items. Shutdown ’08 Electrician Work

Technical Support /7/08 3) Assist in signal and LV cable installation for MuTr/RPC upgrades as necessary. Work in progress – working with students – have pulled in number of optical and LV cable bundles. 4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. - on Hold until new floor plan is determined 5) Install new UPS in Gas mixing house. Not done due to lack of manpower – working on other higher priority items. 6) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. - This job is on hold. No new racks in CM this year. 7) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Not done due to lack of manpower – working on other higher priority items. Shutdown ’08 Electrician Work, Cont’d.

Technical Support /7/08 New FEE Platforms & Modified Bridge Parts

Technical Support /7/08 MuTrigger FEE Rack Utilities Tees and Valves North FEE & Tunnel Electric Supply

Technical Support /7/08 MuTrigger FEE Installation Prep North & South Rack Prep First Chasis shipment has arrived

Technical Support /7/08 North FEE & Tunnel Electric Supply MuTrigger FEE Installation Prep Station 1 FEE Support structure

Technical Support /7/08 MuTrigger FEE Installation Prep North FEE Rack Platform is in Temporary Access to Rack Platform is in

8/7/0813 MuTr FEE upgrade status August 7, 2008 PHENIX Planning meeting Tsutomu Mibe (KEK) for the MuTr FEE upgrade team 13

8/7/0814 Cable running 14 New rack platform was installed here. Mike Rau Started running cables from Yesterday LV Optical -Cabling in the magnet -Completed : octant 8, 7, 6, 1 -Pulling up LV cable to the platform -Completed : octant 7 -Working on octant 8

8/7/0815 Test bench Progress BCLK distribution (Steve, Sal, Frank) QA – Chassis backplane test from next week – ADTX board from Sep. MRG test MRG-LL1 test (with Todd Kempel) MRG-DCM test Need G-Link signal from MuTr GTM in August. PHENIX-VME communication (Ed Desmond) 15

8/7/0816 OASYS maintenance Replacement of the server for OASYS (Optical Alignment SYStem for muon tracker). Done Adjustment of cameras. Almost done – Some needs to adjust light source position/angle. 16

8/7/0817 Shipping from Japan ADTX chassis – 60 pcs (~Aug 6) Arrived – 70 pcs (~Aug 8) coming FEE-ADTX cables – 200 (30cm) depart KEK in Aug 11 – 109 (30cm) (~Sep 3) – 524 more pcs to come ADTX boards – 20 boards (~beginning of Sep) – 200 more boards to come 17

8/7/0818 (Intended) installation schedule Cables running Station 2,3 (this week) Station 1 (next week) ADTX chassis Backplane test (in progress) Water leak test (John) will be mounted from mid. August (Jimmy). Connect cables in late August. ADTX board will be installed from mid. Sep. 18

Technical Support /7/08 Mike’s Happy DeCap Access Platform Mu Tracker North Decapacitations

Technical Support /7/08 RPC2 Prototype Installation

Technical Support /7/08 RPC2 Prototype Installation, cont’d

Technical Support /7/08 RPC2 Prototype Installation, cont’d

Technical Support /7/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /7/08 RPC Absorber Concept Drawings at CS for estimating Expect quote by end of week

Technical Support /7/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM No Changes

Technical Support /7/08 Rack Room Reorganization Inventor model in progress

Technical Support /7/08 CM Crane, Station 1 scaffolding CM Crane procurement postponed Until FY09 Response from Vendor (The Bartholomew Co. local distributor for GORBEL) received. Sent to CA safety for review. Most issues fully addressed. Plan to address remaining issues by 8/15, send to vendor for requote, place order by 9/30

Technical Support /7/08 Safety, Security, etc. Now that all the scaffolding and the North platform are approved and in use, make sure that everyone reads the work permit and complies with all of the rules 2 new generic enhanced work plans at CAD: LOTO (new rules presented in CAD training sessions last month) General Radiological Work Permit for work in CAD posted Radiation Areas (e.g. RHIC tunnel) New DOE rule for persons with cardiac pacemakers: may not enter areas with static magnetic field > 5 gauss July ESH summary is out 1 DOE recordable, 8 first aids, 0 DARTS

Technical Support /7/08 Safety, Security, etc., Cont’d BNL July Occupational Injuries: - Employee using box cutter to trim tie wrap cut hand – DOE Recordable - Employee pushing chair back from desk, chair snagged on carpet, fell injuring wrist - First Aid - Employee cutting pipe under truck hit head on truck frame - First Aid - Employee sanding stainless got foreign material in eye - First Aid - Employee removing batteries from vehicle pulled back - First Aid - Employee sensitive to a certain chemicals smelled one and got sick - First Aid - Employee holding door frame, wind got door slammed on hand – First Aid - Employee pulling recycling containers to dumpster – felt pain 2 weeks later – First Aid

Technical Support /7/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: some places I’d rather be