Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
H.E.S.S. High Energy Stereoscopic System Jon Cerny Bancroft-Rosalie School August 2002.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
SINP MSU, July 7, 2012 I.Belolaptikov behalf BAIKAL collaboration.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Muon-raying the ATLAS Detector
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
The Stripping Foil Test Stand in the Linac4 Transfer Line
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Development of the CMS Databases and Interfaces for CMS Experiment: Current Status and Future Plans D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova,
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
First CMS Results with LHC Beam
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
1ESAComp Users’ Meeting 2006 University of Applied Sciences of Northwestern Switzerland March 2–3, 2006 High-Precision Composite Support Structures for.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Philtec Positioning Device D63 SENSORS. DC Spark System D63 Sensor Context: – Philtec was contacted to ask for the possibility of installing a new positioning.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
This document is a working document and a base for discussions. Everybody who thinks to have better ideas is warmly invited to change it ! Muon alignment.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Optoelectronics group meeting, 27 Jan 2006
Last results from tests
An-Najah National University New Campus, Nablus, Palestine
Summary of Muon Studies Yoke Discussion
Pressure monitoring system for the CMS muon chambers
Preliminary Y-chamber specifications – First draft
SciFi option for neutrino target tracker
LumiCal mechanical design, integration with LDC and laser alignment
Need for Alignment Position of off-momentum proton w.r.t. beam
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
CNGS horn / reflector in 2005: The story of the glass ring insulator
Variable distance from beam.
Status of the Calibration
Presentation transcript:

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration of the position monitoring elements on the barrel muon chambers for the CMS experiment: First experience The work is supported by The Hungarian Scientific Research Fund OTKA T , T034910, T The Barrel muon Alignment Collaboration: Institute of Nuclear Research, ATOMKI, Debrecen, Hungary European Laboratory for Particle Physics CERN, Geneva, Switzerland Institute of Experimental Physics of Debrecen University, Debrecen, Hungary Institute for High Energy Physics, Vienna, Austria

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 2 Activities carried out for the period of 24 th Jan to 4th Apr 2003 on the Bench ACTION PERFORMEDDATE. TIME BENCH CALIBRATION: LTD, stability measurement, full bench photogrammetry 24 th Jan (stability: Jan 23) stability measurementsJanuary 27,29,31 February 04, 06 Mach 01, 20 Chamber ID: MB2 Photogrammetry Camera measurement April 01 April 02 10:32 Chamber ID: MB3 Photogrammetry Camera measurements April 02 April :06 Stability measurementApril :25 Chamber ID: MB1 Photogrammetry Camera measurements April 03 April :21 Stability measurementApril :24 Chamber ID: MB2 Photogrammetry Camera measurements April 04 April :05 The same MB2 chamber (for repeatibility test)

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 3 LTD Calibration Calibration plates equipped with optical fibers

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 4 Chambers on the bench MB1 MB2 MB3

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 5 Taking photogrammetry pictures (31 March – 4 April 2003) The corner blocks equipped with targets The plate equipped with targets

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 6 Stability measurements 1.Every camera on a plate is facing the LEDs on the opposite plate of the bench. 2.Automatic measurement of the centroids of the images of the LEDs on the opposite side by each camera. 3.The data is recorded in the database with date, time, temperature, amounting to 112 measurements altogether. Measurement of the stability of the bench:

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 7 Stability measurements: the bench is remarkably stable! The Bench has shown a remarkable stability along the three month period. >The displacements in X ~ 0.02 pixel >The displacements in Y ~ 0.03 pixel Within the resolution of the measurement Line 0 plate 1

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 8 Reflections One LED “ON” on the “6” side All LEDs “ON” on the “6” side One LED “ON” on the “4” side All LEDs “ON” on the “4” side The camera image After processing: The correct spot found The problem is solved.

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 9 Chamber measurement: summary of the first experience 1. Time needed: crane + feet operation: ~2 hours, 4 people needed for the operation. Photogrammetry + camera measurement: 2 hours. 2. Repeatability of a fork installation (repositioning error): within the error of the camera measurement less than about 0.03 pixel. 3. Repeatability of a chamber calibration: the MB2 chamber has been measured twice, the data is still to be analyzed. 5. Several problems have been detected. 4. Repeatability of the positioning of the chamber is OK with the present feet idea (about 1 or 2 mm).

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 10 Problems (I) 1. Feet: the principle is OK but a new design is needed to ease the operation (to be discussed). 2. Corner blocks: the hole diameter (nominally L=11 mm Ø8 H7) is often short and/or tight). A temporary solution was found by asking for shorter photogrammetry targets to be made. 3. Pins: In some chambers the pins where the forks are to be fixed are missing.

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 11 Problems (II) 4. Labels: a) Sometimes not readable by the barcode reader. b) Double labels (A and B type) on the same chamber 5. Cabling: The available information is not enough to allow us to define the length of the cable.

Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 12 Status - summary 1. The calibration measurement is done for 1 chamber (out of 250). 2. MB1, MB2 and MB3 chambers have been tested on the bench. 3. The bench is ready to make measurements (stability, camera and photogrammetry and store the data in the database). 4. The analysis program for the reconstruction of the geometry is being finished.