April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Magnets for the ESRF upgrade phase II
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Rotating Coils - Giordana Severino – Rotating Coils PACMAN meeting Printed Circuit Coils – Future developments.
1 / 17 Author CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland Title.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
Author CERN – Geneva – CH Jacques.Dutour 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland 1 / 16 MQW magnets:
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
AT Measurement Systems
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
Magnet Design & Construction for EMMA
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
PIP-II Solenoid Focusing lens for SSR2 Cryomodule Kumud Singh, Affiliation: Bhabha Atomic Research Centre PIP-II Technical Meeting 19 Jan 2016.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin Mechanical Group, Accelerator Division Institute of High Energy Physics 13 th International Workshops on Accelerator.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
BARC First Prototype PXIE Magnets Measurements at Fermilab 9/16/2014Michael Tartaglia, TD/T&I Dept.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
Magnetic Measurements At SLAC
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
on behalf of the CLIC active pre-alignment team
Geometric and Magnetic Measurements
Contents Future requirements for magnetic measurements
Development of the Canted Cosine Theta Superconducting Magnet
Have a chance to operate your own beam at CERN
Powering the LHC Magnets
Magnetic Measurements For The LCLS Undulator System
CHEN, Fusan KANG, Wen November 5, 2017
SCU Next Phase Meeting July 8, 2014.
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
News from the FNAL test facility
Magnetic measurements at ambient temperature on the MQXFBP1
Simplified Procedure Draft
Presentation transcript:

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture and calibration equipment Didier Cornuet & Juan Garcia

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Magnetic Measurements needs and activities: 1.Alignment: axis & angles 2.Local fields, harmonics 3.Integral fields, harmonics… Instruments available Benches at our disposal and geographic locations Fabrication and Calibration laboratory and synergies Geometric measurements: Leica survey Proposals for future Overview

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Activities Magnetic measurements of resistive magnets Equipment and systems for all magnetic measurements : development, specification, procurement, evaluation. Coil winding and modules assembly & calibration. Associated reference magnets & facilities. SMA18 & SM18 field measurement equipment: development & manufacturing. MQ-MB factory magnetic measurement equipment & CERN reference systems.

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation –Dipole Industry Magnetic Measurements (DIMM) –Quadrupole Industry Magnetic Measurements (QIMM) –Long shafts for MB (13 x 1.2 m) –Long shafts for MQ ( 6 x 0.75 m) –AC moles (warm & cold) –Polarimeters –Set of Hall probes (B3-B5, probe arrays) –Single and Double Stretched Wire systems –Numerous sets of search coils Instruments

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation –They take place in two halls: 867-RH29, 6 Benches and 5 (6) pulsed Power supplies (from 250 A to 6 * 500 A). 867-RC07, Air conditioned room (160 m2) with one Power supply (600 A). –Magnetic measurements of magnets for: Linacs, Booster, PS, AD, CTF3, SPS, LHC, CNGS, LEIR, CLIC and external labs. –Magnetic conformity of repaired or rebuilt magnets –Measurements of prototypes Measurements for resistive magnets (I)

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Measurements of Resistive magnets (II) AT/MTM/RM MEASUREMENTS PROJECTS LHC MBW, MBXW(D1), MCBW, 15 MQW MBXWS, MBXWT, 32 MQW End of 52 MQW series, MBW, 10 H & V correctors for SPS & LHC Dipoles MBW, MBXW SPS 9 Repaired MB & MQ2 repaired MQ8 Repaired MB & QP PS/LINAC4 4 Injection Quadrupoles Field map of main unit 2 Pulsed elliptic quadrupoles Quadrupole Q120 Permanent magnet quadrupole LEIR Triplet (3 Quadrupoles) 3 solenoids CTF3 Type II Dipole QL3Combined H/V corrector Wiggler, Quadrupole, Sextupole, 4 Septas CNGS MDG dipole DIAMOND Quad INFN/CNAO SC sextupole Prototype dipole

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation 1.LINAC harmonic bench (DC quads, for pulsed quads no longer operational). 2.Harmonic bench for large dipoles &quadrupoles 3.Calibration bench for coils (up to 2 m long, also possible field maps for C type magnets ) 4.Helmholtz and Gradhelm coils (surfaces and distances) 5.Single stretched wire for small quads (not operational) 6.3D bench for field scanning 7.PS bench for dipoles, quadrupoles and sextupoles (DC and pulsed modes) 8.LHC harmonic bench 9.SPS dipole bench 10.SPS quadrupole bench 11.Double stretched wire bench 12.Field mapping bench (DC and pulsed mode) Measurements stands for resistive magnets

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Magnetic measurements of resistive magnets (prototypes and series samples) during 2005 End of series measurements of the 52 MQW quadrupoles MBW dipole for LHC Pulsed elliptic quadrupole for the PS gamma-jump 3 solenoids for LEIR 10 hor. and vert. corrector magnets for SPS and LHC PS spare unit without and with shims and new PFW

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation –MTM group own 2 Laser Trackers for survey –AC mole for magnetic and mechanical axis (warm and cold) –SSW for magnetic axis and roll angle –Synergy with other groups having the same equipment Magnetic Alignment measurements Leica Laser tracker Cold Bore Tubes Connection Side D10 D11 Tripod AC Mole Lyre Side

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Performed in two labs: B.230 & I8 nearby –Coil manufacture –Assembly and micro connections –Calibration in ref. dipole : surface and parallelism –Calibration in ref. quadrupole: radii –Moles and shafts assembly and their calibrations –Maintenance of equipment –Consultancy inside and outside CERN. Activity of coil manufacture and calibration

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation 50 mm 250 mm Winding Lab at Building 230

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Coil interconnection and cabling Example of an Interconnection scheme: 10 strand wire in a 20 strand connection plate Connection plates embedded in coil core, left: single wire, right: 20 strand wire Preparation for soft soldering of a 20 strand connector Signal cables connected to their coils All coils of a sector connected 4 mm 12 mm 10 mm 50 mm

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Magnetic Calibration The laboratory: Short reference quadrupoles [0.3m, 0.5m] Reference dipole [2.5m] Power supply for reference dipole Reference quadrupole [1.5m] 15m cryodipole Assembly Soft soldering Grinding -Several reference magnets installed in former ISR tunnel, good stabilization in temperature

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Dipole reference magnet: -Effective aperture: l=2.5m, h=80mm, w=300mm -Field: 1T (stab.:10 -5 T), monitored continuously with NMR probe and periodically mapped -Field angle aligned to <0.1 mrad w/r gravity -Used for calibration of coil area, parallelism and absolute angle (up to 5 coils simultaneously) -Overall uncertainty: 2x10 -4 (repeatab.: 5x10 -5 ) Magnetic Calibration (I8) Dipole Rotation support Integrators and PC NMR probe Quadrupole reference magnet: -Magnet aperture: l=1.5m, Ø 125mm, -Field gradient of 8.6 T/m 480 A) -Used for calibration of coil radii (up to 5 coils simultaneously) -Overall uncertainty: 5x10 -4 Quadrupole Integrators and PC Rotation and centering support Lateral stroke Sensor (res mm)

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Measuring Head Assembly (bldg 230) Prototyping and repair workshop: Turning… …milling… …drilling Adjustment table for Level meters Dynamic gluing table UV curing for coil gluing

April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Proposals for future Consolidate 230 & I8 labs for fabrication & calibration. Unique facility to make coils. Move some benches from Prevessin (calibration, 3D, Linac, small SSW) Add to I8 functionality to measure middle size magnets or prototypes by improving infrastructure (repair of the crane rails, and better communication with B.181) Keep benches associated to big Power Supplies in Prevessin for PS and SPS