Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
Recap Analysis RIKEN/RBRC Itaru Nakagawa. Conductive Rubber Attempted to cut in RIKEN using super sonic cutter. Achieved Precision ~ ± 0.8mm 抵抗値 富士高分子.
Comparison of 3 types of scintillator strips and 2 types of reflector films Miho NISHIYAMA Shinshu-U Light yield of 3 scintillator strips have been measured.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Performance of new strip scintillator Jungeun Lee, Jaeyun Choi, Kyungpook National University Minseok Park.
L1 Trigger for ACDC Jianchun (JC) Wang Syracuse University VELO ACDC Software Meeting 01/20/2006.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
RF BD statistics in the TD26CC accelerating structure J. Giner-Navarro 18/11/2014 CLIC Breakdown meeting 118/11/2014J. Giner-Navarro.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
Measurements on glasses & crystals. An update Diego Cauz University and INFN of Udine Aug 18 th 2009, Fermilab.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
First Results from T3B Calice AHCAL Meeting – Desy, January 2011 Christian Soldner Max-Planck-Institute for Physics.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Plastic scintillators for the g-RISING experiments Nami Saito.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
Trip-t testing progress report
1 Pad Chamber Simulation Results for Muon Trigger Upgrade 10/13/2003 Muon Trigger Upgrade meeting.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Performance of new MPPC Nov. 21 Korea-Japan joint meeting Takashi Maeda Hideki Yamazaki Yuji Sudo (University of Tsukuba) --- Contents ---
Beta-ray test for strip scintillator readout MPPC GLD Cal group KEK 06/2/28 (Tue) Niigata university Sayaka IBA.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
CLAS12 Pre-shower H. Voskanyan (YerPhI)  R&D: Test measurements  Prototype CLAS Collaboration, CLAS12 TWG Meeting February 28, 2007, JLAB.
Comparison of 3 types of scintillator strips Miho NISHIYAMA Shinshu-U Light yield of 3 scintillator strips have been measured using b-ray source. 1. fiber.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
TCT measurements with strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž 1,2, Marko.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
FVTX High Multiplicity Trigger for Run15
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Time Independent Analysis
SuperB meeting, Frascati
Preliminary Performance of the L2 Chamber (Side A)
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
ScECAL+AHCAL+TCMT Combined Beam FNAL
Analysis of Oct. 04 Test Beam RPC Data
Status report Minjung Kim
SksMinus status 14 HB meeting 2008/10/16 白鳥昂太郎.
Run5 Analysis of RHIC-pC Polarimeter
Characterization of Wired-OR prototype board
Presentation transcript:

Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa

Recompile Code Recompiled ~/work/Ana/mutrver01 and renewed bin/ and lib directories Before recompile After recompile dat100604/bkp/feeclus02.rootdat100604/feeclus02.root They are absolutely identical. Events in fADC[2]<fADC[0] region are still missing.

Timing Tune with Calibration Pulse

Calibration Pulse default Reflection? dat100615/pulse001.cdat Measurements are done without recap clamp

Timing Check dat100615/pulse002.cdat dat100615/pulse003.cdat

Timing Check dat100615/pulse004.cdat dat100615/pulse005.cdat

Timing Check dat100615/pulse006.cdat dat100615/pulse007.cdat

Timing Check dat100615/pulse008.cdat dat100615/pulse009.cdat 3.8us 3.6us trigger

Backup Scintillator Trigger  =+3.5cm r=27.5cm Chamber 90 Sr Trigger scintillator collimator Trigger scintillator

Trigger Timing w/ 90Sr delay:2BCLK Back Up Scintillator Trigger Strip#26 (E47) Difficult to observe correlated signal with trigger on scope.

ADC[2].vs ADC[0] dat100614/feeclus002.rootdat100614/feeclus003.root Scintillator HV=-1600V Scintillator HV=-1600V Scintillator HV=-1700V Scintillator HV=-1700V dat100614/feeclus004.root Scintillator HV=-1600V Scintillator HV=-1600V 20k events 500k events 50k events Only ADC2=ADC0 exists in large ADC region. Only ADC2=ADC0 exists in large ADC region. Perhaps chamber penetrated trigger may not cause large pulse in chamber?

Timing Tune with Cosmic data012.cdat data013.cdat 3.8us data013.cdat Default timing so far. trigger Strip 26

More Statistics w/ Cosmic dat100616/feeclus002.root 500k events 3.8us

90Sr Source (Delay=3.8us) dat100615/feeclus014.root dat100616/feeclus003.root Scitillator HV=-1700V Threshold=-200mV Scitillator HV=-1800V Threshold=-100mV

Summary Trigger timing was tuned with calibration pulse. Scintillator trigger timing was also optimized based on calibration timing (3.8us). ADC2.vs ADC0 correlation shows uniform distribution below MIP region (ADC<200). (Should be ADC2~5*ADC0 if correlated timing) Beyond MIP region, only ADC2=ADC0 events appears. Now understood.