Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 LECTURE.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

[Organisation’s Title] Environmental Management System
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 LECTURE.
Project Communication Management
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: The Project Management Process Groups
Why Managers Must Understand IT Managers play a key role –Frame opportunities and threats so others can understand them –Evaluate and prioritize problems.
Computer Security: Principles and Practice
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Lecture Nine Database Planning, Design, and Administration
Supplier Ethics: Program Checklist
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Release & Deployment ITIL Version 3
SYSTEM ANALYSIS AND DESIGN
Introduction to Information System Development.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Systems Analysis and Design in a Changing World, 6th Edition
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
S/W Project Management
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
PMP® Exam Preparation Course
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 LECTURE.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Project Life Cycle.
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Pre-Project Components
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 Project.
Information System Project Management Lecture Five
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
IS2210: Systems Analysis and Systems Design and Change Twitter:
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(C.S.E) UIT, M.S(S.E) AAU Denmark Assistant Professor Department.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Ondřej Přibyl L3: System Development Life Cycle page 1 Lecture 3: System Development Life Cycle Doc.Ing. Ondřej Přibyl, Ph.D. Department of applied mathematics.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Information Technology Project Management, Seventh Edition.
Computer Security: Principles and Practice First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Chapter 17 – IT Security.
Chapter 11 Project Management.
DRAFT Standards for the Accreditation of e-Learning Programs
Systems Analysis and Design
Project Management Chapter 11.
Role of State Audit Bureau of Kuwait in promoting and audit of IT Security  
Project Management Method and PMI ® PMBOK ® Roles
Presentation transcript:

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 LECTURE 32: PROJECT MANAGEMENT INFORMATION SYSTEMS

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 2 The Computerized Project Management Information System: PMIS

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 3 Project Information: Quality Parameters Accurate Adequate Relevant Current Specific Reliable Actionable Proactive Verifiable Source Integrity

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 4 Project Information: Quality Parameters Comprehensible Affordable Usable Integratable Documentable Transferrable Legal Duration

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 5 A Computerized Project Management Information System for Stakeholders Technology – in particular – ICT has benefited projects immensely. More and more project delivery org- anizations are making use of (com- puterized) Project Management In- formation Sytems (PMIS) to manage and communicate the vast pools of information which accumulate on their projects. PMIS systems can be purchased „off- the-shelf“ or developed as in-house solutions.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 6 A Computerized Project Management Information System for Stakeholders The (computerized) PMIS is not to be equated with a project management software solution. While PMIS do operate in a software environment and allow users to communicate and share information with each other via the internet or LAN systems, the function PMIS per- form on projects goes over and be- yond that of a typical project mana- gement software solution is capable of doing.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 7 A Computerized Project Management Information System for Stakeholders The basic function of a computerized PMIS is to ensure that information content about the project is commu- nicated electronically throughout its life-cycle in sufficient quantity to, and when needed by, all stakehol- ders involved in initiating, planning, implementing, winding up and/or monitoring, evaluating and control- ling the project so that they make the right decisions and take the right actions when required of them at the right time.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 8 A Computerized Project Management Information System for Stakeholders On large projects, it is common that thousands of files accumulate at different locations over time. Using a manual system to manage these files would be very costly and time- consuming. A well-conceived computerized PMIS helps ensure that the project is undertaken smoothly and with a higher likelihood that it achieves its goal within budget and on time (efficiency function).

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 9 Advantages of a Computerized PMIS  Cost-Effective Solution (larger projects)  Mature Technology  Current Standard  Excellent for Communicating with Disp. Stakeholders  Immediate Access to Information  Content Diversity (text documents, ima- ges, videos, visualizations etc.)  Rapid Content Updateability by Users  Integration in Larger PMIS Systems  Not Difficult to Learn to Operate

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 10 Disadvantages of a Computerized PMIS  Not Suitable for Many (especially smaller) Projects  Possible High Cost of Infrastructure (hardware, software, networking) and User Training  Ensuring Information Quality  Resistance to Use by Some Persons  Consistent Use  Possible Technical Issues / Problems  “An End in Itself” instead of “Means to an End” Syndrome

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 11 The Computerized PMIS (Recommended Technical, Concept & Design Standards) Scalable, Reliable and Up-to- Date Technology PMIS Administrator & Technical Maintenance Support Staff Large Data Storage Capacity & Regular Data Back-Up (to prevent information loss in the event of a major system crash) Security (from hacking & unin- tentional & intentional data corruption by viruses, trojans, worms etc.) Technological Compatibility with the Equipment and Network Infrastructure of the System Users (LAN, WAN, Intranet, Extranet, Internet, Operating System, Software) Interactive Capability (content uploading, download- ing and revision, searchability) User-Friendly and Flexible Design / Easily Navigateable Interface Confidentiality (selective access to content where and when accessibility needs to be restricted) Satisfies all Stakeholder (diverse) Informational Needs Usage Monitoring (content in- put & usage tracking capability) Content is Accurate, Complete, Relevant, Clear, Current, Heterogenous, Timely etc. Technical Performance Standards Content & Design Standards Automatic Notification of Content Updates Fast Access to Content

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 12 Project Stakeholder Information: (Quantity Vs. Quality) Information in abundance does not mean that the information is appropriate for a rigorous stakeholder analysis and for de- signing and implementing effective stake- holder engagement strategies! Before collecting information on project stakeholders, the project manager/team must have a clear idea exactly what infor- mation is required to avoid wasting time, cost and effort on amassing and process- ing “redundant” information.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 13 The Computer-Based PMIS (Concept Diagram for a Construction Project) Internal Stakeholders External Stakeholders Internet Access (public webpage only) Project Manager & Team, Sponsors, Steering Committee, Client (Users), Con- sultants, Government Agencies, etc. Project Management Information Database System Contractors Subcontractors Suppliers & Vendors

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 14 Modules of a Computerized PMIS (Initiation Phase Deliverables) Project Business Case Project Proposal Project Feasibility Report (Initial) Requirements and Specification Docs (Preliminary) Scope Statement Statement of Work Contract with the client organization(s) Project Charter Minutes of meetings held between the project sponsor/manager/team and the customer and users Miscellaneous Initiation-Relevant Documents

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 15 Planning documents are crucially important for any project. It is imperative that the stake- holders have access to all those documents and files which they need to effectively and efficiently perform their respective tasks. The key planning phase document is the pro- ject management plan (which may be periodi- cally updated) and its constituent subsidiary plans (i.e. Cost, Schedule, Risk, Scope, Pro- curement, Human Resource, Communication Plans etc.) Modules of a Computerized PMIS (Planning Phase Deliverables)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 16 Most of the project‘s allocated time and resources are spent in executing and sub- sequently closing down the project. A number of documents of files are generated here, including tenders, submitted bids and proposals, documentation on suppliers, sub- contractors etc., changes to the project scope and requirements/specifications, hiring of employees, various project reports, project winding up documentation etc. Modules of a Computerized PMIS (Execution & Closing Phase Deliverables)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 17 A project‘s monitoring, evaluation and control (MEC) effort spans the project‘s entire life-cycle frm initiation through to completion, all aspects of the project‘s performance with regard to its baselines and standards are critically reviewed and, where deficiences are observed, corrective action is taken. Project MEC is typically conducted observation mechanisms resulting in periodic reports, audits, meetings etc. which must be documented and compared for trends over the project life-cycle. Modules of a Computerized PMIS (Monitoring, Evaluation & Control Phase Deliverables)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 18 Modules of a Computerized PMIS (Information on Project Stakeholders) Basic Data (Name, Designation, Organization, Contact Details, Photos) Experience and Qualifications Reporting Relationships (on the project) Availability for Project Work (timing) Role and Responsibility in the Project (Int. Stk.) Interest(s) in the Project (Ext. Stk.) Mission, Goals, Objectives (for Organizations) Miscellaneous Relevant Information The information on the right is not exhaustive. More details can be collected, if the project demands.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 19 „A picture is worth a thousand words“. Vis- ual and multimedia content can be an infor- mative, interesting and useful supplement to the text-based „core content“ project information contained in the PMIS modules. Examples of relevant visual and multimedia content include drawings, sketches and Illustrations, (on construction projects) maps of the project site and surroundings, 3D architectural visualizations of buildings and facilities which are under design or construction, photographs and videos of the project site(s) in various stages of the project life-cycle, and of important events like the ground-breaking ceremony, inspection visits and public tours. Recorded audio messages can also be included. Modules of a Computerized PMIS (Visual Content)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 20 A help forum can promote the exchange of information between project stake- holders. Highly interactive, it draws upon the „hidden knowledge“, expertise, expe- rience and solidarity of individual project stakeholders to help other stakeholders to (for e.g.) tackle problem situations, improve their work performance, address specific queries and issues, share appre- hensions and concerns, exchange ideas and tips, or simply to notify about up- coming events. Encouraging such commu- nication between users is indicative of a good project culture and enhances the chances of project success. Modules of a Computerized PMIS (The Help Forum)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 21 Maintaining a Project Manager‘s Project Diary is a good idea! Important observa- tions, thoughts, ideas, apprehensions and concerns raised by the project manager, and/or which have been communicated to the project manager by other stakeholders in the course of the project life-cycle, and which normally would not find entry in formal project documents or databases, can be recorded here. With this information an organization can improve its project management standards and practices and boost its level of project effectiveness and efficiency. Diary entries should be made regularly (at least once a week) with access restricted to certain key stakeholders such as the project sponsor and the PMO. Modules of a Computerized PMIS (The Project Manager’s Diary)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 22 Completed projects may generate in- sights useful for similar on-going /future projects in various documents (proj. completion reports, reviews, articles, books, case studies, white papers etc.). A PMIS Knowledge Module can make this material available for reference. Information on laws and regulations and economic, political, tech- nological and market factors which directly or indirectly may affect the project, on different countries and on prevailing cultural sen- sitivities and work related issues (especially where transnational projects are concerned), are some items which may be included in the Knowledge Forum. Modules of a Computerized PMIS (The Knowledge Forum)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 23 All working on a project must be familiar with the standards, processes, tools etc. being applied on the project. If not, confusion and problems may result. To help overcome informational deficits here, a PMIS may contain information on all relevant aspects for all project phases. For example, if a project is based on the PMBOK standard, information on all the nine project management knowledge areas and the policies, procedures and guidelines which are applicable to the project could be included. Project docs such as templates, forms, registers, checklists etc. can be accessible here along with training material which aim to familiarize those involved in the project with the project mgmt. standard applied on the project. Modules of a Computerized PMIS (The Project Standards)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 24 Examples of PMIS Systems: US Army Corps Click on Image to View Webpage

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 25 The Computer-Based PMIS (Recommended Literature) This 37 page publication from the year 2000 is based on a survey of US states and a Canadian province by the National Cooperative Highway Research Program. Though somewhat outdated in light of current available tech- nologies, the survey gives in- sight into the features, streng- ths and limitations of PMIS at the time and the changing needs of users.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 26 The Computer-Based PMIS (What Does Empirical Research Say?) An empirical research study publish- ed in the International Journal of Pro- ject Management in 2007 examines the impact of IT-based PMIS Systems on project managers and project per- formance. Data was collected for this purpose from 39 project managers. The research discovered that the benefits of using IT-based PMIS Systems in practice include improved project planning, scheduling, moni- toring and control, timelier decision- making, better budget control, meet- ing project deadlines and fulfilling technical specifications.