Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License

Slides:



Advertisements
Similar presentations
Capital Program Oversight Committee (CPOC) May 23, 2011 Alok Saha, P.E., Program Manager, CPM Infrastructure and Facilities – Line Equipment, Shops & Yard.
Advertisements

Amitava Mitra, Solution Architect, Oracle Primavera, TCS
© Scordias & Morris, 2005 Virtual Classroom Visits: Using Video Conferencing Technology to Enhance Teacher Education Dr. Margaret Scordias Pamela B. Morris,
BIM EXECUTION PLANNING PROCESS
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
06/06/07 – 07/11/07 BIM Building Information Modeling.
BIM Management – A Strategic Approach
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Virtual Engineering Lab Faculty of Engineering – Cairo University Construction Management Applications January 11 th 2010.
Designer contractor engineers Builders Owner.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner.
ESTIMATING By Laith Jacob.
DASNY MWBE FORUM The event that will change your business CUNY & CUCF + MWBE = Partners in Success OCTOBER ,
Project Management and Scheduling
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 8 Slide 1 Software Prototyping l Rapid software development to validate requirements l.
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 8 Slide 1 Software Prototyping l Rapid software development to validate requirements.
Construction Project Management: Technology driven answers for schedule and budget savings.
Perspectives on Program Management and Project Management Michael Corriere, Ph.D., PMP.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Identify steps for understanding and solving the
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.
소프트웨어공학 강좌 1 Chap 7. Software Prototyping - Rapid software development to validate requirements -
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
1 Planning for Reuse (based on some ideas currently being discussed in LHCb ) m Obstacles to reuse m Process for reuse m Project organisation for reuse.
Building Information Models, DSA and the Future ACCM Annual Conference, June 19-20, 2008 Ryan Huxley, MS, SE, Senior Structural Engineer.
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Strategic Thinking and Decision Making Dr. Fred Mugambi JKUAT.
Software Prototyping Rapid software development to validate requirements.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The Benefits of Using BIM Software in Building Design and Construction By Jared Heber.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Operation & Maintenance Construction & Logistics 4D/5D Construction Fabrication Documentation Analysis Detail Design Conceptual Design Programming Renovation.
1.) Building Information Modeling The creation and use of coordinated, internally consistent, computable information about a building project in design.
COA 8903 Strategies for IT Adoption in the Building Industry Amol Kane Construction Engg & Management Georgia Institute of Technology ELEVATORS.
Collaboration in Contracting Teresa Magnus Vulcan Insulation Co.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Strategic Thinking and Decision Making Dr. Fred Mugambi JKUAT.
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
advices for advancing the productivity of the construction industry:
BIM & IPD This PPT is about Building Information Modeling (BIM) and
BIM EXECUTION PLANNING PROCESS
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
EXTRA SLIDES.
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
INTRODUCTION TO CAPSTONE PROJECT
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
BIM EXECUTION PLANNING PROCESS
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
DBIA Manual of Practice
Plan of Making (Flow Charts)
Plan of Making (Flow Charts)
Process for Organising Software Development Activities
Presentation transcript:

Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License

ORBEE Learning Material Introduction to Integrated Design and Delivery Systems Lesson 4- BIM & Construction Project Management

Lesson Plan Co-ordination problems in construction projects Using BIM for 4D Simulation Traditional scheduling methods and the need for 4D Simulation Using BIM for Quantity Take-Off and Construction Estimation

Key Learning Outcomes To understand the need for construction production simulation To analyse key benefits of production simulation To comprehend various types of 4D applications

Construction Co-ordination Problems AreaCo-ordination Problems Design No direct cost feedback on design decisions Coordination of trades Sub-Contractor Cost Missing / Incorrect Design Information Inability to reuse data for shop drawings Field rework required for prefabricated components Padding to compensate for risks Poor subcontractor work flow – “Starts and Stops” Inadequate quantity information for planning Lack of owner trust – difficulties in communicating cost and schedule issues Production control is based on subjective information Frequent starts and stops Estimating is time-consuming and occasionally inaccurate Construction Insufficient as-built project documentation Renovation, addition and demolition planning is time-consuming Facility Management Insufficient as-built project documentation Renovation, addition and demolition planning is time-consuming

Using BIM for 4D Production Simulation Created by linking 3D BIM with Project Timeline Used to display both temporary and permanent components Referred to as product- process models

KEY ADVANTAGES OF PRODUCTION SIMULATION

Integration of Production and Process Model

Using 4D for Macro and Micro Level Communication Using 4D at a Macro Level – Site Logistics – Staging Areas – Access routes and disruptions Using 4D at a Micro Level – Defining Construction Sequence – Identification of space-time conflicts

CPM Scheduling A work breakdown structure, showing a complete list of all activities required to complete a project; Time duration for each project activity; Dependency between project activities; and The time (duration) that each activity will take to completion.

Line of Balance (LOB) Uses Location as basis for Scheduling Ideally suited for activities involving repeated block of activities (e.g. high rise construction or road works) X-axis represents the timeline of the project, whereas the Y-axis identifies the work areas that identify a project.

Limitations of Traditional Scheduling

BIM Application Scenario

Traditional Practice - Scenario

BIM Cost Estimation – Application Scenario

References and Learning Resources Middlebrooks, R.E. (2008). Sustainable Design Through BIM and Analysis. Heating / Piping / Air Conditioning Engineering, 80(10), Retik, A. (1993). "Visualization for decision making in construction planning." Visualization and intelligent design in engineering and architecture, J.J. Connor, et al., eds., Elsevier Science(New York, NY), Seliga, C. (2007). “Revel Selects Synchro for $2 Billion Atlantic City Casino Project.” Prime Newswire June-2007, Coventry, England Sriprasert, E and Dawood, N. (2002), "Requirements identification for 4D constraint-based construction planning and control system", Conference Proceedings – Distributing Knowledge in Building, University of Teeside, Middlesbrough.

Related Websites /examples.shtml /examples.shtml Cb40&feature=related (Case Study – IntelliBuild) Cb40&feature=related