1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.

Slides:



Advertisements
Similar presentations
Rock Creek Sewer Separation & Water Main Replacement – CSO 031, 037, 053 and 058 Presented to CWEA / WWOA / CSAWWA 2011 Tri-Association Conference Collections.
Advertisements

District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing On: Anacostia River Tunnel Briefing For: ANC 6B October 26,
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Onondaga County CSO Abatement Gray Project Update.
Connecticut Department of Energy and Environmental Protection.
THE DISTRICT’S ANACOSTIA RIVER TRASH TMDL IMPLEMENTATION STRATEGY
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
Lower Mill Creek Partial Remedy Phase 1 - EHRT RFQ Pre-submittal Meeting May 12, 2010.
Truro DG5 Scheme April Integrated Urban Drainage Schemes Proposed Hendra Road surface water separation Kenwyn Street Proposed Redannick Lane surface.
Clean Water Project.  Completion of the south conveyance tunnel (SCT) is important to meet the requirements of a CT DEP Combined Sewer Overflow (CSO)
Water is Life: Upgrading Our Infrastructure to Serve You Better.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Pollution Risk to Watersheds in Loudoun County GIS 200 May 11, 2009.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
1 MPT – 95% designed CHP – design in progress FDF – design completed Coordination  Utilities  Cranes  Geotechnical Information  Weekly meetings – Internal.
Storm Water Retrofitting Dan Bogoevski, Ohio EPA September 2011.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Spokane River Forum 23 May 2011
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Update on the District of Columbia’s Watershed Implementation Plan (WIP) for the Chesapeake Bay Total Maximum Daily Load (TMDL) November 18, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
CMMA 2010 Owners Session George Robinson II, M.B.A., C.B.A. Commissioner.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Updated Estimates of Impervious Area, Equivalent Residential Units, IA Rate, and Customer Bill Impacts AOBA October 27, 2008.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
A Design-Build Success Story Dick Sprague HDR, Inc. Landfill Gas Migration Control.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
1 Briefing for IMA Participants on Results of Flow Studies October 31, 2006 District of Columbia Water and Sewer Authority.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager June 28, 2012 Blue Plains Regional Committee Briefing for: Cost Allocation.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
OC Animal Care Services Design-Build RFQ Conference October 27, 2015.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Sanitary Sewer Overflow (SSO) Consent Decree Update Commissioner Meeting May 18,
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Stage 2 Light Rail Transit Program “In the ground ready”
Presented by Tom Heinemann, CH2MHILL October 2, 2013
Update on PI Modeling and Nitrogen Removal at Blue Plains
Sewer System Presentation
MSD’s Second Annual “Can You Dig It?”
Manchester’s CSO Program: A Look Behind and a Look Ahead
LTCP and TN Cost Allocation
Ferguson Slide Permanent Restoration Project
Bureau of engineering City of Los Angeles.
Natural Environment: 0% Impervious Surface Built Environment:
Facilities Plan Update
Fire Emissions Joint Forum
Metropolitan Tunnel Redundancy Program Update
Sacramento Environmental Commission January 2019.
Presentation transcript:

1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving St Piney Branch Stream Piney Branch CSO Controls Current and Proposed Plan for Rock Creek N Piney Branch Drainage Area N $60 M of Green Infrastructure in Piney Branch

Potomac Tunnel I Key Br. Lincoln Memorial Kennedy Center Potomac Tunnel I-66 Key Br. Lincoln Memorial Kennedy Center Add 75 mgd to wet weather treatment system at Blue Plains Current Plan Proposed Plan Current and Proposed Plan for Potomac River NN $30 M of Green Infrastructure for CSO 027, 028, 029 $10 M to separate CSO 025, 026

3 Clean Rivers Project in Planning Stage  Piney Branch Early Action Green Infrastructure Project Install Green infrastructure practices to mitigate CSO overflow to Rock Creek Design-Build delivery method Draft RFQ to be developed July 2014 Estimated contract value: $3 million Issue RFP end of 2014 Construction period: June 2015 – 2016

4 DC Water’s Green Infrastructure Challenge  Seven design award winners selected  Award winners announced January 2014  RFQ/RFP for final design/construction will be issued in Third Quarter of 2014 for construction  Construction of award winning projects will start in 2015 For more information, download the Green Infrastructure Challenge Briefing Document:

5 Green Infrastructure: Potomac (Cumulative) Rock Creek (Cumulative) Spend $10 M by 2019Spend $3 M by 2016 Spend $20 M by 2023Spend $15 M by 2019 Spend $30 M by 2028Spend $30 M by 2024 Spend $40 M by 2032Spend $45 M by 2027 Spend $60 M by 2032 Total: $40 millionTotal: $60 million Gray Infrastructure:  Place hybrid Potomac Tunnel in operation by 2030 Proposed Consent Decree Amendments and Schedule for Green Infrastructure

6 Important Dates DesignConstruction RFPNTPCompletion Design- Build Nov  23-foot diameter tunnel, 70 to 180 feet deep, 28,600 feet long  5 shafts and 5 diversion structures  Estimated construction value: $500 – $600 million  Delivery method: Design-Build on an accelerated schedule NE Boundary Tunnel Alignment

7 Construction Staging Areas Typical Diversion Facility

8 Construction Staging Areas Mount Olivet Road (.73-acre staging area)

9  Clean Rivers Program: Northeast Boundary Tunnel – late 2015 procurement for Design-Build and construction management Green Infrastructure – start work mid-2015 Upcoming Design, Design-Build, and Construction Management