4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Great Western Corridor Feasibility Study
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Santa Maria River Bridges Widening. Project Location.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Section 106 Clearance Application Missouri Local Programs How to Complete the Application for Section 106 Clearance.
Environmental Assessment Public Meeting
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
May 7 th, Purpose and Scope of Project Project History Project Elements Next Steps.
Golden Triangle Blvd. Progress Report March 27, 2007.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.
Dave Kuhn Assistant Commissioner
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Issaquah-Fall City Road
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Walker Street Reconstruction Project 25% Design Public Hearing
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
National Organization of Minority Engineers Leadership Summit
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview

Project Team  Colorado Department of Transportation  FHWA  Design Consultants –FIGG Project Management & Bridge Engineering –PBS&J Civil, Roadway, Traffic, Utilities, Environmental –Ayres Associates Hydraulics & Drainage –Goodson/MWWA Geotechnical, Geology –The Szynskie Group Lighting & Electrical Design –EDAW Urban Design & Landscape Architecture –Abel Engineering Survey & ROW Support

Project History  Replacement of existing bridge K-18-Z –Structurally Deficient, Functionally Obsolete  Statewide Transportation Plan – 1996  Consultant Services  Conceptual Design – 2001/2002  Preliminary Design 2003  Environmental Clearance – 2003 thru 2005  Final Design – 2006

Project Timeline  90% Plans October 18, 2006  PS&E December 18, 2006  Advertisement March 2007  Contract Award May- June 2007  Construction (3-4 years)

Project Description

Project Aerial Map River RR Yard Mall Loop Ramp Rd Floodwall Bluff To I-25

Site Photo

Project Description Study Corridor Elizabeth St. to Abriendo Ave. Construction Limits Midtown Circle to Corona Ave.

Bluff Arkansas River Trail Fishing Pier Kayak Course Site Description – West End

Site Description – East End Railroad Facilities Midtown Mall Commercial Downtown Pueblo

Existing Bridge Conditions  Undesirable Roadway Geometry  Insufficient Safety Clearances  Substandard Load Carrying Capacity  Structurally Deficient  Functionally Obsolete  Insufficient Pedestrian/Bicycle Facilities

Existing Bridge Conditions Narrow Lanes, Shoulders, Sidewalks

Project Considerations  Railroad Coordination  City Coordination  Utilities  Phasing / Maintenance of Traffic  Arkansas River & Recreation Area  Access to Midtown Mall  Construction Access and Staging Areas  Environmental Compliance

Proposed Roadway Section 4-Lane Build / 6-Lane Future Capacity

Proposed Structure & Alignment

Proposed Alignment North Alignment - Aerial

Proposed Structure Information  Twin Structures 6-ft Separation  Average Length: 1,137 feet  5 Spans (151’, 235’, 378’, 228’, 145’)  Clear Spans: –Arkansas River & Levee –River Trail –UPRR & BNSF Yards (w/ pier between) –Loop Ramp Road

Proposed Bridge (from Bluff)