Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway.

Slides:



Advertisements
Similar presentations
Terje Andersen 06 May 2011 Analysis of past derailments Information from data bases, investigation reports and surveys.
Advertisements

Gavin Astin/ Terje Andersen 06 May 2011 Survey of Existing measures.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
Traction Control of Electric Locomotives
CE 515 Railroad Engineering
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
UNIT III GEOMETRIC DESIGN OF TRACKS
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Cost sharing models of NGN rollout in rural or remote areas BEREC-EaPeReg-REGULATEL-EMERG Summit Barcelona, 2-3 July 2015.
Rail Related Research at IIT Madras
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
Course of MT- 362 Material Handling Lecture # 8.
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
Transport support in foreign economic activity
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
INTRODUCTION OF HIGHER AXLE LOADS ON INDIAN RAILWAYS
Lecture Six Radu ANDREI, PhD, P.E., Professor of Civil Engineering
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
TeNeT Group1IRSTE Seminar Information and Communication Technology (ICT) and Indian Railways Ashok Jhunjhunwala, TeNeT group, IIT Madras
An independent view of the transport issues Malcolm Buchanan Colin Buchanan and Partners.
TEST TRACK FOR INDIAN RAILWAYS
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
LCC and RAMS Based Track Work Technology for the Economical Benefit of High Speed Railways Girsch 1 Milano November 8, 2005 Presented by: Heinz OSSBERGER.
INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. Introduction of high speed corridors on IR– impact & challenges before us.
1 Prospective research of VNIIZhT in field of freight traffic Prof. А.Е. Semechkin GRFC2007, New Delhi, March 2007.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Dedicated Freight Corridor By CHAHATEY RAM CBE/ER.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Indonesian Timetabling Conference Introducing Timetabling and Train Control where there a Multiple Operators 31 May 2011.
URBAN DEVELOPMENT PLANNING
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
MAGLEV TRAINS Branch – EXTC 2 Semester – 2 Batch Group 2 Communication Skills.
STANDARD MOVING & FIXED DIMENSIONS FOR DEDICATED FREIGHT CORRIDOR.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
CHAPTER 17 RAIL PASSENGER SERVICES IN U.S..
Detector Derailment Device (&) Frenado (Braking) Automatic Train
Summary and Wrap-up Discussion 8 July 2015
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
UPGRADATION PLANNING OF RURAL ROADS IN G.I.S. ENVIRONMENT UNDER PMGSY.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
CE2303 Railway Engineering
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
TRANSPORTATION ENGINEERING - II. UNIT MARKS QUESTION 1.What are the type of rails tried so far in construction of railway track? 2.Define guage.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
HIGH SPEED RAIL ASSESSMENT NORGE
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
POWER SUPPLY IN A/C COACHES The power supply technology used in train interiors have indirect coupling with axle. This makes system lesser efficient and.
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
1 Address: UIC Safety Database (SDB) System and Results.
CE2303 Railway Engineering
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Reactive to Proactive Approach to Track Maintenance on Indian Railways
Today´s Challenges of the Rail Infrastructure Industry
Simulation of mixed traffic on a railway section
SAI SUJAN PIRIYA 3RD YEAR CIVIL ENGINEERING GRIET-HYDERABAD
Resistance and Tractive Effort
Sustainable maintenance of high-speed lines with mixed traffic
Public Conference December
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Metro Railway How it began
PRESENTATION ON- CARRIAGE AND WAGON SHOP
(Additional materials)
UIC 518.
RAILWAY BRIDGE TUNNELS
RAILWAYS, BRIDGES & TUNNELS
Presentation transcript:

Track for High Speed Trains on IR Challenges Ahead –An Overview Onkar Singh CE/Co-ord/N.E.Railway

1.Necessity of High Speed Trains in India. Challenges Ahead Overview Indian Railway is life line of our nation. In a developing country like India where rapid growth of economy, socio-technological advancement and multinational competitive atmosphere are taking place, IR also needs to develop its network and quality of service and that to in a competitive atmosphere. Quality is directly linked with the quality of service to the customer in terms of physical comfort and time saving.

2. Scope of High Speed Track in India. Identification of corridors for high speeds. Challenges Ahead Overview One can very well foresee early requirement of high speed trains in India. In fact on certain segments on IR like Mumbai-Ahemdabad, Mumbai- Pune, Delhi-Ludhiana- Amritsar, Delhi-Agra-Gwalior, Delhi-Jaipur, one has to think seriously for developing high speed rail services in phases in near future.

3. Standardization of track structure, bridges and other infrastructures of engineering Department in commensurate with the development of rolling stock and signaling equipments etc. suiting to Indian conditions. Challenges Ahead Overview High speed rail services are already running in many countries of the world for both freight & passengers. On most of the system high speed rail corridors are laid separately as per socio-economic need and viability. Since, there is vast existing railway network in IR, separate corridor may not be economical and so existing lines on selective basis may be developed for high speed as a interim measure.

4. Adversities of running mix traffic and other usual conflicting situations in operation to be considered in maintenance of track effectively. Challenges Ahead Overview Considering adversities by running mix traffic and other conventional wagons without much control on overloading and other such conflicting situations maintenance of such track, model of mixed traffic has to be studied in detail by RDSO. For future, IR should plan separate corridors for high speed trains connecting big cities with high rate of economical growth.

5. System of clearance of proposals of high speed routes from Railway Safety Commission - need for administrative and technical decisions. Challenges Ahead Overview In view of the above, policy decisions- both administrative as well as technical nature regarding standards of infrastructure like track, bridges, level crossings, fencing, grade separation, maintenance system, organizational setup for day to day as well as periodical maintenance units to be given proper thinking. Standardization of rolling stock, signaling and other installations has to be done judiciously. Present system of clearance from the Railway Safety Commission is also to be suitably updated after thorough experimentation and rail wheel interaction related studies for such rolling stocks and track.

6. Minimum Track Structure- Present track structure being adopted for high density route on Indian Railway may be tried for high speed trains. Challenges Ahead Overview As studies conclusively indicated that it is not necessary to have heavy track structure involving heavy cost for high speed trains but the track has to be maintained to high standard. The improved maintenance of PSC track by effective use of track machines and imparting training to P.Way staff appears to be one of the vital requirements of such high speed routes.

7. Maintenance of Track to high standards to safety as well as riding comfort to users. Challenges Ahead Overview Corrective or smoothening system of maintenance of track is not sufficient to achieve the desired riding quality and thus complete switch over to Absolute Track Geometry System of maintenance would be essential to achieve the desired level of comfort at high speeds.

8. Upgradation of Track machines on Indian Railway for high speed track. Challenges Ahead Overview As we know, at higher speeds faults in Track geometry with larger wave length also cause considerable dynamic force and therefore must be eliminated. Wavelength of 100m & 200m fault must be considered at speed of 160 Kmph and 350 Kmph respectively. Hence, change in maintenance strategy from smoothing mode to absolute track geometry is essential and track machines upgraded accordingly.

9. Threat to human life from high speed Trains during Routine Inspections and maintenance. Challenges Ahead Overview Push Trolley Inspection by field officials should be debarred at least in two block sections ahead in the face of high speed trains and suitable automatic warning system to be devised for alarming the people working on track well before. Alternatively a time slot for all type of routine maintenances and inspections may be provided.

10. Relaxation to limits of maximum cant, cant deficiency and cant excess. Improvements to turnouts is also to be considered. Challenges Ahead Overview Running of trains on curves with high speed will enhance the need of cant quadratically and therefore achieving a revised and balanced limits of the maximum cant, cant deficiency and cant excess for running of high speed trains with present mixed speed train operation system is a vital and important area of concern. Improvements in turnouts will also be an area of concern.

11. Speed limit on curves sharper than one degree. Challenges Ahead Overview Speed limit on one degree curve with existing norms of maximum cant and cant deficiency comes to 180 kmph. Therefore, an obstacle in the way of high speed trains is the population of curves of more than one degree frequently existing on almost all routes of Indian Railways. Solution to the problem may be adoption of tilting coach technology in our system.

12. Inadequate transition length for high speed trains. Challenges Ahead Overview It is well known that with increase of speed, the minimum required length of transition curve increases linearly and thus accommodating the increased transition length will compel the track to be realigned involving shifting of curves etc. depending upon the site conditions.

13. Over aged bridges –their capability to withstand dynamic impact of high speed trains & Eco friendly measures. Challenges Ahead Overview Dynamically augmented axle load of high speed trains may cause failure, Checking of some sort of samples from existing bridges and threat of it if some of the bridges fails is required to be studied. It will provide a foresight for planning the future of high speed trains. Eco friendly measures for reducing noise, dust level and vibration to nearby residents to be taken.

14. Bridge Sleepers- Stability check against dragging and other forces on high speed movement of traffic. Challenges Ahead Overview Present mechanism of holding down of bridge sleepers with girders with the help of hook bolts may defeat the purpose on high speed. A dynamic studies to check stability of bridge sleepers on running of high speed trains may be conducted by RDSO and suitable mechanism for it may be devised. Steel Channel sleepers may, however be a better option.

15. Revision of Schedule of Dimensions and Requirement of Extra Clearances on High speed routes. Challenges Ahead Overview For running of high speed trains, requirement of super elevation will go on increase. As super elevation causes the lean of rolling stocks on inner side of curves which magnifies the horizontal clearance of track from fixed / temporary structures, revision of SOD or correction to some of its provisions will be required suiting to the rolling stock for such speeds.