1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.

Slides:



Advertisements
Similar presentations
LIMITED APPROACH BOUNDARY
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Laser Awareness (Non-User). 2 What is a laser? Laser is an acronym for Light Amplification by Stimulated Emission of Radiation.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Industrial Radiography
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Gauges and well logging
Control of Hazardous Energy – Lockout/Tagout 29 CFR
1 BROOKHAVEN SCIENCE ASSOCIATES The Path to Accelerator Commissioning F. Willeke Accelerator Systems Director NSLS-II PAC Meeting December 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ESRF PSG safety for equipment and personal related to power converters 2 nd POCPA 15th of June 2010 Jean-François Bouteille.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Accelerator Support and Maintenance Startup for Run 13.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Lessons Learned from NSLS-II Linac Commissioning Ray Fliller and Emil Zitvogel Linac Manager and Beam Operations Group.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Operation Status of the RF Systems and Taiwan Photon Source
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Cost Optimization Models for SRF Linacs
WANG chuanzhen PENG wei XIAO min LI Chunsong (SQHL)
Shielding Design for LCLS Injector Operation – Phase one
Industrial Radiography
Review of the Machine Protection System in the PS complex
ELENA installation and commissioning status
BE-ICS activities for LIU Project
Radiation protection of Linac4 M. Silari Radiation Protection Group
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Andreas Jansson, Lali Tchelidze
Operations Section Leader
Maximum Credible Beam Event Paul Emma et al
T-489: Induced Activity and Residual Dose Rates
Operation of Target Safety System (TSS)
UITF Conduct of Operations Review
Radiation fields During 1st stage beam commissioning
Review of hardware commissioning
Phenotyping Facility X-ray Awareness Training
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey

2 BROOKHAVEN SCIENCE ASSOCIATES Injection Building Local Control Room Linac Tunnel Klystron Gallery Equipment Racks for Linac and LTB line Booster (only arc 1 installed)

3 BROOKHAVEN SCIENCE ASSOCIATES Closeup of Linac and Booster Tunnel Beam Dump 1 Equipment not installed here LB-B1 dipole LB-B2 LOTO Safety shutter LOTO Penetration fulled with lead 100 MeV beam bent too far. 1.7 R/h in localized spot on the booster wall MON Interlocked monitors did not see levels large enough to alarm or trip Monitors alarmed locally Beam Dump 2 Controlled Area

4 BROOKHAVEN SCIENCE ASSOCIATES Statement of the event While operating at 100 MeV, the power supply for the D1 bending magnet was inadvertently ramped to full power, bending the electron beam beyond the extent of the shadow shield and permitting the beam to strike the linac side wall. No radiation exposure to personnel resulted from this event. The area affected by the increased radiation levels was posted as a controlled area with radiation monitors providing local alarms.

5 BROOKHAVEN SCIENCE ASSOCIATES

6 Zoom in to the shielding Beam direction

7 BROOKHAVEN SCIENCE ASSOCIATES As seen from the top of the dipole This was the existing shield Beam went this way This is the upgraded shield

8 BROOKHAVEN SCIENCE ASSOCIATES Events of 5/29/12 Operator tuning machine with 100 MeV beam energy at 15 nC/s current while commissioning “beam loading compensation” in the linac. Legitimate but uncommon method of commissioning this mode of operation. While steering the beam to beam dump 2, a typographical error caused the dipole to ramp up to its maximum current. This combination caused the beam to bend 4 times more than designed Beam misses downstream shield wall and created radiation levels in tunnel which caused local alarms

9 BROOKHAVEN SCIENCE ASSOCIATES Events (cont.) Two electrical workers inside the tunnel but outside of the controlled area heard local alarms and went to the control room. GERT trained, wearing TLD, did not go through the controlled area. Operators responded according to procedure and informed RCD personnel. While RCD en route, operators tried to diagnose the alarm. Told workers to remain out of the tunnel. RCD verified the high alarm levels. Immediate investigation showed no dose at location of workers. RCD instructed operators to terminate the beam. Operators terminate the beam and shut off the linac until further approval. Total time ~ 45 – 50 minutes.

10 BROOKHAVEN SCIENCE ASSOCIATES Subsequent Events LCC and ESH immediately advised. It was decided to reproduce the scenario after work and obtain a more comprehensive radiation survey. With the power supply at full power, and the electron beam at 100 MeV and 15 nC/s, levels as high as 1.7 R/h in contact with wall were measured. Multibunch operation was immediately suspended until corrective actions taken.

11 BROOKHAVEN SCIENCE ASSOCIATES Area Monitor

12 BROOKHAVEN SCIENCE ASSOCIATES Radiation Levels and Dipole Current During Event

13 BROOKHAVEN SCIENCE ASSOCIATES Supplemental Shield Design Assumptions Supplemental shield was designed to prevent levels > greater than 5 mr/h in the Booster tunnel from a miss- steered 22 nC/s electron beam at 230 MeV striking the lead shield. It was not designed to intercept a 100 MeV beam when the dipole was powered to full current.