990901EIS_RR_Instru.1 The Instrument: US Subsystems and Requirements Dr. Clarence M. Korendyke US Project Scientist Naval Research Laboratory 202-767-3144.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Spectral Imaging of the Coronal Environment (SPICE) Caitlyn Quinn Summer 2010 Gregory Woytko, 547 Caitlyn Quinn Summer 2010 Gregory Woytko, 547.
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
990901EIS_Opt.1 The Instrument: Optical Design Dr. John T. Mariska Data Coordination Scientist Naval Research Laboratory
Target Status Report Lara Howlett University of Sheffield.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
990901EIS_RR_Science.1 Science Investigation Goals and Instrument Requirements Dr. George A. Doschek EIS US Principal Investigator Naval Research Laboratory.
Oct 17, 2001SALT PFIS PDR - Structure1 Structure Interface/ constraints Loads Structure design rationale Truss Weight and CG Finite Element Analysis/ Image.
ILC Rotating Target - Active Sliding Contact Cooling Wei Gai, Manoel Conde, Wanming Liu, Scott Doran, Vic Guarino, George Fenske (ES), Robert Erck (ES),
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Solar orbiter_______________________________________________.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
990901EIS_RR_HV.1 Heritage and Validation Approach Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Failure Modes, Effects and Criticality Analysis
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Camera PDR/CD1 Planning 19 September 2008
Rose Navarro HMI Lead Thermal Engineer
Telescope - Mechanical
Gayle K. Martin November 14, 2016
Solar-B Science Working Group
IR Detector - Test cryostat : Machining
Peer Review Agenda (Suggested).
Planetary Protection at ESA
Image Stabilization System (ISS)
Intra-pixel Sensitivity Testing Preliminary Design Review
BRIAN KLATT MISSION ASSURANCE MANAGER
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
GLAST Large Area Telescope
GLAST Large Area Telescope
Optics Alan Title, HMI-LMSAL Lead,
Instrument Overview Larry Springer HMI Program Manager
DOE Review of the LCLS Project October 2006
Presentation transcript:

990901EIS_RR_Instru.1 The Instrument: US Subsystems and Requirements Dr. Clarence M. Korendyke US Project Scientist Naval Research Laboratory Dr. Charles M. Brown EIS US Instrument Scientist Naval Research Laboratory

990901EIS_RR_Instru.2 Plan View Elevation EIS Optical-Mechanical Layout

990901EIS_RR_Instru.3 MIR/SLA/GRA Electrical Interfaces

990901EIS_RR_Instru.4 Lifecycle Requirements

990901EIS_RR_Instru.5 Articulated Telescope Mirror (MIR) Requirements Mount the Optic With Minimal Distortion Over the Applicable Temperature Range Tilt the Optic to Move the Solar Image (±4’) Perpendicular to the Slit Sense the Relative Position of the Optic Tilt With <1 Arcsec Accuracy Translate the Optic ±8 mm Perpendicular to the Optical Axis Sense the Position of the Optic to <20 Microns

990901EIS_RR_Instru.6 MIR Hardware Description/Summary PZT Mirror Linear Ball Slide Flexpivot Translation Motor and Drive Assy

990901EIS_RR_Instru.7 Focussing Grating (GRA) Requirements The GRA Shall Mount the Grating With Minimal Distortion Over the Operational Temperature Range The GRA Shall Provide a Focussing Capability of ±1 cm to Permit Adjustment of the Spectrometer Focus The EIS Grating Will Be Bonded Into a Cell Mounted Onto a Crossed Roller Slide Translation Stage Translation Stage Will Be Driven With a Geared Stepper Motor and Ball Screw Combination. The Mechanism Will Be Operated in Open Loop Mode. The Position Will Be Sensed With Optical Encoders

990901EIS_RR_Instru.8 GRA Hardware Description/Summary Grating Motor and Ball Screw Assy Crossed Roller Bearing Slide

990901EIS_RR_Instru.9 Slit Assembly (SLA) Requirements The SLA Shall Support the Shutter Assembly The SLA Shall Be Able to Position the Spectrometer Slits and Slots to Be Reproducible in the Telescope Focal Plane The Spectrometer Slits Shall Be Reproducibly Positioned to <2 Microns Perpendicular to the Optical Axis and <26 Microns Along the Optical Axis. A Performance Goal for the Mechanism Will Be <1 and <13 Microns, Respectively Positioning Will Be Accomplished Using a Geared Stepper Motor With the Direction of Motion Along the Optical Axis

990901EIS_RR_Instru.10 Slit Assembly (SLA) Requirements (Continued) The Load Position Will Be Sensed Utilizing a Shaft Resolver The Present Optical Design Does Not Permit the Resolver to Be Directly Attached to the End of the Shaft, and the Resolver Is Instead Coupled to the Output Shaft With Anti-backlash Gearing; This Approach Should Suffice to Meet Specified Goals. The Backlash Inherent in the System Is Expected to Be ±3 Arcminutes With a ±15 Arcminute Step Size. This Corresponds to an Uncertainty of ±10 Microns in the Position of the Slit Along the Optical Axis With a 50 Micron Step Size The Resolver Will Have an Absolute Accuracy of <15 Arcminutes Sufficient to Discriminate Between Individual Steps

990901EIS_RR_Instru.11 SLA Hardware Description/Summary Shutter Slit Paddle Wheel Slit Motor and Encoder Shutter Motor and Encoder

990901EIS_RR_Instru.12 Shutter Mechanism Requirements The SLA Shall Include the EIS Instrument Shutter The Shutter Shall Be Able to Take a 50 ms Exposure <5% Photometric Error Over the Slit for These Short Exposures

990901EIS_RR_Instru.13 Shutter Assembly Hardware Description/Summary

990901EIS_RR_Instru.14 Requirements for the Filter Clamshell Vacuum Tight Enclosure P <1 Torr for Launch [TBD] 140 dB Acoustic Loads Expected Hold Time >1 Week [TBD] Reliable Calibrated Internal Pressure Sensor Clean Minimal Central Obstruction Pumpout/Backfill Valve With Filter and Throttle No Pressure Differential Allowed Front/Back (Air Passages) Sunshade for Filter Frame No Shock on Opening Vacuum Harness for Pre-Launch Ops

990901EIS_RR_Instru.15 Front Filter Assembly (FFA) Requirements A FFA Shall Be Provided to Block Heat and Visible Light From the EIS Instrument The FFA Shall Also Serve As a Bandpass Filter for the EUV Range of Interest The Filter Will Consist of a 1500 Å Thick Aluminum Film Mounted on a Nickel Mesh. The Aluminum May Be Coated With a Few Å of Carbon to Reduce Oxidation and to Improve Rejection of Light in Unwanted Solar Lines The FFA Will Provide a ±1% Transmittance Uniformity The FFA Shall Be Compatible With Ultra High Vacuum (UHV), and It Shall Provide the Necessary Mechanical Strength, and the Capability to Withstand Torr-Level Pressure Differentials

990901EIS_RR_Instru.16 Front Filter Assembly (FFA) Requirements (Continued) The Front Filter Will Be a ~200 mm Clear Aperture Diameter and It Will Be Segmented Into Four Quadrants, Each Separately Replaceable A Lightweight Aluminum Frame Shall Support the Mesh A Clamping Frame Shall Secure the Filters to the Clamshell Assembly. The Frames Will Be Designed to Minimize the Central Obstruction

990901EIS_RR_Instru.17 Requirements for the Al Filters For the Entrance Filter: – 80% Open) –  <0.1 –T 304 Å –T <5 X for Visible & IR –20 cm Clear Aperture, in Quadrants For the Spectrometer Entrance Filter: – 80% Open) –T 304 Å –T < 5 X for Visible & IR –0.5 cm X 1.5 cm Rectangular

990901EIS_RR_Instru.18 FFA Hardware Description/Summary Quadrant of Trace Entrance Filter

990901EIS_RR_Instru.19 Spectrometer Entrance Filter (SEF) Requirements A Small Diameter Aluminum Filter Shall Be Provided to Mount Behind the EIS Spectrometer Slit The SEF Shall Provide Additional Reduction of the Visible Light Within the Spectrometer, Especially in the Event That the FFA Degrades Due to Orbital Debris and Micrometeorites The SEF Shall Have a Clear Aperture of ~20 mm. It Shall Be Placed Near the Slit, but Far Enough Away (>8 mm) That the Mesh Will Be Totally Out of Focus at the Detector Table 3-6 of the EIS Subsystems and Components Contract End Item Specification, EIS_Comp_Spec, Lists the Required Filter Properties

990901EIS_RR_Instru.20 SEF Hardware Description/Summary Luxel TF Aerospace Al filter

990901EIS_RR_Instru.21 EIS Instrument Classification Mission Classification Recommended Guidelines for EIS Instrument Components

990901EIS_RR_Instru.22 Mission Analysis Approach Tailored to Meet Guidelines of EIS Instrument Component Contract End Item (CEI) Specification Recommended Approach for EIS Instrument Components Independent Agent

990901EIS_RR_Instru.23 Safety, Reliability, and Quality Assurance (SR&QA) Requirements SR&QA and Verification Compliance Matrix (VCM) Requirements Defined in EIS Instrument Component CEI Specification (EIS_comp_spec) Configuration Management Plan uses MSFC MPG Guidelines for Flight Models (DRD 874CM-001) Contamination Control & Implementation Plan in Consonance with UK’s EIS Instrument Requirements (DRD 872MP-001) Product Assurance Program for Flight Models Meets ISO 9000 Guidelines (DRD 872QE-001) –Includes Preliminary/Final Hazard Analysis Inputs to UK’s EIS Instrument Safety Plan –Includes Reliability Assurance and Parts/Materials/Processes Approach Verification Plan Defines Verification Approach, Structure, and Description (DRD 872VR-001)

990901EIS_RR_Instru.24 Other Factors Parts, Materials, and Processes (PMP) Selected to Assure Maximum Reliability and Performance in Space Environments –Vacuum Stability via Total Mass Loss (TML) of >1.0% and Volatile Condensable Material (VCM) of >0.1% Per NRP-1124 –Traceability Achieved by Categorizing EEE Parts Into Sets Groups and Tracing Parts Through Fabrication, Assembly, Test, and Delivery Electrostatic Discharge (ESD) Control According to Processes Implementing MIL-STD-1686 Guidelines Closed-Loop Failure Reporting and Corrective Action System (FRACAS) for Failures Occurring During the Flight Model Acceptance Testing Phases Deliverable Shipping Container Compatible With the Anticipated Transportation Environmentals Documentation Uses Established Practices for Spaceflight Equipment –Deliverable “As-built” Engineering Drawings for Flight Models –Schematics, Assembly Drawings, Parts Lists, Test Procedures/Reports, and Calibration Data

990901EIS_RR_Instru.25 Project Planning and Control (1 of 3) During Phase B, the Following Management Tools (Delivery Dates) Will Be Developed to Allow Adequate Definition of the Hardware, Services, Materials, Subcontracts and Other Services of the Project: –Configuration Management Plan (31 December 1999) –EIS Component Specification Contract End Item (Updates A/R; Under Configuration Management) –Preliminary Design Review Package (15 February 2000) –Interface Control Documents (15 February 2000) –Project Management Plan (31 December 1999) –Monthly Progress Reports (Monthly)

990901EIS_RR_Instru.26 Project Planning and Control (2 of 3) Phase B Management Tools Continued: –Financial Management Reports (Monthly) –Work Breakdown Structure and Dictionary (30 November 1999) –Risk Management Plan (31 December 1999) –Contamination Control and Implementation Plan (15 February 2000) –Product Assurance Plan (31 December 1999) –System Error Budget (15 February 2000) –Verification Plan (31 December 1999)

990901EIS_RR_Instru.27 Project Planning and Control (3 of 3) During Phase C/D, the Following Management Tools (Delivery Dates) Will Be Developed to Allow Adequate Definition of the Hardware, Services, Materials, Subcontracts and Other Services of the Project: –All Management Tools Developed Under Phase B Shall Be Updated As Necessary –Critical Design Review Package (15 February 2001) –Pre-Environmental Review Package (15 February 2002) –Flight Readiness Review Package (15 September 2002) –Verification Test Report (15 September 2002)

990901EIS_RR_Instru.28 Product Assurance EIS Instrument Component Product Assurance Guidelines Shall Be Defined in the Product Assurance Plan Submitted During Phase B The Product Assurance Plan Shall Address: –Safety: Implementation of Industrial and System Safety Throughout the Project Lifecycle –Quality: Implementation of All Elements of the Quality Assurance Program Throughout the Lifecycle of the Project –Reliability: Definition of the Procedures and Controls for Implementing the Programmatic Reliability and Maintainability Requirements

990901EIS_RR_Instru.29 EIS Instrument Component Work Breakdown Structure (WBS)

990901EIS_RR_Instru.30 EIS Instrument Component Schedule Summary PROJECT ELEMENTDELIVERY DATE Start of Phase B 1 November 1999 Proto-Models of MIR, GRA, FFA and SEFFebruary 2000 Preliminary Design ReviewMarch 2000 Start of Phase C/D 1 May 2000 Electrical Prototype ModelDecember 2000 Mechanical and Thermal Developmental ModelsApril 2001 Critical Design ReviewMarch 2001 Pre-Environmental ReviewMarch 2002 Flight Readiness ReviewSeptember 2002 Flight ModelsOctober 2002 LaunchAugust 2004