Supplier Switching in Electricity and Gas Markets Patricia de Suzzoni Chair of ERGEG Customer Focus Group.

Slides:



Advertisements
Similar presentations
Patricia de Suzzoni, Chair of ERGEG/CEER Customer Working Group Citizens Energy Forum, London, October 2010 Draft Guidelines of Good Practice on.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
EURELECTRIC WG Retail Markets Presentation for ERGEG Customer Focus Group Helsinki, 11 October 2005.
Airi Asperk Estonian Competition Authority Baltic Electricity Market Mini-Forum Jurmala Conclusion of the Monitoring WG 2 nd meeting.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
NordREG Nordic harmonized electricity market by 2015? Work done and what to do beyond 2014.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
André Piérard, ERGEG Project Leader on Complaints Citizens’ Energy Forum, London, September 2009 Draft advice on Customer Complaint Handling, Reporting.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Position on Market integrity framework and transparency Florence Forum 6 December 2012 Robert Gersdorf.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Christina Veigl-Guthann, Chair of ERGEG Customer Empowerment Task Force Citizens’ Energy Forum, London, September 2009 Definitions of vulnerable.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
First Citizens’ Energy Forum, London,28 October 2008 Smart metering and its benefits for consumers Roberto Malaman General Manager, AEEG - Italy.
Patricia de Suzzoni, Chair of ERGEG Customer Working Group Citizens’ Energy Forum, London, September 2009 Regulatory aspects of smart metering in.
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
1 Citizens' Energy Forum 2013 and Energy Retail in 2014 Jan Panek, Head of Unit ENER B3.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Article 5 of the Energy Services Directive Edward Green.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
Eurogas CONSUMER PROTECTION & SWITCHING IN THE DOMESTIC GAS MARKET ERGEG Customer Focus Group Workshop Helsinki 11 th October 2005.
Competition, consumers & affordable prices in liberalised energy markets J. Minor, European Commission, Director, Consumer Affairs IV World Forum on Energy.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
Marielle Liikanen, chair RMF TF Camilla Egginton – project leader Citizens’ Energy Forum, London, October 2010 Customer empowerment through retail.
INGAS RD INTERNATIONAL SYMPOSIUM ON NATURAL GAS NATURAL GAS USAGE IN EUROPE AND TURKEY AND PROGRESS IN THESE MARKETS 9-10 JUNE 2009 NATURAL GAS.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
ERGEG Customer Focus Group Karima Björk, Svensk Energi.
Energy Agency of the Republic of Serbia
Consumer Education and Information (Session Ib: Tools to empower consumers) Edin Zametica Advisor to SERC, Bosnia and Herzegovina Chair of the ECRB Customers.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
A new impetus for Europe's energy efficiency policy Paul Hodson Head of Unit DG Energy, European Commission 09/10/2012.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Johannes Mayer (E-Control), Chair ERGEG URB TF Karsten Bourwieg (Bundesnetzagentur), ERGEG URB TF Citizens’ Energy Forum, London, September 2009.
Implications of regulatory changes of the market model on the distribution business.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
The Distributor Viewpoint to Supplier Switching Geode ERGEG Customer Focus Group Workshop October 11, 2005, Helsinki Pekka Salomaa.
ERGEG Customers’ Focus Group Helsinki, October 2005 Chrissa Argyriou EUROPEAN COMMISSION DG Energy and Transport.
Frankfurt (Germany), 6-9 June 2011 PAATERO – SE – S6 – Paper 0485 Adopting a general regulatory approach on the European electricity market Noona Paatero.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
© International Road Transport Union (IRU) IRU Academy Seminar, Amsterdam, The NetherlandsPage 1 5 th International IRU Academy Seminar on Driver.
The Energy Consumer Code NEON, February Background 2020 Vision for Europe’s Energy Customers (November 2012) Energy Union Strategy ‘Delivering a.
MCCAA Conference Friday 14 th March 2014 New measures on the EU single market for telecoms Grace Attard, ACR, EESC Pauline Azzopardi, ACR.
Overview of Smart Metering initiatives in EU
Customer Focus Group Status Reports
Renewable energy support schemes in the Republic of Moldova
Empowering consumers in retail and wholesale markets
The 3rd package for the internal energy market
NordREG Nordic harmonized electricity market by 2015?
Transparency & Services
Outline Background: development of the Commission’s position
Presentation transcript:

Supplier Switching in Electricity and Gas Markets Patricia de Suzzoni Chair of ERGEG Customer Focus Group

2 First Citizens’ Energy Forum, London, 28 October 2008 Introduction In these times of rising prices, it is essential that customers can have confidence in the efficient operation of competitive electricity & gas markets It is regulators’ and market participants’ responsibility to bring the benefits of the market opening up to competition to customers… …by promoting choice, quality and value for customers but ERGEG’s assumption is that customers themselves have a leading role in stimulating competition by shopping around between suppliers, thus acting as a constraint for suppliers

3 First Citizens’ Energy Forum, London, 28 October 2008 Introduction ERGEG has released several documents to take action to empower customers: -A Customer Information Handbook (on pre-contractual information), and Best Practices Propositions on Customer Issues (2006) -A Status Review on Obstacles to Supplier Switching and Guidelines of Good Practice in the gas retail market (2007) and in the electricity retail market (2008)

4 First Citizens’ Energy Forum, London, 28 October 2008 Table of contents Three key issues: 1.Customer information 2.Processes 3.Retail market monitoring

5 First Citizens’ Energy Forum, London, 28 October Customer Information

6 First Citizens’ Energy Forum, London, 28 October Customer Information Obligation to inform customers about market liberalisation Obligation to give customers general information about market liberalisation is not so common in Europe

7 First Citizens’ Energy Forum, London, 28 October Customer Information In order for customers to make an informed choice: -prices need to be transparent and easily comparable -suppliers/DSOs should publish their prices in contracts, bills and promotional material -a price comparison system on the energy offers quoted by suppliers should be made available 4 MS1 MS4 MS9 MSGas 13 MS3 MS9 MS17 MSElectricity Privately owned Other public authority Regulator Who runs tariff calculator? Existence of tariff calculator

8 First Citizens’ Energy Forum, London, 28 October Customer Information Roles and responsibilities of DSO vs suppliers should be clear -for example, customers need to know that supply differs from network operation; that the quality of supply is not related to the supplier, but is the responsibility of the DSO; meaning that switching suppliers will not compromise “keeping the lights on” Obligations to inform about responsibilities of DSOs electricity

9 First Citizens’ Energy Forum, London, 28 October Customer Information Brands, names, graphic identities and commercial practices should not create confusion, or misrepresentation

10 First Citizens’ Energy Forum, London, 28 October Customer Information Knowledge of one’s actual consumption is necessary to be able to compare offers Third Internal Energy Market (IEM) legislative Package European Parliament (EP) & Council have agreed so far on European Commission (EC) proposal Annex A (h): customers shall have at their disposal their consumption data

11 First Citizens’ Energy Forum, London, 28 October Customer Information Legal provisions regarding information on actual consumption are in place in many Member States, but not all In the majority of Member States, the obligation requires this information to be supplied to customers once a year only MS where there is a legal minimum frequency (in electricity) to provide customers with information on their actual consumption 1 MS 14 MS1 MS Gas 1 MS4 MS1 MS14 MS1 MS Electricity OtherQuarterlyEvery six months Annually Every two yearsEvery three years

12 First Citizens’ Energy Forum, London, 28 October Customer Information Frequency of reporting to customers their actual consumption Third IEM legislative Package proposal – Annex A (i): -EP: quarterly + mention of mandatory roll-out of smart metering -Council: frequently enough to be enabled regulate their own consumption + mention that this information shall be given by using a sufficient time frame which takes account of the capability of customer’s metering equipment (…) and of the cost-efficiency of such measures -ERGEG proposal: option to be properly informed on a monthly basis + mention that after considering the costs and benefits for customers, a mandatory roll-out period may be foreseen by regulators for the necessary technological adjustments required for this services, with regulators setting minimum functional requirements for the metering system

13 First Citizens’ Energy Forum, London, 28 October Processes

14 First Citizens’ Energy Forum, London, 28 October Processes Customers might be deterred from switching suppliers if the process is not simple there should not be any unnecessary obstacles for switching from the customer’s point of view simplicity means customers should only enter into contact with the new supplier Countries mandating that customers have a single contact point when switching

15 First Citizens’ Energy Forum, London, 28 October Processes Supplier switch must be as quick as possible In the 16 countries studied in the 2008 electricity report Third IEM legislative Package proposal: -EP: two weeks -Council: no time constraint -ERGEG proposal: one month from the moment all required information is provided and the contract between the customer and the new supplier is entered into, to the actual date of switching Theoretical duration of switching process (Electricity)Typical duration of switching process (Electricity) 0-1 month1-2 months0-1 month1-2 months> 1 month 8 MS 6 MS7 MS3 MS

16 First Citizens’ Energy Forum, London, 28 October Processes Relationships between market participants can be eased and sped up through standardised data exchange procedures ERGEG advocates that all exchanges be based on a stable delivery point identification number

17 First Citizens’ Energy Forum, London, 28 October 2008 Data exchange Third IEM legislative Package proposal: -EP: NRAs shall establish harmonised (or standardised) data exchange procedures between participants -Council: Member States shall ensure that rules related to data exchange shall be subject to review by NRAs or other relevant national authorities -ERGEG proposal: NRAs shall establish standardised procedures on relationships between final customer and supplier or distributor, or metering system operator 2. Processes

18 First Citizens’ Energy Forum, London, 28 October Processes Once the switch is completed, it is of the utmost importance that customers’ accounts with their previous supplier are settled as soon as possible Is it compulsory for the former supplier to settle the customer account (last bill) within a certain period? Electricity: yes, in 10 MSGas: yes, in 7 MS the day of termination of the contract within a month within 3 months > 3 months unknown the day of termination of the contract within a month within 3 months unknown 1 MS4 MS2 MS1 MS2 MS1 MS4 MS1 MS

19 First Citizens’ Energy Forum, London, 28 October Processes Final account settlement following a supplier switch Third IEM legislative Package proposal – Annex A (j): -EP: no later than one month after informing the relevant supplier -Council: no later than three months following the last supply by this previous supplier -ERGEG proposal: no later than one month following the last supply by this previous supplier

20 First Citizens’ Energy Forum, London, 28 October Retail Market Monitoring

21 First Citizens’ Energy Forum, London, 28 October Retail market monitoring Supplier switching as a major indicator of market functioning Switching focused everyone’s attention as being an instrumental indicator of proper retail markets functioning -that’s why ERGEG has identified obstacles to supplier switching -and came up with Guidelines of Good Practice to help empower customers Currently, due to varying definitions and methodologies in use, comparisons of switching in different MS have proven to be inconclusive -A definition of switching must be agreed on for example: the change from one supplier to another by the customer making a deliberate choice. It therefore does not cover moving, re-negotiation, green-field construction, new connection, activation, deactivation, etc.

22 First Citizens’ Energy Forum, London, 28 October Retail market monitoring Beyond supplier switching – next steps ERGEG plans to work on indicators for retail market in 2009 Additional areas could serve to monitor retail market functioning, for example: -retail pricing -price transparency -customer complaints -customer satisfaction…

23 First Citizens’ Energy Forum, London, 28 October 2008 Thank you for your attention Where to find more about ERGEG?