CERN IT Department CH-1211 Genève 23 Switzerland www.cern.ch/i t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.

Slides:



Advertisements
Similar presentations
Which server is right for you? Get in Contact with us
Advertisements

CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Bill Wrobleski Director, Technology Infrastructure ITS Infrastructure Services.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
CERN IT Department CH-1211 Genève 23 Switzerland t Evolution of telecom services GTPA November 27 th 2014 IT Dept. CS group.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Business Continuity Overview Wayne Salter HEPiX April 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
October 23rd, 2009 Visit of CMS Computing Management at CC-IN2P3.
Software project management
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.
Cloud Computing Cloud Computing Class-1. Introduction to Cloud Computing In cloud computing, the word cloud (also phrased as "the cloud") is used as a.
For more notes and topics visit:
Revise Lecture Mergers and Acquisitions Three measure of corporate growth? Internal growth & External growth? Reasons firm’s seek to grow? 2.
MANIT WEB HOSTING SERVICES Presented by - Sandeep Jain & Devesh Lal CRISP, Bhopal.
The Web Problem The website as it stands now does not make use of the current available technology, support or security that allows two-way communication.
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
What If You Could… …Automatically protect and secure your company’s most critical business information?... …Get more done with less by enabling employees.
Cloud Models – Iaas, Paas, SaaS, Chapter- 7 Introduction of cloud computing.
4.1 Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 4 Chapter IT Infrastructure: Hardware and Software.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
CERN IT Department CH-1211 Genève 23 Switzerland t Experience with Windows Vista at CERN Rafal Otto Internet Services Group IT Department.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
Co-location Sites for Business Continuity and Disaster Recovery Peter Lesser (212) Peter Lesser (212) Kraft.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
SAM for Virtualizatio n Presenter Name. Virtualization: a key priority for business decision makers Technavio forecasts that the global virtualization.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status - 1 Tier0 Status Tony Cass LCG-LHCC Referees Meeting 18 th November 2008.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
STANFORD UNIVERSITY INFORMATION TECHNOLOGY SERVICES Research Data Centers- Stanford Phil Reese, Stanford University CSG Meeting, June.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
ALMA Archive Operations Impact on the ARC Facilities.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Update on Windows 7 at CERN & Remote Desktop.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
S.Jarp CERN openlab CERN openlab Total Cost of Ownership 11 November 2003 Sverre Jarp.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Nikhef/(SARA) tier-1 data center infrastructure
Phase II Purchasing LCG PEB January 6 th 2004 CERN.ch.
CERN IT Department CH-1211 Genève 23 Switzerland t 24x7 Service Support Tony Cass LCG GDB, 24 th November 2009.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
CERN IT Department CH-1211 Genève 23 Switzerland t Computer Virtualization from a network perspective Jose Carlos Luna Duran - IT/CS/CT.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
Energy Savings in CERN’s Main Data Centre
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
Windows Small Business Server 2003 R2 Powering Small Businesses.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CERN - IT Department CH-1211 Genève 23 Switzerland t Operating systems and Information Services OIS Proposed Drupal Service Definition IT-OIS.
CERN IT Department CH-1211 Genève 23 Switzerland t The Tape Service at CERN Vladimír Bahyl IT-FIO-TSI June 2009.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
Office 365 is cloud- based productivity, hosted by Microsoft. Business-class Gain large, 50GB mailboxes that can send messages up to 25MB in size,
6 Essential Questions To Ask Your Scheduling App Provider Chances are you’ve heard of the many benefits that come with a good scheduling app and you are.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS Section input to GLM For GLM attended by Director for Computing.
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
The All In One Hosted Solution
CERN Mobile network migration
CERN Data Centre ‘Building 513 on the Meyrin Site’
Background B513 built in early 1970’s for mainframe era.
IBM® Storwize V3700 (Business Partner Version)
Advantages & Disadvantages of Outsourcing
Modular Edge-connected data centers
Modular Edge-connected data centers
Presentation transcript:

CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans to handle growth of CERN’s computing needs HEPiX NERSC Alan Silverman ( with input by T.Cass, L.Pregernig and W.Salter) 29 th October 2009

CERN IT Department CH-1211 Genève 23 Switzerland t Outline Background Options – hosting, containers, new centre Features of Hosting Features of Containers IT’s plans Current status

CERN IT Department CH-1211 Genève 23 Switzerland t Limits of Building 513 Capacity Building 513 arriving to maximum capacity for power and cooling while demands to expand LCG and infrastructure services continue to grow. Limit probably now reached with respect to “critical” systems – systems whose loss would mean major disruption (corporate data and physics meta-data, mail servers, network devices, etc). Plans being made to accommodate more critical services but short term measures needed for next round of database servers among remaining 2009 purchases. IT Department – 29 October 2009 – HEPiX NERSC- 3

CERN IT Department CH-1211 Genève 23 Switzerland t Long Term – A New Building? Plans and budget exist for a Tier 0 centre – a major new building, probably on Prevessin site. Uncertainty created by - –Uncertain physics needs in advance of real LHC data –Ongoing debate of cost-effectiveness of one-time new building versus incrementally adding containers –Unknown costing of different options –Our unfamiliarity with these options Offer from Norway to host a remote centre - –costing unclear –remote operations support also unclear Prefer to take time to understand these various options before coming to a decision. IT Department – 29 October 2009 – HEPiX NERSC- 4

CERN IT Department CH-1211 Genève 23 Switzerland t Short and Medium term Short-term: Price Enquiry issued to host offsite some “critical” systems to be acquired in the next round of purchases. Medium-term: Call for Tender to purchase (or rent) a number of Containers to install on the CERN site. Should be enough for the coming 2-5 years to give us time - –to get some experience of the Container option –to decide long term future –if a new building is chosen, to get it designed and built. IT Department – 29 October 2009 – HEPiX NERSC- 5

CERN IT Department CH-1211 Genève 23 Switzerland t Hosting – choices - 1 Rent space and use our own racks or rent space in their racks? If their racks, does our choice of PC fit with the specifications we select from our PC suppliers? Do they support the power rating we need per rack? Options for cooling the racks Do we rent space now for possible expansion or add this later? (Risk of renting non- contiguous spaces – does this even matter?) IT Department – 29 October– HEPiX- 6

CERN IT Department CH-1211 Genève 23 Switzerland t Hosting – choices - 2 Dual power supply? UPS cover? Networking facilities in the Hosting Centre and between the Hosting Centre and CERN? Local (near CERN) so we can install our own systems and manage them; or remote in which case what service is available? Affect on cost (Geneva prices)? Any software licences needed which may be tied to CERN site? Maintenance contracts for PCs still valid? Data protection laws if personnel or financial data stored offsite? IT Department – 29 October– HEPiX- 7

CERN IT Department CH-1211 Genève 23 Switzerland t Status of Hosting Plans - 1 Stay close to CERN so that we can get some experience with minimal risk. Supplier identified after Price Enquiry. One attractive supplier did not bid because his current installation is full and it would have cost too much for him/us to equip the next part of his building in time for our needs. Contract under negotiation with target of February start. Data protection laws in Switzerland are rather solid (fall-out from Swiss banking) Need 10GB network to CERN – under negotiation IT Department – 29 October– HEPiX- 8

CERN IT Department CH-1211 Genève 23 Switzerland t Status of Hosting Plans - 2 We have decided to use our own racks (because they are cheaper and we can use our manpower for installation) We will probably only rent space for immediate use and take the risk of extra space if we need it later being in a distant part of the hosting site?? No software licence issue but some critical servers can never be off-site for this reason. Since the hosting site is in Geneva, no maintenance issue this time. IT Department – 29 October– HEPiX- 9

CERN IT Department CH-1211 Genève 23 Switzerland t Container Features Size typically 3 by 12 metres. Can be stacked but then you need infrastructure to work on upper boxes. Can be in open air (e.g. at SLAC) but easier if indoors (e.g. Microsoft’s new supercentre in Chicago – space for 56 containers times 2000 servers per container) - –safer access when raining/snowing –covered area to unpack equipment to install. If indoors, need crane or access for mobile crane to install the boxes. No special access needs on Building, already on the Containers themselves. IT Department – 29 October 2009 – HEPiX NERSC- 10

CERN IT Department CH-1211 Genève 23 Switzerland t Container Features - 2 Need access to - –power –water (even if we buy chillers we need to fill them) –technical galleries (for the power and high-speed networking). Need 400V, 3 phase power - –typically up to racks times 15-20Kw/rack = ~300Kw per unit for computers (depends on PCs installed) –150Kw per unit for cooling. IT Department – 29 October 2009 – HEPiX NERSC- 11

CERN IT Department CH-1211 Genève 23 Switzerland t IT’s Plans for containers Initially buy (or rent?) 1 unit for “critical power” systems. Improves IT’s Business Continuity - different power source from 513, distance from 513. Plus 1 unit for LCG physics. Plan on 1 additional unit for physics per year for up to 4 years. Two options (in fact decided on second):- –Buy/rent containers and use Site Services for all power and cooling (then need power and cooling redundancy for critical power container plus UPS for physics units) –Buy/rent a complete service which implies an extra unit to provide safe power and external chillers for the containers. IT Department – 29 October 2009 – HEPiX NERSC- 12

CERN IT Department CH-1211 Genève 23 Switzerland t IT’s needs for containers Ideally a building (Prevessin site? Meyrin West Area?) with capacity as needed Prevessin site offers better “business continuity”. This was chosen. Open ground (recommended to be concreted) with foreseen capacity for 4 years growth; ideally one area but not essential. This is the likely choice. IT Department – 29 October 2009 – HEPiX NERSC- 13

CERN IT Department CH-1211 Genève 23 Switzerland t Status of Container Plans - 1 Outdoor site (with a nearby small building) identified for initial set of containers. Near CCC so good networking close by. EN agree to supply 400V power from a nearby 18KV line and a basic water supply but no cooling facilities (so we need to acquire the chillers as well as backup diesels and UPS) CERN’s complicated purchase procedure has started; target installation Oct 2010 IT Department – 29 October 2009 – HEPiX NERSC- 14

CERN IT Department CH-1211 Genève 23 Switzerland t Status of Container Plans - 2 Initial installation is planned to be – One container for critical services – needs UPS in addition to dual power feeds; One container for physics – needs only dual power feeds; Each container will need a second container for diesel backup and chillers (and UPS for critical services container). Possibility to add one physics container (probably plus services container) per year for 2-3 years. Open question – buy or rent? What is the rental amortisation period? IT Department – 29 October– HEPiX- 15