Pellet Plant Wawasum Corporation. Wawasum 50/50 Partnership BNA & AZA Planned Location: BNA Reserve 67,000 tpa.

Slides:



Advertisements
Similar presentations
Birdfield Building Services is an institution that has an experience as commercial building contractor, specializing in construction, property maintenance.
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
LONDON, 14 TH JUNE 2012 INVESTING IN KEY SECTORS by Dr. Yomi Majekodunmi (YMCA CONSULTANTS)
FNSB Gas Distribution System Analysis July 12, 2012 Patrick Burden Presentation to Fairbanks Community.
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
Putting it all together: Policy directions Cameron Maxwell, Business Development, FCS FEG Autumn Symposium, 8 September 2011.
Simon Par Keeling, Société Générale Paris
European Bioenergy Research Institute: Opportunities and Investment for Cities Tim Miller Operations Director.
MBA (Trimester) Term V Module Title : Project Finance and Management
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
INDUSTRIAL & SYSTEMS ENGINEERING
Off-Grid Power Markets 26 May The off-grid market consists of some of the largest industrial enterprises on the planet, operating in remote.
Biomass to energy projects in the Caribbean and cross-island trade for power production IRENA, Martinique, June
Engineering Technology Division
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Operations Management
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Irwin/McGraw-Hill Copyright © 2001, The McGraw-Hill Companies, Inc. All rights reserved. I n t r o d u c t i o n t o I n f o r m a t i o n S y s t e m.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
[Company Name] Business Plan Why I want my own business  List reasons why you want your own business.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Welcome.. To Green Living!. Introduction Created by Green Living, Inc. Made possible by a $35 million grant from the Department of Energy Provides education.
© Dr. John T. Whiting All Rights Reserved Slide 1 The Rationale for Integrating IT Assets into the Strategic Business.
Harvest residue utilization in small- and large-scale bioenergy Systems: 1 Julian Cleary, Post-Doctoral Fellow Faculty of Forestry University of Toronto.
Vp plc Preliminary Results Year Ended 31 March 2005.
IuliiaGoloborodko. CHAPTER 1. THEORETICAL BASIS OF COST REDUCTION ENTERPRISE CHAPTER 2. BUSINESS ANALYSIS OF DNIPROPETROVSK ASPHALT AND CONCRETE PLANT.
1 Renewable Energy Purpose of the Power Purchase Agreement (PPA) Nebojsa Arsenijevic, BREP Manager.
1 Chapter 7: Business Marketing Copyright Cengage Learning 2013 All Rights Reserved Designed & Prepared by Laura Rush B-books, Ltd. Introduction to.
Copyright ©2009 by Cengage Learning Inc. All rights reserved 1 Designed by Eric Brengle B-books, Ltd. CHAPTER 7 Business Marketing Prepared by Amit Shah.
What Is Operations Management?
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Chapter 1 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 Lamb, Hair, McDaniel CHAPTER 7 Business Marketing © Sean Gallup/Getty.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Computer Software Engineer e-book Created by The University of North Texas in partnership with the Texas Education Agency.
Chapter 3 Business Plan Miss Dinnella.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
The assessment concept of innovative level of Armenia’s industry Gagik Makaryan RUEA chairman 9 September, 2013.
Copyright © 2007 South-Western. All rights reserved. Chapter 9 Improving Productivity and Quality.
Enterprise Systems Business Planning & Logistics Site Manufacturing Operations and Control Area Supervisory Control Basic Control Safety- Instrumented.
Filename.ppt1 The Pursuit of Economic Ocean Energy A Utility Perspective John Fitzgerald Technology Manager ESBI Ocean Energy.
Chapter 7 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 Lamb, Hair, McDaniel CHAPTER 7 Business Marketing © iStockphoto.com/YinYang.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
EU TACIS PROJECT Support and Development of Renewable Sources of Energy (Biomass) Objective Promote the use of biomass in Ukraine Veli-Pekka Heiskanen,
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
Supply Processes and Technology
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
New York City Transit Innovation and Technology Partnering Opportunities Open Innovation : Needs and Opportunities.
Dr. Mohamed Riyazh Khan DoMS
Jobs in Renewable Energy. Portland State University November 8 th, 2010.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 4 Supply Processes and Technology.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Contact us: Call: Mail: Visit:
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
Today´s Challenges of the Rail Infrastructure Industry
Proposed Draft Financial Plan April 10, 2017
Sloan Security Group Established1991
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
OPERATIONS PROCESSES.
WHERE THE ESP INDUSTRY MEETS THE FUTURE
Enron Energy Services Energy Management Outsourcing Overview
Compressed Natural Gas Supply Vehicles
Vp plc The Equipment Rental Specialist
Renewable Energy Project Investments
Student Design Competitions
Whitesand First Nation Case Study Preliminary Engineering Study 2012
Port of Muscatine Planning and Feasibility study
Presentation transcript:

Pellet Plant Wawasum Corporation

Wawasum 50/50 Partnership BNA & AZA Planned Location: BNA Reserve 67,000 tpa

Wood Pellet Market (Categories) INDUSTRIALRESIDENTIAL

Wood Pellet Market (Product/Spec) INDUSTRIALRESIDENTIAL

Wood Pellet Market (Logistics) INDUSTRIAL RESIDENTIAL

Key Market Questions 1.What product will we produce? (Residential or Industrial) 2.Where is our target market? (N.America or Overseas) 3.How will we deliver the product to them? (Rail, Vessel, Truck – cost?)

Ontario Power Generation Atikokan Generating Station Proposed Conversion

Who Buys Wood Pellets? INDUSTRIAL European Union United Kingdom RESIDENTIAL Italy

Great North BioEnergy (GNBE) 1.Wawasum Corp. (BNA/AZA) 2.Atikokan Renewable Fuels 3.Whitesand FN

Great North BioEnergy (GNBE) 3 Production Plants Same Equipment Same Process Same Product 1 Marketing Front

Why GNBE? – European Demand Reliability of Supply Repairs & Maintenance Larger Volume

Wawasum Wood Allocation 113,000 m3/yr 25% Birch 75% Poplar 10 year Commitment (likely 20yrs)

Class 30 Engineering Study and Business Plan Development

Class 30 Engineering & Business Plan Analyses and design of plant Equipment identification and layout Process flow diagram Budget Construction Opinion of Cost (+ - 30%) Simplified Project Schedule and GANTT chart

Class 30 Engineering & Business Plan RESULTS: Cost to produce Industrial? Cost to produce Premium? Adjustments to Business Plan required? Solid numbers to secure financing

WAWASUM – PELLET PLANT NEXT STEPS: Review results of the Class 30 Engineering Review business plan & financials Make any adjustments necessary Secure off-take agreement Secure financing for construction Site preparation & begin construction

Pellet Plant Wawasum Corporation