A Method to Verify Railroad Interconnect with Highway Traffic Signal Systems Adam Moore Portland Bureau of Transportation Oregon ITE Winter Workshop February.

Slides:



Advertisements
Similar presentations
Bus Priority in Portland - Lessons Learned
Advertisements

ITE Western District 2012 Annual Meeting
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Mid-States Highway-Rail Crossing Safety Conference Larry J. Colclasure, P.E. Director of Transportation Operations Texas Department of Transportation Waco.
Quiet Zone Joint Police & Streets Committee Meeting Village of Glendale January 16, 2007.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
T3 Webinar September 2012 Performance Measures Edward J. Smaglik September 18 th, 2012.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
Pedestrian Responsive Signal Timing Strategies Oregon ITE Winter Workshop February 26 th, 2015 Sirisha Kothuri, Chris Monsere, Andy Kading - PSU Peter.
Pedestrians: The Next At- Grade Crossing Frontier Paul F. Brown, PE, PTOE Jacobs Engineering Group ITE Western District Conference June 24-27, 2012 Santa.
Automated Bicycle Data Collection: A Case Study from Portland, OR Western District Annual ITE Meeting June 26th, 2012 Presenter: Sirisha Kothuri
Pedestrian Countdown Signals: Evaluation of Citywide Installation in San Francisco Presentation by Sam Fielding, City and County of San Francisco September.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
Overview of 2009 MUTCD. Tom McDonald, PE Safety Circuit Rider Iowa LTAP.
Locomotive Horn Rule Regulations
Way Side Warning System Toth Industries, LLC Arlington Heights, IL T rackside.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
HAWK Evaluation NE/SE 41 st Ave & E Burnside St Sirisha Kothuri William Farley Kimber Miller Aaron Rieck Civil & Environmental Engineering.
visualSTATE 4 Workshop Seminar Content, Day 1 Introduction Different analysis methods State/Transition principles,  Mealy notation  Moore notation.
Advanced Traveler Information System ATIS. What are Intelligent Transportation Systems (ITS) ? The application of advanced sensor, computer, electronics,
Railroad Problem. Figure 1-Condition Diagram- Nine Mile Road Crossing Novi, Michigan Nine Mile Road 12’ NOVI FIRE STATION FIFE ELECTRIC 23’ 29’ 158’ 32’
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Signalized Intersections
Module 13: Highway-Rail Grade Crossings (HRGC)
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Transportation Engineering
Houston Trainwatch Working together to keep our city safe and moving Jack C. Hanagriff Houston Police Department Federal Railroad Administration Law Enforcement.
Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
Ensuring a Safe University Board of Regents Facilities and Operations Committee December 12, 2013.
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.
IEEE WG14 P 1570 Standard for the Interface Between The Rail Subsystem and the Highway Subsystem at a Highway Rail Intersection.
State Traffic Engineer
Role of the Highway-Rail Intersection in the National ITS Architecture IEEE WG14 June 20, 2000 Bruce Eisenhart Lockheed Martin Architecture Development.
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
1 RANKING OF FUNCTIONAL REQUIREMENTS/ TOPIC AREAS FOR NEEDED RESEARCH BY THE TRB TRAFFIC SIGNAL SYSTEMS COMMITTEE JULY 21, 2002 MID-YEAR MEETING IN SALT.
Quiet Zone along FEC Corridor Paul Calvaresi Broward MPO 1.
Safety Starts with Crash Data Vision Zero Conference Bicycle Coalition of Greater Philadelphia December 3, 2015 Patricia Ott, P.E. MBO Engineering, LLC.
Traffic Signals & ITS to Encourage Walking & Cycling
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Opticom ™ GPS Priority Control System 3M™ Opticom™ GPS Priority Control System Driver Training.
Quantify Insight – 24/7 monitoring for compliance Product presentation By Q uantify.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
March 10, 2010 Smart City Award: ITS America. Traffic Signal Systems in Oregon Significant application of adaptive control (100+ signals) Priority for.
Elizabeth G. Jones Assoc. Professor of Civil Engineering and
Thinking Inside the Box

Improving Intersection Performance
Guide for Determining Time Requirements for Traffic Signal Preemption at Highway-Rail Grade Crossings: Revisions to the TxDOT Worksheet Kevin Balke, PhD,
HSR Crossing Safety Update Elliot A
University of Colorado A Line and B Line Grade Crossing Update
Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption
Grade Crossing Safety Jason l. sanchez manager public projects
Signalized Intersections
Southwest LRT METRO Green Line Extension
Design for mid-block traffic signals adjacent rail
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Rules of the Road Chapter 10
Project Location: 35th Ave HSIP8
Presentation transcript:

A Method to Verify Railroad Interconnect with Highway Traffic Signal Systems Adam Moore Portland Bureau of Transportation Oregon ITE Winter Workshop February 26, 2015

Railroad Advance Warning Time Notification of approaching train forwarded to highway traffic signal controller 1.Terminate red phases and associated ped movements 2.Bring up green phases and hold until gates are down 3.Allow only phases that do not conflict with crossing until preemption ends <200 ft Interconnected crossing 2

Interconnected Crossing Warning Activation Sequence Ped Clear Veh Advance Preemption Gates Down “Island Circuit” Already collected by UPRR Integrated into traffic controller event log Train in Crossing GENERATED BY RAILROAD 3

Safety Advisory “Authorities should install, maintain, and upgrade railroad and highway traffic signal recording devices at interconnected crossings.” “Modern traffic signal systems can record event logs.” 4

Gate Down Vehicle Advance Preemption Ped Clear Signal Cabinet Hardware 5

Advantages of Recording Verification of interconnection functionality, per SA Event log of crossing trends and anomaliesTiming optimizations 6

Interconnected Crossing Warning Activation Sequence Ped Clear Veh Advance Preemption Gates Down Train in Crossing 7

Interconnected Crossing Warning Activation Sequence Ped Clear Veh Advance Preemption Gates Down Train in Crossing GENERATED BY TRAFFIC CONTROLLER Veh Green 8

Warning Sequence Archiving Ped Clear Veh Advance Preemption Veh Green Gates Down Train in Crossing On/Off Train in Crossing On/Off 9

Rail Crossing Event Data Streams Ped Clear Veh Advance PE Veh Green On Gate Down Veh Green Off Seconds Relative to Train Arriving in Crossing SE 11 th Ave/SE Milwaukie Ave & SE Gideon St 10

Rail Crossing Event Data Streams SE 11 th Ave/SE Milwaukie Ave & SE Gideon St Are alarms within one standard deviation? Ped Clear Veh Advance PE Veh Green On Gate Down Veh Green Off Seconds Relative to Train Arriving in Crossing 11

Rail Crossing Event Data Streams How long are trains occupying the crossing? SE 11 th Ave/SE Milwaukie Ave & SE Gideon St Seconds Relative to Train Arriving in Crossing 12

Summary Data recording is very valuable, and satisfies FRA safety recommendations Important to know when train is occupying the crossing “Island circuit” is a relatively simple way to gather train crossing occupancy data September 2015 – LRT! 13

Questions? Adam Moore, PBOT (presenter) Paul Zebell, PBOT Peter Koonce, PBOT Jon Meusch, Northwest Signal Joint Rail Conference 2015 San Jose, CA March Paper #JRC