SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.

Slides:



Advertisements
Similar presentations
PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Advertisements

Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Greeley and Hansen Agenda New Rules For Sanitary Sewer Systems EPA Enforcement Overflow from a Manhole on to the Ground – into a stream, into a basement.
Qabatia Storm Water Sewer System
StormTech Recommends the “Treatment Train” approach.
Fluid Mechanics 07.
II. Sewer Network and Facilities Topic II. 10
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
CCU’s Environmental Quality Lab: Investigation of Ocean Outfalls in Myrtle Beach and North Myrtle Beach, SC Joseph Bennett and Susan Libes.

SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
May 18, 2011 RISING TIDES: West Coast Sea Level Rise Implications for Infrastructure Improvements and Coastal Flood Protection Darryl Hatheway, Sr. Coastal.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
Utility Mapping Water-Sanitary-Storm City of Wausau.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Sanitary Engineering Lecture 14
Infrastructure – Condition Assessment Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions –Streets/Sidewalks/Parking Lots.
York Sewer District Internships and Succession Planning.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
Potomac Watershed Trash Summit March 16, 2006 Washington D.C. Scott Lines City of Long Beach
Low Impact Development (LID)
Flow Through Turbidity Treatment Using Alum & Pam At The Orlando International Airport Project.
Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
PIPE LINE SYSTEM Series Pipe Line System Class I Class II Class III
Introduction to Spring Development
Septic System Construction and Location GET PUMPED!
Negative Integers Objectives: 1.Introduce the terms negative integer and opposite of integers. 2. To find real world situations that deal with negative.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
El Niño SCAP Collections Meeting November 12, 2015 Wet Weather Planning.
Arlington Park Arlington Park is an improperly maintained and operated sewage treatment lagoon. There are approximately 30+ families using this lagoon.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
1 II. Sewer Network and Facilities Topic II. 11. Flow Split and Regulation Chambers: Kinds and Structures Kinds §Weirs l Side weirs l Transverse weirs.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Highest Priority Projects from “Immediate Action” Category Immediate Action All Others.
Stormwater Management
Design and Construction of Composite Lined Landfills
26 – Wastewater Conveyance System Design 2
Effluent from a septic tank effluent gravity (STEG) or septic tank effluent pump (STEP) system is discharged into a collection system. A typical STEP/STEG.
Sewer Appurtenances In a sewerage system along with pipe lines a number of other structures /devices installations are essential. These devices are provided.
Environmental Services
Manchester’s CSO Program: A Look Behind and a Look Ahead
CE 3372 Water Systems Design
WEST & EAST DISTRICT PROJECTS PRESENTATION
L-9 Sewage Pumping Environmental Engineering-II.
WENDELL PARK STORMWATER IMPROVEMENTS
Town of Dunn Sanitary District No. 3
Wastewater Operations and Maintenance
Porirua Pilot Project Background:
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
No Yes Yes Yes No No No Yes Yes No

Burlingame Talks Together about Sea Level Rise // May 21, 2019
Background Lee County has about 180,000 pounds of nitrogen to remove from the Tidal Caloosahatchee. There are limited locations near the stream outfalls.
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH

Seawall Construction

Seawall installed

Setting stormwater manhole

Stormwater Vortex Structure

Stormwater Structure

Finishing installing vortex structure

Pump station wet well with lid

Pump station discharge pipes

Diversion Boxes for High Flow

Pump station gravity bypass

Pump station discharge pipes

Finishing the bottom of the pump station

Completed structure

Pump Station outfall pipe

Stormwater Outfall

6 th Street and West Ave

14 th Street and West Ave.

New Elevation Criteria

New Elevated Streets