TermPaper – DIA baggage handling system

Slides:



Advertisements
Similar presentations
Airport 95: Automated Baggage System?
Advertisements

Software Engineering Oct-01 #12: Design Phil Gross.
Denver Airport Handling System (DABHS)
Managing the Intersection of Technology & Airport Management Issues For Successful Implementation Moninder S Birdi, P.E. President Birdi And Associates,
System Analysis and Design CSUB Yong Choi. 2 Systems Analysis Phases Scope Definition Phase : WHAT PROBLEM – Is the project worth looking at ? Problem.
Greg Melroy Manager, West Monroe Partners. © 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited.
Jaringan Komputer Lanjut Packet Switching Network.
OSI Model OSI MODEL.
Denver International Airport (DIA)
UPS Packaging BY : Ellen Park & Jim Zolty MGNT 357.
Lecture 4: Landside By: Zuliana Ismail.
Summer Workshop on Cyber Security Computer Networks Security (Part 1) Dr. Hamed Mohsenian-Rad University of California at Riverside and Texas Tech University.
Shalini Bhavanam. Key words: Basic Definitions Classification of Networks Types of networks Network Topologies Network Models.
EE 4272Spring, 2003 Chapter 9: Circuit Switching Switching Networks Circuit-Switching Networks Circuit-Switching Concept  Space-Division Switching  Time-Division.
1 Chapter 8 Local Area Networks - Internetworking.
Denver Airport Baggage Handling System (DABHS)
Cross-Docking Distribution Center (DC)
TCP: Software for Reliable Communication. Spring 2002Computer Networks Applications Internet: a Collection of Disparate Networks Different goals: Speed,
Inventory Control in Stores Dec05-09 Team: Jeff Benson Frederick Brown Christopher Reed Brian Wagner Date: December 6, 2005 Client: ISU Senior Design Program.
DIA Automated Baggage Handling System
Baggage Handling Systems Alan Jimenez 12/8/14. What are baggage handling systems? A baggage handling system is a type of conveyor system that has the.
Airport Security. Objectives  Identify where the computer is used at the airport  State the benefits of using computers at the airport  List the steps.
Network Topologies.
Ferndale Electric Company Project overview from September 2007 to present.
Basic Concepts of Computer Networks
Switching Techniques Student: Blidaru Catalina Elena.
3.1 Business and employment. Transportation - Reservation Systems.
Network Design Essentials
NETWORK TOPOLOGIES There are three basic configurations used to connect computers they are the  Bus  Ring  Star.
Spring 2006 Management Information System Successful Implementation of an RFID-enabled Baggage Tracking and Control System Asiana Airlines Siwon,
Introduction to Computer Networks
Kelowna International Airport 2010 Development Program September 17, 2007.
William Stallings Data and Computer Communications 7 th Edition Chapter 1 Data Communications and Networks Overview.
Start Presentation. A Boeing Company The role of Simulation in installation of Explosive Detection Systems Auckland June 03 Helping our customers increase.
Intro to Network Design
Mr C Johnston ICT Teacher BTEC IT Unit 05 - Lesson 03 Network Topologies.
Distributed Computing Systems CSCI 4780/6780. Geographical Scalability Challenges Synchronous communication –Waiting for a reply does not scale well!!
WESTJET AIRLINES Michele Derry Director, Operations Control.
Mr C Johnston ICT Teacher
RELIABILITY ENGINEERING 28 March 2013 William W. McMillan.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNP 1 v3.0 Module 1 Overview of Scalable Internetworks.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 9 Virtual Trunking Protocol.
Route and Network Planning
CS 3830 Day 4 Introduction 1-1. Announcements  No office hour 12pm-1pm today only  Quiz on Friday  Program 1 due on Friday (put in DropBox on S drive)
FTC Home Page FTC Game Page FTCGAMEPAGEFTCGAMEPAGE.
UNIT 2 LESSON 5 CS PRINCIPLES. OBJECTIVES Students will be able to: Explain why protocols are necessary to overcome the underlying unreliability of the.
Components of AP Pax Bldgs Slide 1 of 27 / RdN © Design of Components of Airport Passenger Buildings Richard de Neufville Professor of Engineering Systems.
Problems n The main problem is the congestion of traffic in the air. With the congestion come further problems, such as: –There are too few large airports.
Unit III Bandwidth Utilization: Multiplexing and Spectrum Spreading In practical life the bandwidth available of links is limited. The proper utilization.
Lecture 4: Landside By: Zuliana Ismail.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
What you MUST know before a database system development.
Data Communication Networks Lec 13 and 14. Network Core- Packet Switching.
Wireless Networking Devices. wireless LAN adapter cards wireless access Points wireless bridges wireless routers.
OSI Model OSI MODEL. Communication Architecture Strategy for connecting host computers and other communicating equipment. Defines necessary elements for.
OSI Model OSI MODEL.
Constraints Space Load Capacity Costs Operating hours.
Overview: Cloud Datacenters II
Saint- Petersburg State University of Aerospace Instrumentation
Door to Door Travel Model
How SCADA Systems Work?.
NETWORK TOPOLOGIES There are three basic configurations used to connect computers they are the Bus Ring Star.
Lecturer, Department of Computer Application
DEPARTMENT OF COMPUTER SCIENCE
Chapter 7 Backbone Network
Automation Examples Amazon – Kiva Systems
Switching Techniques.
OSI Model OSI MODEL.
Reliability and Safety
Airline and Airport Procedures Baggage Handling and Control
Presentation transcript:

TermPaper – DIA baggage handling system Hari Nagalla 12/01/2012 ESE6361

Denver International Airport - Background One of the largest and most technologically advanced airports in the world 2X the size of Manhattan – 53 square miles 3 parallel north-south Runways, 2 parallel East-West runways. Room for 12 runways. 3 concourses and 88 gates. Construction started in 1989, with scheduled open in 1993.

Automated Baggage Handling System Designed to distribute all baggage including transfers, automatically between check-in, aircraft and baggage claim. BAE contracted to design and install the system. Project cost USD~190 M. Most complex baggage handling system, other airports used similar design, but at a far reduced scale.

Motivations for advanced baggage handling system Distances between ticket counters and gates/planes are much larger than most other airports. To keep flights on schedule, speedy movement of baggage is critical (quick turn-around time – maximizes airline profitability) Baggage transfer/movement is through under-ground tunnels, so telecarts are preferred.

Methods of Moving Bags Tug & Cart Telecars Labor intensive Manual Method Telecars Multiple luggage pieces in one cart Not automatically sorted Typically used in automated systems

Methods of Moving Bags DCV – Destination Coded Vehicles Each cart contains a single piece of luggage Automatically sorted Not typically used or well tested Little or no human interaction required Selected for the Automated Baggage System at DIA

Methods of moving bags DCV mechanics Metal cart with wheels on the bottom and a plastic tub on top (mounted on a pivot) that tilts into three positions for automatically loading, carrying and unloading baggage Ride on a metal track like a roller coaster Travel up to 24 mph Slow to 4.5 mph for loading and 8.5 mph for unloading Photo-electric sensors trigger laser scanner when DCV is present and associate the bag with the DCV Located every 150 to 200 feet of track Data from scanners is transmitted to a computer that translates it by using a look up table to match the flight number with the appropriate gate

BAE Baggage system Functionality Check-in Bar code labels Bag’s owner Flight number Final destination Intermediate connections and airlines Automated bar code scanner Array of bar-code scanners arranged 360 degrees scan baggage Typically able to scan 90% of luggage Luggage unable to be scanned is routed to another conveyor to be manually scanned Theoretically after reading the bar-code, the system will know where that bag is at all times

System components 300 486-class computers distributed in eight control rooms Raima Corp. database running on a Netframe systems fault-tolerant NF250 server High speed fiber-optic Ethernet network 14 million feet of wiring 56 laser arrays 400 frequency readers 10,000 motors 92 PLCs to control motors and track switches 3,100 standard baggage carts (DCVs) 450 over-sized baggage carts (DCVs) 2,700 photocells Over 17 miles of track Over 6 miles of conveyors

Baggage Handling Process Conveyor belt feed the central network of DCVs. Each bag is independently placed on the DCV, so delivery of bags from conveyor belts must be carefully controlled. The conveyor belt can only advance when there is an empty cart onto which the leading bag on the conveyor belt can be placed. The speed at which the conveyor belts can advance, and thus the performance of the entire system depends on the rate of delivery of empty carts to each conveyor belt.

Baggage Problems Baggage handling system failed spectacularly, during test and demo runs. This resulted in postponing airport opening by several months.

Timeline : Mayor’s humiliation March 2, 1993 Denver Mayor Wellington Webb announces the first airport opening delay. The October 31, 1993 opening date is changed to December 19, 1993 to allow for a seven week debugging of hundreds of systems. October 25, 1993 Mayor Webb announces the second airport opening delay. The December 19, 1993 opening date is changed to March 9, 1994 to accommodate changes made by the airlines, allow more time to test critical airport systems, train airline ticket agents and other workers, and complete installation of fire and security systems. March 1, 1994 Mayor Webb announces the third airport opening delay. The March 9, 1994 opening date is changed to May 15, 1994 to accommodate problems of troubleshooting the airport's complex baggage system. Mayor Webb further asserts that the airport will open on May 15th "come hell or high water." May 2, 1994 Mayor Webb announces the fourth airport opening delay. The May 15, 1994 opening date is delayed indefinitely to resolve more problems encountered while testing the baggage system.

Timeline : Part II June 20, 1994 The Webb administration announces that four steps are required in completion before a new opening date will be announced. BAE must submit a master schedule. Logplan and the city must evaluate the BAE master schedule and conduct several tests to see how realistic it is. Denver must consult with the airlines on their recommendations. The BAE's baggage system must operate for an unspecified period of time at an acceptable level. August 4, 1994 Mayor Webb announces that the city will spend an extra $50 million to build a conventional airport-wide luggage system using traditional tugs and carts. August 22, 1994 Webb announces that Denver International Airport will open on February 28, 1995.

Timeline : Part III September 7, 1994 Denver and BAE sign an agreement that allows BAE to work directly with United Airlines to simplify the baggage system so it can be ready for a February opening. September 21, 1994 Denver and BAE begin mediation over who is to blame for the cost overruns and problems with the baggage system. February 28, 1995 Concourse A's opening is postponed indefinitely, owing to litigation between Denver and Continental Airlines, which has cancelled its lease of 30 gates, and its operation of using Denver as a major hub. Concourse C, carrying 12 airlines, opens with a traditional tug and cart baggage system. Concourse B, housing all of United's gates, opens using the BAE automated baggage handling system only on outbound, Denver-originated flights.

What went wrong? Despite its importance, the baggage handling system was an afterthought The airport was 2 years into construction before the baggage system was considered The system would have to be retrofit into the airport as it was designed initially including narrow tunnels and tunnels with sharp turns making it extremely difficult to navigate the DCVs

What went wrong? part II The time constraint was impossible to overcome The 21 month schedule precluded extensive physical testing or simulation of the full system design

What went wrong? Part III Reliable Delivery System consists of over a hundred waiting lines that feed into each other Belt will only advance when there is an empty cart Empty carts will only arrive after they have deposited their loads Cascade of queues Pattern of loads on the system are highly variable Depend on the season, time of day, type of aircraft The number of possible scenarios is enormous

What went wrong? Part IV Misreads Compounded by the fact that not only are the scanners required to read data from the tags attached to the baggage, but the information must also be transmitted by radio to devices on each of the DCVs. This duality compounds the errors.

What went wrong? Part V Complexity System of this size providing time sensitive delivery of materials on such a large scale had never been done before 12x as many carts traveling 10x the speed of carts typically used at that time Not just an increase in complexity relative to current systems, but a leap in complexity System must track tens of thousands of bags going to hundreds of destinations – all in real time Distributed computer system In addition to regular error checking, software must guard against electrical disturbances in the communications, have multiple levels of redundancy and be able to recover from errors very rapidly

What went wrong? Part VI Line-Balancing problem All lines of flow should have balanced service Need to have sufficient empty carts to accommodate the bags coming off the conveyor belt In a postmortem simulation, the inability of the system to provide adequate empty carts was the primary cause of its failure. A simulation was also completed prior to the start of the project, but due to a lack of communication, BAE was not notified by airport officials of the results; The results stated, in essence, that the system would not work as it was initially designed

Lessons learnt - 1 Baggage handling is an integral part of Airport planning and construction. Due attention should be paid during Elaboration, design phase. Making the system to work increases ‘exponentially’, as complexity increases. Automatic Baggage handling for entire airport is very complex with thousands of mechanical/control devices and SW systems. Make smaller automatic systems (one for each concourse etc) to get confidence and then incrementally automate adding more consourses, terminals)

Recommendations - 1 Using RFID tags on bags (instead of barcode readers) may help improving mis-reads. Line balancing/ allocation of empty carts to loading points may be optimized : - Use cameras at Ticket counters to monitor check-in pattern. Video analytics to identify bags. - Get checked-in bag info of the arriving flight in advance and allocate empty carts.

Recommendations - 2 There are similarities between Automated Baggage handling using DCVs and IP packet routing: Bag – data packet Baggage tag – packet header Conveyor/DCV – Ethernet/ATM Junction Switch – Router/Gateway IP networks have evolved over time and lot of research, went into issues like – a) congestion control b) route selection, route balance. c) QoS (Quality of Service) – Some packets have precedence. It may be worth studying these similarities to adapt some of the techniques from IP routing to automated baggage handling.

Acknowledgements “The Baggage System at Denver: Prospects and Lessons,” Journal of Air Transportation Management, Vol. 1, No.4, Dec., pp. 229-236, 1994. “How Baggage Handling Works,” HowStuffWorks.com The Baggage System at Denver: Prospects and Lessons – Dr. R. de Neufville – Journal of Air Transport Management, Vol. 1, No. 4, Dec., pp. 229-236, 1994“Simulating the Denver airport automated baggage System,” Dr. Dobbs Journal, January 1997