Welcome to the Lego Widget Flow Factory!

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Building Lean Systems Mixed Model Scheduling. 2 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed-Model Scheduling and Small.
Part of a Training Module Series Part of a Training Module Series Kaizen Orientation Training.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Vandal Boat Factory Simulation
LeanSigma ® Facilitator Training Module 9 – Just in Time.
Supplier Development Kaizen Implementation Kit
JIT, TPS, and Lean Operations
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Just-in-Time and Lean Systems
Principles for Implementing Lean Manufacturing Lecture 2: Overview 1.Discussion of Joe’s Garage 2.Lean Terminology in Joe’s Garage 3.Types of Waste; Eliminating.
Lean Operations (JIT) Module
CSUN - Prof. David Shternberg
Value Stream Analysis Kaizen Training
MSE507 Lean Manufacturing
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Material Handling. Materials Handling Materials handling is a non-value activity that your customer is unwilling to pay for. Constantly question material.
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Value Stream Mapping.
Principles for Implementing Lean Manufacturing Lecture 3: Overview 1.Lean Methodology and Building Blocks 2.Kaizen Methodology 3.The 5 Whys 4.Fishbone.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Course goals and syllabus Logbook expectations & logbook review form
JIT and Lean Operations
How to Effectively Implement Set-up Reduction in Any Organization.
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
SchedulingProducingControllingSchedulingProducingControlling.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Warm-Up Identify two different ways to change the form of a material.
Philosophy and Key Concepts
Lean Manufacturing Chapter 15 pp June 29, 2012.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
College of Engineering ENGR 1181 Engineering Education Innovation Center Quality and Productivity Lab.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
SchedulingProducingControllingSchedulingProducingControlling.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Contact Deb Wallace at TMAC (817) or go to for more information Automation & Robotics Research Institute  The University of Texas.
Review of Lean Topics Dewey Warden.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
We’ll cover:  1. What is a Kanban System and how does it apply to anything you want to do?  2. How to set up a Kanban System 2.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
VMPS and Surgery Applying the Virginia Mason Production System to the Operating Room Rabia Nizamani, MD General Surgery, R3 Thursday, July 19, 2012.
Operational Excellence Molina Healthcare Washington Lora Nelson & Alexander Thompson.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
CHAPTER 9 Lean Manufacturing.
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
COMPUTER INTEGRATED MANUFACTURING
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Chapter 2 Office and knowledge work
Welcome to my presentation
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Welcome to the Lego Widget Flow Factory! Expectations Welcome to the Lego Widget Flow Factory! Our goal today: run a manufacturing simulation 4 times make a simple Lean Manufacturing change on each run Measure the results of each change in a ScoreBox To illustrate some important concepts about Lean Manufacturing. The waste of batch processing / mass production Batch Size Reduction Continuous Flow Learning to See Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Factory Setup The Operators The Product The Parameters Operator 1 8 Material Handler Operator 3 The Parameters 9 Quality Inspector Making Lego Widget 4 Rounds of Production 10 Employees Production Demand = 12 Operator 4 10 Customer Operator 5 Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

ScoreBox Lead Time- time it takes to produce one complete item, from start to finish. Or, sum of each operator’s cycle time. WIP- Work in Process. How many pieces remain on the production floor after customer demand is met? Total Finished Units- In this case, Customer Demand. Total Operators- Number of people working in the process. Total Elapsed Time- Amount of time from when the first unit is begun to the time the last unit is finished and delivered to the customer. Total duration. Total Operator Time- Total Operators(D) x Total Elapsed Time(E). Total amount of manpower spent on this operation. Productivity- Total Operator Time(F) / Total Finished Units(C). Total amount of manpower spent per piece (in this case, converted to people-seconds per piece). Hours per Thousand is a productivity measure, a more Lean measure is Seconds per Unit. Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Round #1 Rules The customer wants 12. Produce in batches of 12. Each operator must finish 12 before passing to the next operator. If you finish 12, keep working! Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Do you think batch size reduction will make a difference? Round #2 Rules The customer wants 12. Produce in batches of 6. Each operator must finish 6 before passing to the next operator. If you finish with 12, keep working! Do you think batch size reduction will make a difference? Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Why it made a difference. “Batch Processing” Why it made a difference. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Operator 1 m Operator 2 Operator 3 Operator 4 Batch Processing Drop a new widget into this process, how long before it finishes? Effects of “Batch” Manufacturing Long Lead Times Excess WIP / Inventory Creates Waste (Wait, travel, over-production, etc….) Resource Consumption (Handling, floor space, workers) Increases Chances for Poor Quality Continuous Flow Does it take longer to go into the downtown heart of large city at rush hour or at 02:00 am? It is the same distance, and same amount of traffic lights. The difference is the amount of inventory – in terms of cars - on the road! Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Batch & Queue Nightmare The Old Process meets the New Process. One cart of product moving to growing (in a kaizen that eventually improved the process by 40%), has to wait to get through because of batched raw material narrow the hall, and a batch of 12 carts moving through on one side, and a batch of 9 carts sitting on the other side. Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Do you think continuous flow will make a difference? Round #3 Rules The customer wants 12. Produce in batches of 1. Each operator must finish 1 before passing to the next operator. If you finish 12, keep working! Do you think continuous flow will make a difference? Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Why it made a difference. “Continuous Flow” Why it made a difference. Suppose you had to perform the process pictured above: Which method would be faster? Batch Processing / Mass Production do as many as you can, build inventory whenever possible Continuous Flow make one - move one OR Fold each letter until all the letters are folded Stuff each envelope until all the envelopes are stuffed. Seal each envelope until all the envelopes are sealed Apply stamps until all the stamps are applied Go to the mail box. Fold one letter Stuff one envelope with the folded letter Seal the envelope Apply a stamp. Repeat steps 1-4 for each unit. Go to the mail box. Which method would be faster if it was done by 1 person? Which method would be faster if it was done by 3 people? Making an assembly line of 3 people would merely hide the waste. Apply the lesson from the Lego Widget Factory – ‘make one – move one’ would be faster. Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Value Waste Learning to See Two Forms of Waste Does it change the form, fit, or function of the product? Is the Customer willing to pay for this activity? Waste Two Forms of Waste Necessary Waste- activity that adds no value to the product, but can not be eliminated because of current technology, culture, or politics. Unnecessary Waste- can be eliminated 8 Characteristics of Waste Learning to See means learning to see the flow of activities that create a product, and the associated value and waste associated with my daily activities. The goal is to implement continuous, incremental improvement, always working to eliminate waste and increase value to the customer. Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

8 Characteristics of Waste Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

8 Characteristics of Waste Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Round #4 Rules The customer wants 12. Form a kaizen team to improve the process, applying the Lean tools that you have learned to eliminate the 8 forms of waste. If you finish 12, keep working! Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

The House of Lean Continuous Improvement Employee Involvement Quick Changeover Standardized Work Batch Reduction Teams Quality at Source 5S System Visual Plant Layout POUS Cellular/Flow Pull/Kanban TPM Value Stream Mapping Continuous Improvement Employee Involvement Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Operator 5 – Yellow or Orange Operator 6 – Yellow or Orange Pull Systems Operator 5 – Yellow or Orange Operator 6 – Yellow or Orange Operator 7 – Red, Green, or Blue Customer Order Name: Fred’s House of Widgets Date Wanted: Immediately Item: Widget Qty: 4 Customization: Red 4 dots, Yellow 2 dots Customer Order Name: Widgets ‘R-US Date Wanted: Immediately Item: Widget Qty: 4 Customization: Orange 2 dots, Green 4 dots Customer Order Name: Widget-Mart Date Wanted: Immediately Item: Widget Qty: 4 Customization: Blue 4 dots, Yellow 2 dots Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211

Pull Systems Andy Rogish, Performance Management, rogisha@yoder.com, 239-728-2535 x211