SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.

Slides:



Advertisements
Similar presentations
Chapter 8 Setup Reduction.
Advertisements

Standard Work Making the “new way” become the standard way
Setup reduction / quick changeover
Setup Reduction For CNC Machining & Turning Centers Copyright 2001 Demo only – Most topics are not active!
Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
A3 Reports. Aims & Objectives Target Audience : Anyone who has to write a report or proposal Purpose of Module : To confirm understanding and benefits.
Mechanical Workshop Module 6: Drilling.
Mechanical Workshop Module 6
Workshop: Maintenance Work Requests May 3, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
1 Setup Reduction For CNC Principles Copyright 2001.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado.
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
MSE507 Lean Manufacturing
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
1 SPIRIT. 2 Silicon Prairie Initiative on Robotics in Information Technology A Typical Day in Engineering.
Just-In-Time “Eliminate Waste”.
Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
Planning for CNC Operations. Coordination of 5 functions u 1. NC management - shop supervisor u 2. Part programming - programmer u 3. Machine operators.
How to Effectively Implement Set-up Reduction in Any Organization.
Setup Reduction Module
Kanban “Signboard”.
Quick Changeovers & SMED
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Management Review Maurice Fitz-Gerald President-Sales Manager Terri Gaquerel General Manager Adam Hunt Financial Officer Danny Pike Engineering.
Management Process Mrs. Nations Intro. to Business and Technology.
Chapter 8 Setup Reduction.
Chapter 11 Production and Operations Management Learning Goals
Value Analysis/ Flow Analysis
Analyze Improve Define Measure Control Improve L EAN S IX S IGMA L EAN S IX S IGMA Ensuring Value (Part 2)  Quick Changeover / Set-up Reduction.
Lean Basics Dewey Warden.
Single Minute Exchange of Dies
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Drill Press 09 Setup Reduction Kaizen Blitz September , 2002 Casey Backyard ProductsDrill Press 09 Setup Reduction Kaizen Blitz.
Production Activity Control
Single Minute Exchange of Die OR Quick Changeover
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
“Without the Cost of Waste …”
Islamic University of Gaza - Palestine Chapter 5 Search for Solutions.
© 2003 McGraw-Hill Australia Pty Ltd, PPTs t/a Accounting Information & Reporting Systems by A. Aseervatham and D. Anandarajah. Slides prepared by Kaye.
Project Chiron SMU TEAM ALCON
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Paper Planes Paper Aeroplane Simulation. Session Outline Setup a factory to make paper aeroplanes Run the factory and record performance data Analyse.
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeover Single Minute Exchange of Dies
Tapping/Threading Tools
Introduction to Lean Emily Varnado.
Chapter 2 Office and knowledge work
Presentation on Capstan, Turret Lathe 1.
Total Productive Maintenance and Quick Changeover
PLEASE NOTE: freeleansite
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
PRODUCTION PLANNING AND CONTROL
MENG 447 Manufacturing Systems Automation Chapter 1*
Setup Reduction -- Creating More Production Time Dr. Richard A
Project Chiron SMU TEAM ALCON
Systems Analysis and Design
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
Quick Changeover Techniques
Project Chiron SMU TEAM ALCON
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Set-Up Technique
Presentation transcript:

SETUP IMPROVEMENT

Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first good piece of the next job. In essence, Setup considers the ACTIVITES and TIME SPAN from GOOD PIECE (A) to GOOD Piece (B)

What setup reduction is not Not to reduce set-up people –A 50% reduction in setup time will not lead to a 50% reduction in setup people. Typically no reduction in setup people. Not to produce more product –(except when capacity is a issue)

WHY Reduce Setup times? Key reason is to Reduce Lot Sizes Reduced WIP Reduce Lead Time Better Quality Flexibility

Work Content Breakdown Ex. Preparation, after-process returns, and checking of raw material, blades, dies, jigs, gauges, etc. Mounting and removing blades, fixtures, chucks, etc. Centering, dimensioning, & setting of other conditions Trial run & Adjustments 30% 5% 15% 50%

Two Kinds of Setup Activity Internal –Can be performed only when the machine is shut down, or process is not producing. External –Can be performed while the machine is running, or process is producing.

Fundamental Rule If an ACTIVITY can be done with the process is running (externally), then it should be done while process is running.

Where to Start Bottlenecks Short Lead-time Customer Complaints Delivery

Guidelines & Tips Review and Document current layout & process –Data Collection The complexity of the job change will determine how many observations needed View complete change over whenever possible Simulate change over when feasible Video Record Process Map Fishbone

Guidelines & Tips Evaluate process, look for possible enhancements. Incorporate the operator, supervisor, processor, setup person, etc. in the evaluation. Separate internal and external activities Reduce internal activities by doing more work externally Brainstorm for improvements

Guidelines & Tips Reduce/improve both internal and external activities –Internal Standardize Fixtures Locating Pins Standardize die heights Predetermined X-Y coordinates in CNC machines Standardize & improve clamping methods Reduce the number of bolts

Guidelines & Tips Standardize bolt heads Cut off unnecessary threads U-Washers SPC - Pre-control charts T-slot and U-slots in base plates –External Eliminate adjustments - potential 40% to 50% Maintenance of tools, gages & fixtures

Guidelines & Tips Preset tools and position dies Assign additional people to setup when feasible Pre-stage all items - Die carts, tool boards –get tooling, fixtures, dies, and molds Dismantle and repair items Clean up Return tooling What paperwork/necessary computer information Reduce internal activities by doing more work externally

Guidelines & Tips Coordinate and plan external work –Create a Setup Chart –Color code fixtures and tool –Code location and description of dies –Locate storage as close as possible –Start preparation before the last part is run –Plan for extra manpower

Guidelines & Tips KEEP AN OPEN MIND, ASK “ WHAT IF” Test ideas and measure results Implement improvements Document the new process

In Conclusion Quick reaction to the DEMANDS of the market is critical. The ability to give your customers WHAT, WHEN & HOW MUCH they want is essential. Efficiently changing from one job to another job is a MUST.