Increasing Pipeline Safety Through Shared Planning Pipeline Safety Trust Conference New Orleans, Louisiana 9:30 a.m. Session, November 16, 2007.

Slides:



Advertisements
Similar presentations
I NDIANA S A GING AND P OTENTIALLY H AZARDOUS P IPELINE S AFETY I NFRASTRUCTURE M EDIA C ONFERENCE C ALL P RESENTED B Y : T HE H OOSIER E NVIRONMENTAL.
Advertisements

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety Damage Prevention Programs Christie Murray Senior.
August 2014 Southeast Reliability Project. 2 Dominion Profile: Power and Natural Gas Infrastructure Leading provider of energy and energy services in.
Conservation Commissions and the Kinder Morgan Proposed Gas Pipeline PRESENTATION TO NORTHEAST MUNICIPAL GAS PIPELINE COALITION SEPTEMBER 22, 2014 MASSACHUSETTS.
WHO’S IN CHARGE? 70,000 MILES OF PROPOSED PIPELINES IN OHIO? AN INFORMATION SESSION Pipeline Impact on Ohio Landowners Michael M. Hollingsworth, Attorney.
113 East College Avenue, Suite 200 Tallahassee, Florida
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Increased Pipeline Safety Through Shared Planning Pipeline Safety Trust Conference New Orleans, LA November 15, 2007.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
Pipeline Replacement Programs Presentation By Frank Radigan Hudson River Energy Group June 26, 2012.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
The Natural Gas Act & NEPA: How will FERC review the proposed Dominion pipeline? Greg Buppert, Southern Environmental Law Center.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Plains Justice Environmental Justice for the Great Plains Paul Blackburn, J.D. Staff Attorney, Plains Justice 100 East Main Street Vermillion, SD
Pipelines and Informed Planning Alliance A Real Estate Symposium International Right of Way Association/Appraisal Institute Las Vegas, NV January 13-15,
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Regulation of Pipelines
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Track # SHAW ENVIRONMENTAL © 2006 The Shaw Group 4171 Essen Lane Baton Rouge LA USA.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
Interventions by Civil Society on Competition Issues Geneva - January, 29 th of 2004 Conference of the International Network of Civil Society Organizations.
Julie Halliday, Program Development DOT – PHMSA – OPS November 18, Pipeline Safety Trust Conference Pipeline Safety – Getting to Zero Pipeline.
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
S.A.V.E. is a non-profit community organization whose aim is to sustain the southern Chester County region’s rural quality of life and community character.
1 DCP Midstream 2008 School Campaign Jeannette Jones November 21, 2008 Pipeline Safety Trust – 2008 Conference New Orleans, LA.
WEST VINCENT, WEST PIKELAND, EAST NANTMEAL, GREEN VALLEYS ASSOCIATION CHESTER COUNTY PA PHMSA TECHNICAL ASSISTANCE GRANT Pipelines and People Putting Them.
S.A.V.E. Consultant: Lynda K. Farrell Blue Heron Consulting & Honeysuckle Hill Farms Agricultural & Environmental Consulting Chester County, PA Phone:
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
Pipeline Safety Trust Pipeline Safety Conference New Orleans November 5-6, 2009.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipelines and Informed Planning Alliance (PIPA) Steve Fischer.
Extension, Outreach and Research Activities For promotion to Public Service Associate J. Phil Campbell Crop and Soil Sciences Department.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Pipelines & Land Use Planning Tim Sweeney Pipeline Safety Trust Conference New Orleans November 3,
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Public communication before and during new pipeline construction? No single answer to how, when and what information is available. Denise Hamsher.
Mark Ruane ERCOT Vice President of Credit and Enterprise Risk Management Dodd-Frank Act Exemption Update Technical Advisory Committee May 5, 2011 Bill.
Damage Prevention – Are States as engaged as they need to be ? Pipeline Safety Trust Meeting November 20, 2008 New Orleans, LA Glynn Blanton, PHMSA State.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
2015 Pipeline Safety Trust Conference, November 19, 2015 TURNING TO THE STATES: WOULD MORE STATE AUTHORITY AND OVERSIGHT IMPROVE SAFETY? A Look at the.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Federal Guidance for Pipeline Rights-of-Way Daron K. Moore El Paso Pipeline Group November 16, 2007.
Restoring Trust in Pipeline Safety Katie Hansen, Board of Directors Pipeline Safety Trust.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
The NH Climate Action Plan and the need for Adaptation Sherry Godlewski NH Department of Environmental Services
ANNEXATION Statutory Overview July 19, 2011 David L. Yearout, AICP, CFM.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
September 2014 Atlantic Coast Pipeline. 2 Dominion’s Core Values Safety Ethics Excellence One Dominion.
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Atlantic Coast Pipeline Fayetteville Regional Association of Realtors March 15, 2016.
Planning and Zoning Division Jefferson County RZ Sevens Residential Memory Care ODP Case Manager: Russell D Clark.
Bradford Glen HOA Lisa Van Houten - Board Member
NEB Modernization: Expert Panel Engagement Session March 7, 2017
PHMSA Update for the API RP1162 Rewrite Team
Presentation transcript:

Increasing Pipeline Safety Through Shared Planning Pipeline Safety Trust Conference New Orleans, Louisiana 9:30 a.m. Session, November 16, 2007

Topic The need for policies affecting the siting, width and other characteristics of new pipeline rights-of-way (ROW)

Presented by Joseph Rust Affected Landowner, REX East Natural Gas Pipeline, Greensburg (Decatur County), Indiana

Background Most landowners affected by the REX East natural gas pipeline received initial notification of the project from REX in June 2006 via first class mail. Most landowners affected by the REX East natural gas pipeline received initial notification of the project from REX in June 2006 via first class mail.

Summary of Project: From Summary of Project: From Pipeline Route from REX website Pipeline Route from REX website

REX “Open Houses” Were Ineffective, Even Harmful. REX “Open Houses” Were Ineffective, Even Harmful.

 Our Pipeline Path Apparently Changed

 Panhandle Eastern Pipeline Path In Indiana

Various Reasons For Southern Route Given By REX At Different Times Various Reasons For Southern Route Given By REX At Different Times The Real Reason May Well Have To Do With Waiver REX Received From PHMSA. The Real Reason May Well Have To Do With Waiver REX Received From PHMSA. “Approximately 90 percent of the Rockies Express pipeline will be located in Class 1 areas in a common right-of-way with other pipelines.” “Approximately 90 percent of the Rockies Express pipeline will be located in Class 1 areas in a common right-of-way with other pipelines.”

REX Changed The Formula But Wasn’t Challenged By FERC REX Changed The Formula But Wasn’t Challenged By FERC  In their application of April 30, 2007, REX stated “A majority of the pipeline (over 50%) will parallel existing utility corridor right-of- way…The majority of the route…83%, traverses Class 1 (rural and agricultural) areas.” (Pg. 16) What happened and what are the consequences? What happened and what are the consequences? Indiana Regulatory Agencies Were Not Aware of the Project Indiana Regulatory Agencies Were Not Aware of the Project

Some Pipeline Path Changes Were Made Behind Closed Doors Some Pipeline Path Changes Were Made Behind Closed Doors REX Refused to Negotiate a Satisfactory Mitigation Agreement with Agricultural Interests In A Timely Manner REX Refused to Negotiate a Satisfactory Mitigation Agreement with Agricultural Interests In A Timely Manner REX Did Not Do Their Homework REX Did Not Do Their Homework REX Assumed the Process That Worked West of the Mississippi Would Work East of It REX Assumed the Process That Worked West of the Mississippi Would Work East of It

Poor Upfront Research Has Caused Numerous Changes Poor Upfront Research Has Caused Numerous Changes Communications With Landowners in the Field Are Poor Communications With Landowners in the Field Are Poor

What Can We Learn From This and Help Future Pipelines Proceed More Efficiently? 1. Any route following existing pipelines should proceed as today, subject to investigation in #6 below. 2. Any new pipeline going into “virgin” territory needs to follow a different pre-routing procedure, including direct involvement of the federal, state and local government agencies, including agricultural interests, before a pipeline route is pre-filed.

3. Having all hearings open to public in this pre- route time would eliminate the mistrust. Encourage Area Planning and Zoning Boards and County Commissioners to participate. Cast a wide net. 4. FERC should be in charge of the pre-routing process and insure relevant agencies are engaged, not just notify them. 5. D.O.T. (PHMSA) and FERC should work together, not act like safety, routing and environmental concerns are somehow separate concepts. Neither the public, nor state and local authorities, see them as separate, nor should PHMSA and FERC. This is bureaucracy at its worst.

6. Before virgin routes are proposed, FERC should determine whether existing pipelines are in need of replacement with more modern, larger, and safer lines. 7. Granting waivers should be a rare exception. 8. Realistic pipeline and compressor station setbacks need to be developed by D.O.T. in conjunction with state pipeline safety agencies. 9. Educate First Responders and disaster preparedness agencies what they must plan for in case of a leak or rupture.

Better pre-planning groundwork will eliminate most of the mistrust and misunderstandings that exist today, and will allow natural gas to flow in the best interests of the U.S., resulting in lower costs and safer conditions for all. Better pre-planning groundwork will eliminate most of the mistrust and misunderstandings that exist today, and will allow natural gas to flow in the best interests of the U.S., resulting in lower costs and safer conditions for all. Summary

Thank You I am available for questions Joseph Rust 9597 E. Co. Rd. 550 N Greensburg, IN