Wyoming Natural Gas Pipeline Authority “Moving Wyoming Gas to California” December 9, 2003 John R. Smith Director Regulatory and Governmental Affairs Mark.

Slides:



Advertisements
Similar presentations
Bob Mishler Director Business Development January 15, 2008 LLC.
Advertisements

Cascade Natural Gas Corporation 2014 Natural Gas Outlook Mark Sellers-Vaughn Manager, Supply Resource Planning July 8,
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Combination Case Results December 2009 Contacts: Kevin R. Petak.
1 AEC October 31, To Chicago Western U.S. Gas Grid Northern Border Kern PGT Northwest El Paso CIG & WIC Trailblazer CIG KN Potential Connect to.
Wyoming Pipeline Authority October 2008 Sunstone Pipeline LLC.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
1 CARB Public Consultation Meeting Compressed Natural Gas Specifications August 3, 2005 WSPA/CIPA Presentation Western States Petroleum Association (WSPA)
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
5/10/07 Pipeline CO2 Spec Columbia Gas1.25 ANR Pipeline2.00 Panhandle Eastern2.00 Texas Eastern3.00 Tennessee3.00 Rockies Express Northern Natural Another.
Date: February 5, 2014 Casey Whelan Natural Gas: A Star Performer in the Past, Great Potential for the Future.
© 2008 ICF International. All rights reserved. NYSERDA Much Colder Than Normal Weather Case Results November 2009 Contacts: Kevin R. Petak (
© 2008 ICF International. All rights reserved. New York Gas Market Overview Based on NYSERDA Case 1 (n0908) March 2009 Contacts: Kevin R. Petak (
The Commonwealth of Virginia 2015 State Contracts Meeting – Compass Energy Placeholder.
1 JOINT MINERALS, BUSINESS AND ECONOMIC DEVELOPMENT COMMITTEE December 5, 2005.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Wyoming Pipeline Authority August 24, 2004 Mark C. MoenchJohn R. Smith Vice President and General Counsel Director, Regulatory and Governmental Affairs.
Natural Gas Markets and Reliability of the Electric Power Industry William Trapmann, Energy Information Administration Natural.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
Energy Action Plan Natural Gas Update California Public Utilities Commission California Energy Commission Randy Roesser December 8,
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Eugene T. Meehan Senior Vice President Presented at: Empowering Consumers Through Competitive Markets: The Choice Is Yours Sponsored by: COMPETE and the.
Page 0 WYOMING’S NATURAL GAS – At a Glance October 26, 2004.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
Wyoming Natural Gas Pipeline Authority Wyoming State Emergency Response Commission, January 20, 2006, Cheyenne, WY Presented by Colby Drechsel, Technical.
1 Legislative Session February 17, Proposed Legislative Changes Increase WPA bonding capacity from $1 billion to $3 billion Expand State Treasurer’s.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Pipeline Projects October 24 th, 2006 Joey Purdy, Vice President Crude Oil Supply.
® ®® ® IRP Workshop Feb 9, ®  February 9, Workshop - Review of 2014 IRP Order - December 30 and 31 Weather Event - Demand Forecast and 65%
Wyoming Pipeline Authority October 28, 2003 Mark Quinlan Director Marketing. Mark Quinlan Director Marketing.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Implications of Greater Reliance on Natural Gas for Electricity Generation 1.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Wyoming Enhanced Oil Recovery Institute Joint Producers Meeting CO 2 in Wyoming June 26, 2007 Casper, WY Brian Jeffries Executive Director Wyoming Pipeline.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
CALIFORNIA ENERGY COMMISSION NATURAL GAS ASSESSMENT: SHORT AND LONG TERM Briefing to the Legislature Assembly Utilities and Commerce Committee January.
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
Update on the Natural Gas Situation: Terry H. Morlan Northwest Power Planning Council Power Committee Briefing July 16, 2003.
Tennessee Valley Authority John J. McCormick Sr. Vice President, River Operations and Renewables.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Gas Storage – the DTI perspective John Havard Energy Markets Unit, DTI Presentation to the Geological Society 19 th October 2004.
California Energy Action Plan July 17, Energy Action Plan Natural Gas Actions Status Report David Maul California Energy Commission Staff And Richard.
John C. Felmy Chief Economist and Director Policy Analysis and Statistics American Petroleum Institute June 1, 2002 North American Economic.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
California Gas System Overview
2 The Bison Pipeline Project Open Season planned for 2 nd Quarter of 2004 Proposed Interconnects -Deadhorse (Bighorn, Fort Union) -MIGC, Thunder Creek.
Market Implications and Considerations for Enhanced Scheduling Flexibility: Facts Observations Problems Solutions February 2016 Greg Lander– President.
CEC Workshop January 24, 2003 January 24, 2003 Chris Price Market Development Wild Goose Storage Inc.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
1 Supply, Demand, and Storage Overview West Gas Offsite September 10, 2001 Phil Polsky.
1 Rockies Outlook For Internal Use Only April 12, 2001.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Operations Directors Conference October 9, 2001
Northern Border Partners (11.8%)
ALBUQUERQUE TEAM MEETING November 7, 2001
Wyoming Business Alliance/Wyoming Heritage
Presentation transcript:

Wyoming Natural Gas Pipeline Authority “Moving Wyoming Gas to California” December 9, 2003 John R. Smith Director Regulatory and Governmental Affairs Mark Moench Vice President and General Council

Kern River Business Update May 1 through November 30, 2003 On May 1, 2003, Kern River transported 1,659,000 Dth/d (95% load factor). Post-expansion, Kern River has averaged a 100% load factor. The summertime peak day scheduled delivery was over 2Bcf/d. Basin price differential have narrowed from $1.05 on May 6, 2003 to a low of $-.16 on November 6, Currently it is $.18. November throughput has declined to a low of 1.3 Bcf/d and averaged 1.6 Bcf/d. Gas Supply into Kern River appears to be insufficient in the winter.

Future Expansions Opportunities Over 3,000 MWs of new direct-connected electric generation are currently under construction and projected to come on-line by California utilities have 2 Bcf/d of contract capacity on competing interstate pipelines which expires by California LDCs need supply diversity and Kern River will compete for this market. YearVolume in Dth’s , , , ,240, ,239 Total2,465,328 Kern River can be economically expanded by completing un-looped segments and adding compression. Engineering, environmental and hydraulic modeling work is underway to enable the pipeline to be expanded in a market responsive manner when market signals appear.

Expansions Prerequisites Remove SoCal Gas tariff based delivery constraints at their city gates. Develop addition Wyoming and Rockies supply infrastructure. Rationalize any unwanted Kern River capacity. Capture California core market share as transportation contracts expire on competing pipelines.

Kern River Rate Case Facts Kern River must file a rate case no later than May 1, 2004 pursuant to its existing settlement in RP Kern River has entered into confidential pre-filing settlement negotiations with its shippers to achieve a settlement in lieu of filing a rate case. Settlement negotiation started October 1 and are still in progress. Kern River hopes to conclude negotiations by February 1, 2004.

Opportunities and Conclusions Kern River’s 2003 Expansion is complete and has been operating at a high load factor until colder weather started in November. Reserve life of Rocky Mountain production is large, but new supply infrastructure to fill Kern River and underpin new expansions is still necessary. Significant California utility contract expirations will occur over the next four years providing Kern with a market entry opportunity to capture California core markets.