Chapter 10 Project Monitoring and Control

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Monitoring and Information Systems
Monitoring and Control
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Chapter 10: Monitoring and Controlling Change
Monitoring and Controlling
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Earned Value Management
OPMA 5364 Project Management Part 6 Project Control
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Project Management 6e..
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Monitoring and Information Systems
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Chapter 9 Project Development. What to manager Client experience  Clients are very important  Happy or not is largely dependent on their expectations.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
Stage III: Project Execution and Control Earned Value Analysis B: Chapter 8: pages B: Chapter 12: the entire chapter.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Copyright 2012 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Copyright 2009 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Project Management 6e..
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
Project Management Information System What?? Objective: –Record & report relevant information and status of various components of project –Highlight the.
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Project Cost Management
Project Monitoring
Monitoring and Information Systems
TOPIC-8B- PROJECT COST CONTROL
CHAPTER:7 Project Cost Management
Project Cost Management
Earned Value - What is it
An Introduction to Earned Value Performance Measurement
Project Cost Management
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
Earned Value Management
Monitoring and Information Systems
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Cost Management
Monitoring and Controlling
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Chapter 10 Project Monitoring and Control Chapter10 Project Monitoring & Control

Project Monitoring and Control Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others wish to know Controlling – uses data from monitor activity to bring actual performance to planned performance Chapter10 Project Monitoring & Control

Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor? Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Why do we monitor? Simply because we know that things don’t always go according to plan (no matter how much we prepare) To detect and react appropriately to deviations and changes to plans Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control What do we monitor? Men (human resources) Machines Materials Money Space Time Tasks Quality/Technical Performance Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control What do we monitor? Outputs Progress Costs Job starts Job completion Engineering / Design changes Variation order (VO) Inputs Time Money Resources Material Usage Tasks Quality/Technical Performance Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control When do we monitor? End of the project Continuously Regularly Logically While there is still time to react As soon as possible At task completion At pre-planned decision points (milestones) Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Where do we monitor? At head office? At the site office? On the spot? Depends on situation and the ‘whats’ Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control How do we monitor Through meetings with clients, parties involved in project (Contractor, supplier,etc.) For schedule – Update CPA, PERT Charts, Update Gantt Charts Using Earned Value Analysis Calculate Critical Ratios Milestones Reports Tests and inspections Delivery or staggered delivery PMIS (Project Management Info Sys) Updating Chapter10 Project Monitoring & Control

Meetings – Some monitoring issues What problems do you have and what is being done to correct them? What problems do you anticipate in the future? Do you need any resources you do not yet have? Do you need information you do not have yet? Do you know anything that will give you schedule difficulties? Any possibility your task will finish early/late? Will your task be completed under/over/on budget? Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Project Control Cycle PLAN Specifications Project Schedule Project budget Resource plan Vendor contracts ACTION Correct deviations from plan RE-PLAN as necessary MONITOR Record status Report progress Report cost COMPARE Actual status against plan Schedule Cost Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Project Control Control – process and activities needed to correct deviations from plan Control the triple constraints time (schedule) cost (budget, expenses, etc) performance (specifications, testing results, etc.) Chapter10 Project Monitoring & Control

Techniques for monitoring and control Earned Value Analysis Critical Ratio Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Earned Value Analysis A way of measuring overall performance (not individual task) is using an aggregate performance measure - Earned Value Earned value of work performed (value completed) for those tasks in progress found by multiplying the estimated percent physical completion of work for each task by the planned cost for those tasks. The result is amount that should be spent on the task so far. This can be compared with actual amount spent. Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Earned Value Analysis Methods for estimating percent completion The 50-50 estimate. 50% is assumed when task is begun, and remaining 50% when work completed. 0-100% rule. This rule allows no credit for work until task is complete, highly conservative rule, project always seem late until the very end of project when everything appears to suddenly catch up Critical input rule. This rule assigns progress according to amount of critical input that has been used. Labor or skilled dependent, machine critical input – buy machine complete task – may be misinformation Proportional rule. This rule divides planned (or actual) time-to-date by total scheduled time(or budgeted (or actual ) cost-to-date by total budgeted cast] to calculate percent complete. This is commonly used rule. Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Earned Value Analysis Refer to earned value chart – basis for evaluating cost and performance to date If total value of the work accomplished is in balance with the planned (baseline) cost, and actual cost then top mgmt has no particular need for a detailed analysis of individual tasks Earned value concept – combines cost reporting & aggregate performance reporting into one comprehensive chart Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Earned Value Analysis Baseline cost to completion – referred to as budget at completion (BAC) Actual cost to date – referred to as estimated cost at completion (EAC) Identify several variances according to two guidelines A negative variance is ‘bad’ Cost and schedule variances are calculated as earned value minus some other measure Chapter10 Project Monitoring & Control

Earned Value Chart – basis for evaluating cost & performance to date Chapter10 Project Monitoring & Control

Earned Value Analysis - Variances 4 types of variances; Cost (spending) variance (CV) – difference between budgeted cost of work performed (earned value) (BCWP) and actual cost of that work (ACWP) Schedule variance (SV) – difference between earned value (BCWP) and cost of work we scheduled to perform to date (BCWS) Time variance (TV) –difference between time scheduled for work performed (STWP) and actual time to perform it (ATWP) Chapter10 Project Monitoring & Control

Earned Value Variance - Formula CV = BCWP – ACWP (negative value - cost overrun) SV = BCWP – BCWS (negative value - behind schedule) TV = STWP – ATWP (negative value - delay) Index (Ratios) Cost Performance Index (CPI) = BCWP/ACWP Schedule Performance Index (SPI) = BCWP/BCWS Time Performance Index (TPI) = STWP/ATWP Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control EXAMPLE Assume that operations on a Work Package cost RM 1,500 to complete. They were originally scheduled to finish today. At this point, we actually spent RM1,350. And we estimate that we have completed two thirds (2/3) of the work. What are the cost and schedule variances? CV = BCWP – ACWP = 1500 (2/3) – 1350 = - 350 SV = BCWP – BCWS = 1500 (2/3) – 1500 = - 500 CPI = BCWP/ACWP = 1500(2/3)/1350 = 0.74 SPI = BCWP/BCWS = 1500(2/3)/1500 = 0.67 Spending higher than budget, and given what we have spent, we are not as far along as we should be (have not completed as much work as we should have) Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Possible to have one of indicators to be favorable while the other unfavorable Might be ahead of schedule and behind costs Six possibilities (see figure next slide) Chapter10 Project Monitoring & Control

6 Possibilities Earned Value Analysis Chapter10 Project Monitoring & Control

EXERCISE (Text P.544 Problem 4) A project to develop a country park has an actual cost in month 17 of $350,000, a planned cost of $475,000, and a value completed of $300,000. Find the cost and schedule variances and the three indexes. BCWS $ Planned (Baseline) – 475,000 ACWP Actual cost – 350,000 Value completed – 300,000 BCWP Time t Month 17 Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Solution BCWS = 475,000 BCWP = 300,000 ACWP = 350,000 CV = 300,000 – 350,000 = -50,000 (negative value - cost overrun) SV = 300,000 – 475,000 = -175,000 (negative value - behind schedule) Cost Performance Index (CPI) = BCWP/ACWP = 300/350 = 0.86 Schedule Performance Index (SPI) = BCWP/BCWS = 300/475 = 0.63 Time Performance Index (TPI) = STWP/ATWP Scheduled Time Work Performed (STWP) can be estimated Time t = Schedule Variance/Slope of Planned costs = -175,000/ (475,000/17) = - 6.26 months  Time Difference= 17- 6.26 = 10.74 TV = 10.74/17 = 0.63 CV = BCWP – ACWP SV = BCWP – BCWS Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Critical ratio Sometimes, especially large projects, it may be worthwhile calculating a set of critical ratios for all project activities The critical ratio is actual progress x budgeted cost scheduled progress actual cost If ratio is 1 everything is probably on target The further away form 1 the ratio is, the more we may need to investigate Chapter10 Project Monitoring & Control

Critical ratio example Calculate the critical ratios for the following activities and indicate which are probably on target and need to be investigated. Activity Actual progress Scheduled Progress Budgeted Cost Actual cost Critical ratio (CR) A 4 days 60 40 B 3 days 2 days 50 C 30 20 D 1 day E 25 Chapter10 Project Monitoring & Control

Critical ratio example Can be on schedule and below budget (Act A) Why so good? Cutting corners? Can be behind schedule but below budget (Act C) Can be on budget but physical progress lagging (Act E) Can be on schedule but cost running higher than budget (Act D) On budget ahead of schedule (Act B) Chapter10 Project Monitoring & Control

Chapter10 Project Monitoring & Control Summary Need proper project monitoring and control mechanisms Tools available to help in monitoring and controlling activities There are human control and management aspects not covered here Chapter10 Project Monitoring & Control