Validation & Verification Report Templates – RIT Perspective Vinay Deodhar, RIT, AP Member Module 3.4 25 March 2012 First SDM JCW, Bonn, Germany.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
TÜV NORD Calibration regarding project assessment requirements 7th CDM Joint Coordination Workshop 2011 Bonn,
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
CDM ACCREDITATION PROCEDURE AREAS OF IMPROVEMENT 1st Sustainable DevelopmentMechanism Joint Coordination Workshop March 2012 Laura Severino.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Motoharu Yamazaki, Programme Officer, Process Management Unit REVISION OF VALIDATION AND.
Validation and verification report templates
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
Build a Better Mousetrap: Quality Assurance and Call Specialist Performance Evaluation.
Climate Change Committee WG1 QA/QC terminology and requirements from the IPCC Good Practice Guidance and the Guidelines for National Inventory Systems.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
Effective Project Management: Traditional, Agile, Extreme
Lesson Design Study Suggestions from our text: Leading Lesson Study.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Conducting the IT Audit
Codex Guidelines for the Application of HACCP
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
© Mahindra Satyam 2009 Project Metrics QMS Training.
Software Engineering 2003 Jyrki Nummenmaa 1 REQUIREMENT SPECIFICATION Today: Requirements Specification Requirements tell us what the system should.
Assessor training Module 6 – Communications with Candidates Interstate Renewable Energy Council IREC ISPQ Accreditation and Certification Assessor Training.
SE-02 SOFTWARE ENGINEERING LECTURE 3 Today: Requirements Analysis Requirements tell us what the system should do - not how it should do it. Requirements.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 System evaluation and sampling – first.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
System of Governance Articles 41 to 49 of Directive 2009/138/EC 11 th May 2010 Eamonn Henry.
Teaching material for a course in Software Project Management & Software Engineering – part II.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
Calibration regarding project assessment requirements - RIT Perspectives Vinay Deodhar, RIT Module th JCW Bonn, March 2011.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
Reviews and Inspections. Types of Evaluations Formal Design Reviews conducted by senior personnel or outside experts uncover potential problems Inspections.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
WP4: “ ” Meeting Marcelo Cintra do Amaral WP4: “ Transferability guidelines and Evaluation ” Meeting Marcelo Cintra do Amaral Grant.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Large Combustion Plants Ex-post assessment of the LCP Directive Initial ex-ante evaluation of the IED – Chapter III and BAT Daniel Martin-Montalvo Alvarez.
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
Solving The Collaboration Problem Collaboration is the working together of different people to achieve increase creative thinking and maximize intellectual.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
MANAGEMENT INFORMATION SYSTEM
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Internal Audit & Accounting Systems Review
process and procedures for assessments
Template Contents of the Low Carbon Development Strategy (LCDS)
Validation of Forest-based Carbon Projects
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
The ISSAIs for Financial Audit ISSAIs
How to do an Internal Audit
Life Cycle Models PPT By :Dr. R. Mall.
Engineering Processes
FIRST SDM JOINT COORDINATION WORKSHOP
the Public Procurement Audit Practical Guide
Engineering Processes
Effective Project Management: Traditional, Agile, Extreme
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Enhanced Interaction and Direct Communication
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

Validation & Verification Report Templates – RIT Perspective Vinay Deodhar, RIT, AP Member Module March 2012 First SDM JCW, Bonn, Germany

Current Formats: Validation/Verification reports Evolved from IETA format to suit the requirements of the VVM VVM along with 25 documents giving procedures, guidelines, EB decisions, clarifications had to be considered during validation / verification process VVS Version 02 incorporates provisions of VVM and all the above mentioned documents as of 25 November 2011 Important fact to note is: VVS does not bring in any new requirement, it simply consolidates them as Standard With the entry into force of the VVS DOEs need to modify their validation report templates An EB accepted uniform template would thus be useful

Main issues with current reports Current format is standardized with respect to validation methodology, description of process and validation opinion However, in some reports it is noticed that the validation report copies the text from PDD and does not provide the DOE’s independent analysis of the project, its compliance with applied methodology A validation report is summary of the entire process conducted by the DOE to the outside world. The EB decision fully relies on the validation report. Therefore, the report is expected to summarize in crisp language the salient features of the project and must bring out where the project design is weak and pose risks to estimation of the emission reductions The extent of looseness of language in the validation report many a times decides the chance of attracting request for review.

Expectation from template No change in structure of the val report is expected; in fact should not be made in this crucial year of KP I However, template should identify features of a project that a DOE must study and report independently. – For example, independent evaluation of the capital cost of project as is done by lenders’ due diligence or independent assessment of barriers Validation of input parameters for additionality assessment and benchmark – DOE should elaborate its independent analysis including the final feasibility report Other aspects that should be focused in the template are clear review of the monitoring plan, validation of ER calculation in case of SSC methodologies which are silent on these aspects

Main issues: current Verification reports Current format is standardized with respect to verification methodology, description of process and verification opinion However, it is noticed that verification reports copy text from the monitoring report Clear description of observations onsite, any changes etc. is not found Sometimes changes in measuring instruments go unnoticed DOEs observations from the recorded data are not elaborated

Expectations from the template Template should identify features of a project and monitoring plan that a DOE must study and report independently – For example, independent evaluation of the implementation of the project as per the PDD – Adherence to standards for the monitoring instruments, their calibration and maintenance DOE’s independent assessment of the emission reduction calculations should be properly elaborated In general, the templates should give result in V/V reports that gives confidence in through a truly independent assessment

THANK YOU!