Presented by Dorian S. Conger Conger-Elsea, Inc. 2000 Riveredge Parkway, Suite 740 Atlanta, GA 30328 800-875-8709 phone 770-926-8305 fax

Slides:



Advertisements
Similar presentations
Elements of an Effective Safety and Health Program
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Module N° 7 – SSP training programme
Module N° 4 – ICAO SSP framework
Accident and Incident Investigation
Control and Accounting Information Systems
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Dorian Conger General Manager Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Learning Objectives  Recognize the need for an investigation  Investigate the scene of the accident  Interview victims & witnesses  Distinguish.
1 Safety Management Systems A Transport Canada Civil Aviation Program Update.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Safety and Health Programs
Fundamentals of Information Systems, Second Edition
Purpose of the Standards
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
What is Business Analysis Planning & Monitoring?
Incident Reporting Procedure
Hazard Identification
Presented by Ken Elsea Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
9 Closing the Project Teaching Strategies
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Presented by Ken Elsea Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
Presented by Dorian Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
OPERATIONAL RISK MANAGEMENT
Hazards Identification and Risk Assessment
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Objectives Students will be able to:
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
Accident Analysis.
WHAT IF ANALYSIS USED TO IDENTIFY HAZARDS HAZARDOUS EVENTS
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
Presented by Dorian Conger General Manager Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA
IAEA International Atomic Energy Agency Industrial Radiography Emergency Preparedness Day 5 – Lecture 8.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
Presented by Dorian Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Human Performance Enhancement System Park Young Ho Dept. of Nuclear & Quantum Engineering Korea Advanced Institute of Science and Technology December 23.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
LOW LEVEL RADIOACTIVE WASTE FORUM--FALL 2014 MEETING
Overview – Guide to Developing Safety Improvement Plan
HSE Case: Risk Based Approach.
Overview – Guide to Developing Safety Improvement Plan
Environmental Health and Safety (EH&S) Supplier Awareness Training
Regulatory Oversight of HOF in Finland
Elements of an Effective Safety and Health Program
Fertilizer Industry Safety Information Analysis and Sharing Program
Elements of an Effective Safety and Health Program
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Presented by Dorian S. Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax 2005 Human Performance, Root Cause, and Trending Conference Syracuse, NY 1 Copyright 2014 Conger-Elsea, Inc.

Background - May 2005 Consultants Meeting at IAEA in Vienna 1.Root Cause Analysis Experts 2.Various Disciplines 3.Various Countries Copyright 2014 Conger-Elsea, Inc. 2

The purpose of the working group was to develop a root cause analysis methodology that would combine the best aspects from the various systems currently in use in the nuclear power industry worldwide and to prepare a draft guidance document and manual. Copyright 2014 Conger-Elsea, Inc. 3

1. Management Oversight and Risk Tree Process (MORT) developed in the early 1970's for the U.S. government and enhanced for application since 1982 by Conger & Elsea, Inc. 2.Human Performance Enhancement System (HPES) was originally based on the techniques and tools from the U.S. National Transportation Safety Board and the MORT process. This process was enhanced by the Institute of Nuclear Power Operations (INPO) in the early 1980's. 3.Assessment of Safety Significant Events Team process (ASSET) was developed by the International Atomic Energy Agency (IAEA) for use in evaluating incidents by member states. Copyright 2014 Conger-Elsea, Inc. 4

1.Each identifies what could be considered "direct causes" and through further formal analysis determines "root causes". 2.Each recognizes the importance of understanding the sequence of events. 3.Each includes the search for specific working level causes and the determination of related management system causes. This new IAEA process represents a merger of these three traditions. Copyright 2014 Conger-Elsea, Inc. 5

 Method driven  Multiple causality  Thoroughness  Fairness  Efficiency  Safety Precedence Sequence - the Safety Precedence Sequence (SPS) is a very critical element of the philosophy Copyright 2014 Conger-Elsea, Inc. 6

The SPS establishes a hierarchy of the effectiveness of various approaches to preventing incidents. Six basic methods for preventing incidents are ranked from most effective to least effective as follows: 1.Design for minimum hazard 2.Install/use safety devices (automatic engineered or physical barriers) 3.Safety cautions and warnings (visual and auditory) 4.Procedures (written and verbal instructions) 5.Personnel actions (from directed reading, training, knowledge or awareness) 6.Notify management of risk and accept the situation without corrective action (documented with a signature of acceptance) Copyright 2014 Conger-Elsea, Inc. 7

1.Event categories 2.Assigning the investigation 3.Procedures for conducting investigations 4.Define post investigation responsibilities 5.Training Copyright 2014 Conger-Elsea, Inc. 8

9 RISK CAT. ANALYST(S)RELATIONSHIP TO SITUATION REVIEW ANALYTICAL TECHNIQUES ANALYSTS AND TEAM LEADERS TRAINING HI 1 Team Inter- discipline Indep. ECF and full TREE Event Investigation Workshop 5 days Mod Hi 2 Team Inter- discipline MixedIndep.ECF and full TREE Event Investigation Workshop 5 days Mod Lo 3 IndividualLineIndep.ECF and at least 2 tiers of TREE Root Cause Workshop 2-3 days Lo 4 IndividualLineIndep.ECF and at least 1 tier of TREE Root Cause Workshop 1-2 days

RCAP discards the concept of "apparent cause"! This concept has led to trending programs being cluttered with invalid data based on guess work and not on formal analysis. Two levels of causation determined by this process.  The first are called the "specific working level" causes, which have generally been described in previous work as the technical, direct, or contributing causes of events.  The second set of causes is called the "management system" causes, which have generally been described in previous work as root causes. Copyright 2014 Conger-Elsea, Inc. 10

The investigator will first identify the specific field level causes. Then for each of those, the investigator will be expected to identify a corresponding management system cause or causes. The final step is an Extent of Condition and Extent of Cause Evaluation. Copyright 2014 Conger-Elsea, Inc. 11

Two principle required tools for use with the proposed RCAP. These tools merge the two primary methods of analysis that taken together form the most comprehensive event investigation process available. Most significantly, the same two tools can be appropriately used to analyze events of any category from 1 to Events and Causal Factors (ECF) charting from the original MORT process as enhanced by the HPES System. 2.The Specific Working Level Factors and Management System Factors Tree Analysis (TREE) has been adapted with permission from the most recent MORT Analysis Chart and User's Manual (Conger & Elsea, Inc. - Copyright 2005). Copyright 2014 Conger-Elsea, Inc. 12

Specific Working Level causes by examining the following areas: S1 - Target (what was damaged or harmed) S2 - Hazard (what did the damage or harm) S3 - Barriers (physical and administrative) S4 - Emergency Response (after an event) C1 - Technical Information Systems (for working level personnel) C2 - Operability (Functional) C3 - Maintenance (plan, procedures and execution) C4 - Inspection (plan, procedures and execution) C5 - Supervision (preparation, detecting and correcting field problems) C6 - Higher Supervision Services and Support (support to working level personnel) C7 - Human Performance Error (task assignment, procedures, selection, training, motivation, fitness for duty, etc.) C8 - Task Procedures (clear, concise, complete, etc.) Copyright 2014 Conger-Elsea, Inc. 13

Management System causes by examining the following areas: M1 - Policy (written, up-to-date, consistent, etc.) M2 - Implementation (priorities, direction, responsibility, accountability, delays, budgets, etc.) R1 - Goals (performance and safety) R2 - Technical Information (for engineers, managers, etc.) R3 - Program Review (all types of programs) H1 - Concepts and Requirements (Specifications for planning, engineering, design or safety Analysis) H2 - Design Development Plan (Implementing process for the specifications) H3 - Human Factors (task allocation, predicting errors) H4 - General Design Process (initial, standardized, changes, etc.) Copyright 2014 Conger-Elsea, Inc. 14

Event InvestigationCategory 1Category 2Category 3Category 4 Tier 1 ECF + Branches S1, S2, S3, S4 Top Qs from Branches C1 to C8 Tier 2 + All Qs for any affected “C” Branches (C1-C8) + Top Qs only for Branches “M,” “R,” “H” Tier 3 + All Qs in affected Branches “M,” “R,” “H” Copyright 2014 Conger-Elsea, Inc. 15 NOTE: For each finding in S and C investigators need to determine a corresponding failure in Branches M, R or H.

 NRC rewriting NUREG Incident Investigation Manual  NRC rewriting Management Directive NRC Incident Investigation Program Copyright 2014 Conger-Elsea, Inc. 16