Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
Advertisements

29 th Annual Airport Conference February 28 – March 2, 2006 Hershey, Pennsylvania An IPRF Project Overview of Acceptance Criteria Based on Innovative Testing.
Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Federal Aviation Administration Good Faith Efforts 2009 National DBE Conference FAA Office of Civil Rights “We are who we serve”
Binder Characterizations for High Tire Pressure Project 04/26/2012 Injun Song Injun Song, Ph.D., P. E. SRA International, Inc. Federal Aviation Administration.
Why the United States needs NACLA Recognition of Accreditation Bodies Federal Highway Administration’s Perspective Mike Rafalowski Materials Engineer Office.
Statewide Construction Database (SCD) Florida Department of Transportation Production Management Office June 29, 2006.
Presented to: 33 th Annual Airport Conference Hershey, PA By: Tom Felix Date:March 4, 2010 Federal Aviation Administration AUDITS OF AIP & ARRA PROJECTS.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Airport Improvement Program FY 2010 Guidance and Jobs Bill Update.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
Presented to: 32nd Annual Airport Conference Hershey, PA By: Patricia Henn, AIP/PFC Program Manager Date: March 4, 2009 Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration PASSENGER FACILITY CHARGE PROGRAM UPDATE 29 TH Annual Airports Conference Sheryl Scarborough, FAA.
Federal Aviation Administration 1 Georgia Airports Association February 25, 2015 Presented to: By: Date: Federal Aviation Administration GAA 2015 Spring.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Presented to: Airport Pavement Working Group By: Jeff Gagnon, P.E. Manager ANG-E262 Date: April 24, 2012 Federal Aviation Administration FAA Pavement Research.
Federal Aviation Administration Airports Division Eastern Region AIP Grant Program: Dates & Deadlines Hershey Conference, March 8, 2007.
Galveston Seawall Boulevard Transit/Pedestrian Access and Beautification Program PHASE 2 IMPLEMENTATION UPDATE PHASE 2 IMPLEMENTATION UPDATE February 12,
Presented at: FAA Working Group Meeting Atlantic City, NJ By: Navneet Garg Date:April 24, 2012 Federal Aviation Administration High Temperature Pavement.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
2015 CONAWAY CONFERENCE Consultant Inspection & Prequalification Lyle Flower Administrator Office of Consultant Services.
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
TRIBAL INVOLVEMENT IN EVERY DAY COUNTS IVAN MARRERO, P.E. ASSISTANT DIVISION ADMINISTRATOR FHWA-OKLAHOMA DIVISION.
SAN MARCOS UNIFIED SCHOOL DISTRICT FEBRUARY 10, 2014 FACILITIES UPDATE GOVERNING BOARD MEETING.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
Sun ‘N Fun Complex Lakeland Linder Regional Airport Lakeland, Florida FAA SAFETY CENTER & PRODUCTION STUDIOS.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Federal Aviation Administration Obstructions 101 Protecting Your Approach Minimums Presented to: GAA Conference 2015 By: Cindy M. Hintz Date: October 14,
Spreadsheets for SiteManager Materials 2007 HIGHWAY CONTRACTOR’S MEETING March 13 th (Bowling Green) March 16 th (Lexington) Presented By: Ross Mills.
St. Helena Unified School District Measure “C” Project – January 17, 2013 St. Helena High School New Pool Complex 1.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Presented to: By: Date: Federal Aviation Administration Aviation’s Impact on the Economy Airports Conference Diane Crean, AEA Deputy Administrator April.
Magic Valley Regional Airport Terminal Expansion and Remodel Magic Valley Regional Airport Terminal Modification Feasibility Study.
Presented to: By: Date: Federal Aviation Administration Pavement Projects and Plans ANG-E262 REDAC Jeff Gagnon March 15, 2016.
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
2016 Presented by: Raffi Soghomonian
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
Forsyth County 2016 Bond Referendum
2015 Pavement Test Track Conference
Energy Huntsville Opportunity Report June 2017
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
ACA – Fall Conference FAA AIP Grants Management
College II Tank Interior Recoating Award of Construction Contracts
Multistory Office Building
2017/2018 – SAP/Kinder Calendar
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Lakeland Linder Regional
Pine cove pit time lapse drone photos
Troy School District Bond Program – Series 1 Construction Update
13-block rotation schedule
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Proud As A Peacock! We are very proud of__________________
Ward Park Restroom Timeline
2015 January February March April May June July August September
Presentation transcript:

Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration FAA Testing Laboratory Update

2 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Outline Background Requirements Layout Testing Equipment Schedule

3 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Background Design Started – August 2006 Bid Documents Completed – August % design review preformed by Philadelphia District Army Corps of Engineers USACE to administer the construction contract – $1.1 million estimated construction cost FAA to provide construction oversight Projected contract award February 2009

4 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Requirements 120 x 48 ft building ( ~5500 sq ft) Includes additional restrooms Designed for Soils, Aggregates Concrete and Asphalt testing AMRL Certified CCRL Certified Material Testing for others

5 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 NAPTF Laboratory

6 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Materials Testing Lab National Airport Pavement Test Facility

7 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007

8 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Laboratory Floor Plan Foyer & Restrooms Office & Meeting Room Asphalt Lab Concrete Aggregates and Soil Curing Room Material storage

9 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Layout – Curing Room

10 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Testing Equipment Portable Seismic Pavement Analyzer for HMA and Concrete (PSPA) Portable Seismic Pavement Analyzer for Soils (D-PSPA) Asphalt Pavement Analyzer (APA) Modified or Hamburg Wheel Tracking Device Superpave Mix Design Equipment Marshall Mix design Equipment Concrete & Aggregates Equipment

11 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Testing Equipment Asphalt Pavement Analyzer Hamburg Wheel Tracking Device Portable Seismic Pavement Analyzer

12 Federal Aviation Administration FAA Pavement R&D Program Update March 4, 2009 January 21, 2007 Schedule Award – February 2009 Break Ground – March month Construction Completion – September 2009 Occupancy – October 2009 NEED – LAB MANAGER