Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Reliable Power Reliable Markets Reliable People Implementation of Market & Operational Framework for Wind Integration Stakeholder Information Session Monday,
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Interconnection Queue Business Practices Stakeholder Consultation.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Reliable Power Reliable Markets Reliable People Market Services Stakeholder Session Thursday, January 7, 2010 Metropolitan Centre, Calgary.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Reliable Power Reliable Markets Reliable People Demand Response in Alberta’s Wholesale Electricity Market Demand Response Working Group Kick Off Meeting-
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Updated 1/28/2011.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
Standards Review Subcommittee Update August 17, 2010.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Transmission Planning Code – Draft Document
Transmission Planning Code
Reliability Assessment Committee Reliability Workshop Priorities
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Wind Generation Integration NERC MRC Meeting May 6, 2008
Integration of Variable Generation Task Force (IVGTF)
Integration of Variable Generation Task Force (IVGTF): Status
Wind & Transmission: The Clean Energy Superhighway
Integration of Variable Generation Task Force (IVGTF)
Reliability Assessment Committee Reliability Workshop Priorities
Jim Mcintosh Director, Executive Operations Advisor California ISO
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice President Operations & Reliability

2 Outline Background & Alberta facts Role of the AESO Challenges to Integrating Large Scale Wind Power AESO Approaches NERC Variable Generation Task Force

3 Alberta’s Electric Industry 9,710 MW peak and 80% LF 12,098 MW total generation Over 280 generating units Wholesale market with about 200 market participants > 21,000 km of transmission Interties BC (up to 780 MW) & Sask. (up to 150 MW) BC Alta Sask 5,893 MW 4,635 MW (Other renewables) 178 MW (Wind) 523 MW 869 MW Over 11,000 MW of Wind Power Interest

4 AESO - Our Core Business Markets: develop and operate Alberta’s real-time wholesale energy market to facilitate fair, efficient and open competition Transmission System Development: plan and develop the transmission system to ensure continued reliability and facilitate the competitive market and investment in new supply Transmission System Access: provide system access for both generation and load customers System Operations: direct the reliable operation of Alberta’s power grid

5 Challenges to Integrating Wind Supply-demand balancing is complicated by wind power – wind can increase or decrease rapidly and patterns can be counter to load Limits to how much wind a system can accommodate – wind needs flexible resources Transmission upgrades – need upgrades in southern part of the province Worked with industry to agree on framework and now implementing:  Wind forecasting  Ramping resources  Wind power management  Operational rules and tools SupplyDemand Wind and Load do not correlate well

6 AESO’s Wind Integration Journey Study 1200 MW of Wind Power New Standard specific for Wind Power Facilities Phase 1 Study Study up to 2000 MW Confirms need for Mitigating Measures PH II Study and Temporary Threshold Confirm effectiveness of Mitigating Measures Market and Operational Framework (MOF) AESO- CANWEA collaboration Initiate Wind Power Forecasting Pilot 2008 Implement the MOF Workgroups on Supply Surplus and Wind Power Management Finalize Forecasting Pilot

7 Market and Operational Framework AESO Commitment – the AESO is committed to integrating as much wind as is feasible Market and Operational Framework (MOF) – defines necessary measures and cost recovery to integrate wind on a large scale to:  Ensure reliability and fair, efficient and openly competitive operation of the market Premise of the MOF: If the System Operator receives a reasonable forecast of wind power generation, then the System Operator can create operating plans by using the following tools (in order of priority and use)  Wind forecasting  Energy Market Merit Order  Regulating Reserves  Wind Following Services  Wind Power Management

8 Market and Operational Framework MOF provides certainty regarding measures, obligations and cost recovery:  Transmission – wind generators pay for local interconnection and system upgrades paid by load (legislation)  Wind Forecasting – wind generators pay for costs of wind forecasting  Ancillary Services – paid by load (legislation)  Wind power management – wind generators must install WPM  Interconnection standards – wind generators must comply with LVRT, reactive power and voltage requirements AESO-CanWEA Advisory group – established to provide advice to AESO and collaborate on wind integration issues Industry Working Groups – established to provide AESO recommendations (before formal rule process) regarding:  Wind forecasting, wind power management, supply surplus procedures and upgrades to interconnection standards

9 Implementing the Market and Operational Framework Interconnection Standards  In Nov 2004, AESO developed and implemented an interconnection standard specific for wind power facilities  Standard includes voltage ride through (low and high voltage), static and dynamic reactive power and voltage regulation  Standards will be updated to include: Wind Power Management (ramp rate limiting, power limiting and over frequency governing) SCADA and Communication requirements for Wind Power Management Requirements for Wind Power Forecasting

10 Wind Forecasting Pilot project  3 vendors – ‘AWS Truewind (USA)’, ‘WEPROG (Denmark)’ and ‘energy and meteo (Germany)’– contracted to study wind characteristics and develop methodologies that work for Alberta: Ramping – how to detect large ramps Uncertainty – how to determine level of uncertainty in forecast Facility Owner – define requirements for wind power facility operators Regulating Reserves – how to use forecasts to support AS procurement Information to Industry – how to provide forecasts to market participants  Plan to have wind power forecasting operational by June 2009

11 System Operator Tools Dispatch Decision Support Tool (NEW)  Provide visibility of capacity and ramping capability of the energy market  Incorporate wind power forecasting  Provide hourly and 6 hour outlook on market conditions (including wind)  Prototyping/testing with operators Wind Power Forecasting Tool (NEW)  Incorporate requirements from the wind power forecasting pilot project Wind Power Management Tool (NEW)  Automate the wind power management protocol and procedures (limits or ramp rate limiting) Supply Surplus Tool (update existing tools)  Automate the supply surplus protocol and procedures Short Term Adequacy Tool (update existing tools)

12 Transmission Transmission Planning and System Development  Advancing significant Transmission reinforcements to accommodate wind Interim Measures  Dynamic thermal line ratings (DTLR) – piloting DTLR on SW transmission line this summer  Remedial Action Schemes – 4 RAS schemes in place: 1 initiated by N-1, 1 initiated by N-1 and overload and 2 initiated by overload, communication failure and/or N-1  Operating Policies and Procedures – area OPPs to deal with overloads and RAS Interconnection Queue Management  Strong interest in wind development – over 11,000 MW in the queue  Queue Management Business Practice and associated project milestones ensure that projects are progressing

13 Learnings and Current State 543 MW on AIES without operational issues or increase in AS:  There has been no requirement to increase Regulating Reserves volumes  System performance is good (CPS2 at 98% and no OTC violations)  This is consistent with our study results from 2005 Working groups underway to implement wind forecasting, wind power management, supply surplus protocols and interconnection code upgrades AESO recognized for wind integration efforts by UWIG 2008 award Gaining experience (ISO and industry) and learning from events  Collaborative relationship with CanWEA has been invaluable  Weekly wind reports published  NERC IVGTF

14 Integration of Variable Generation Task Force (IVGTF) Scope The Task Force will prepare:  A concepts document: philosophical & technical considerations  Recommendations: practices, requirements & reliability standards The document will include:  Planning timeframe issues  Operational Planning and Real- time Operating timeframe issues  Review NERC Standards for gaps  Review of future developments: i.e. storage, EHV  Conclusions and recommendations

15 Draft Summary Report prepared Comments received from the IVGTF members Meeting held in August  Finalize recommendations and actions  Editorial meeting on Summary Report Coordination with UCTE- EWIS Next Draft of the Summary Report targeted for mid- September IVGTF Status Report

16 Keeping Reliability in the Balance Bulk power system reliability must be maintained All generation must contribute to system reliability Standards must be fair, transparent & performance-based Planners & operators must understand the challenges of large scale variable generation integration Variable generation integrated into planning & operations New Planning/operating tool requirements described in terms of bulk power system reliability performance

17 IVGTF Preliminary Recommendations Request of Planning Committee: Reliability Assessment Subcommittee (RAS) request on- peak capacity based on hours of risk Study resource adequacy assessment and transmission planning processes Identify necessary data requirements needed to support planning Engage IEEE Power and Energy Society to reconcile voltage ride- through requirements & IEEE 1547 Review Modeling, Data and Analysis Standards (MOD)

18 Request of Operating Committee: Review of FAC-001 & COM-002  Forecasting  Interconnection  Communications Study operational forecast tools suitable for large amounts of variable generation Study the influence on reliability of larger balancing areas IVGTF Preliminary Recommendations

19 Request of Operating & Planning Committee: Approve the recommendations from the final report Study the impact of distributed generation on bulk power system reliability Study the reliability influence of larger balancing areas IVGTF Preliminary Recommendations

20 IVGTF Schedule Complete Summary Report (October) Complete Reference Manual (November) OC/PC Comments (December) Roll-out to Interested Parties (Jan-Feb 2009) Final Approval (March 2009)

21 Questions