11kv Cable Strike Case Study

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Managing the Health and Safety of Contractors
Accident and Incident Investigation
Leadership and Worker Involvement
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Description On the 12 th July 2011, a truck carrying a container was inspected at the SBS Gantry, prior to being sent to the Quayside. A 4ft long, 4x2.
CONTRACTOR KILLED IN FALL FROM ROOF WORKING AT HEIGHT Work at height is work in any place at, above or below, ground level, where a person could be injured,
“TIMEOUT” Human Performance Improvement Tool 5 November 2013.
Engineering Event Investigation—The Role of Violations Presented by William L. Rankin, Ph.D. At the Human Factors Training in Aviation Maintenance Conference.
The Safe Use of Work Equipment. Overview This training tool is dedicated to work equipment and their associated hazards. Work equipment means any machinery,
Contractor Safety Management
© 2010 FLTA Fork Lift Truck Safety Manage to be safe The Role of the Supervisor.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Utilities Working on the Network Health & Safety Requirements.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
WHS Management Plans.
Temporary Works.
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
Hazard Identification
Safety and Health Program Section B of the Forest Activities Code.
Confined Spaces in Construction Subpart AA XX
Preventing Slips & Trips at Work
Health and Safety Policy
OPERATING NOMENCLATURE PRESENTERS: A.B.S.ENNIN, GEORGE COLEMAN, DAVID DADSON, ANTHONY ANSAH.
© University of Reading Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading.
Al Sulokeyat Al Salema and Al Sulokeyat Al Salema and Accountability for Safety.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
Main contractor name – LTI# - Date of incident Workplace Safety Engagement Pack Volume 2014 Edition 1 Working at Heights.
A guide to... Safe Systems of Work.
Supervisor Briefing. There was a LV Cable Strike o/s of 5 Eastcote Rd, Pinner on Friday 10/10/14 at approx. 14:56. The original Excavation was excavated.
GWASANAETHAU IECHYD A DIOGELWCH / HEALTH AND SAFETY SERVICES HOW TO COMPLETE AN ACCIDENT & INCIDENT FORM Essential elements of an Accident & Incident Form.
EliminationSubstitutionEngineeringAdministrationPPE Incident Reporting.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
WEEKLY SAFETY MEETING September 22 nd, OGEC RIG RR 600 JOBI-4.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
ASPEC August 2015 Incidents –0 incidents, 0 near misses Hours 01/08/15-28/08/15 14% Site, 0.6% Travel, 85% Office.
ASPEC December 2015 Incidents –0 incidents, 0 near misses Hours 28/11/15-25/12/15 12% Site, 0.5% Travel, 78% Office.
3D LEISURE - Health & Safety Refresher Training Manual.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Human Factors Ontario Search and Rescue Volunteer Association Team Leader Training.
ASPEC July 2015 Incidents –1 incidents, 0 near misses Hours 27/06/15-31/07/15 12% Site, 0.5% Travel, 87% Office ASPEC QSHR July 2015 Minutes.
We always have time to work safely
Cessco Fabrication & Engineering Ltd.
Health & Safety at Work Act 1974
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Maintaining Safety Standards
Health and Safety Policy
Maintaining Safety Standards
Unsafe personal conduct affecting the work of administrators
Temporary Works Co-ordination
High Potential Near Miss
Unsafe Condition/ Near Miss – Electrical Safety (1)
161 Senior Cadet Development Weekend
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
Prevention through planning, control and monitoring Harold Chinogurei
Check & avoid potential Pinch points
Onsite Control of Visitors & Contractors
HSE LEARNING INCIDENT:
Please read this before using presentation
Observers of the Month July 2013 Restricted.
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

11kv Cable Strike Case Study

11kv Cable Strike Case Study Incident Information – Service Strike On 30th June 2014 11kv Cable Struck By A Toothless Ditching Bucket On An 8t Kubota Excavator

Incident Information – Leading Up To Trial holes had to be dug to identify the recently installed 11kv cable crossings for the temporary north bound on-slip. When the cables were found it was identified they were too high. The Agent reported the findings to the Construction Manger & Stats Co-ordinator. A meeting was held with Western Power Distribution to discuss a solution, the plan was to lay ducting at 1.3m along the hoarding at the required level for the temporary on-slip road & Western Power to supply the cable for the works. The trial holes dug previously had also revealed rogue unidentified cables near to where the joint was needed. Arrangement was made by the Agent to get the electricians out to assess these cables on he 27th June 2014.

During the new ducting installation the drainage team met up with the general foreman on 27th June 2014 & informed him that the duct installation was clashing with a375mm drainage pipe being installed. The drainage team insisted that the ducting had to be lowered to 2.3m. With this information the earthworks team had to arrange for a drag box & 13 tonne excavator to lower all the ducting the team had just installed at 1.3m. The weather on the 27th June 2014 was heavy rain, and therefore, the gang backfilled the area covering the trial holes to ensure no water pooled keeping mud to a minimum in preparation for the 30th June 2014.

Incident Information – Day Of Strike 30th June 2014 The ganger informed his foreman about requiring a new permit to dig as the one in his possession was going to expire by 07:30am that morning. They both discussed the day’s works activities & the foreman instructed his ganger to make his way out to site & that he would be along soon with his new permit for the works to proceed. The section engineer presented the new permit & accompanying drawing & briefed the general foreman on the permit. The section engineer & the general foreman then reviewed the risk assessment for the operation. The planned activity was for the excavation of A trench to install BT & power ducts along the side of the site boundary, including the area where the cables run over where the ducting had to be lowered.

Incident Information – Day Of Strike 30th June 2014 The general foreman then met with the earthworks agent for A discussion on the day's work activities. During the conversation the agent discussed that the cables found were three redundant communication cables & would need to be exposed at some point that day so that an electrician could inspect them as the weather on friday had prevented the planned inspection taking place. The general foreman arrived on site & handed the permit & risk assessment to the ganger, no detailed briefing took place. As the resources had not arrived for dropping the ducting down to the changed level of 2.3m, the general foreman instructed the gang to carry on & expose the three redundant communication cables which were running through the work area.

The ganger was banking the machine during the excavation whilst his operatives were well out of the way of the excavator when there was a flash & a bang. The ganger immediately instructed the machine to move back & moved his gang away from the excavation, during which the cable gave a further 2 bangs. The ganger then contacted the general foreman to report the incident.

Incident Information – Basic Cause Of The Event Permit controller did not brief the restrictions to the supervisor Section engineer did not re visit site & re mark services on the ground General foreman did not challenge the briefing on the buried services, he signed the permit & handed it to the ganger with no proper instructions on the control measures for digging the ground. The gang were put to work without proper planning for uncovering the cables that were previously found the following week. No method statement was produced to plan out the works activity, a risk assessment was rushed & did not follow the hold points within the project instructions for a safe system of work (ssow) with approval

Human Failure Analysis Chart   Name Error Routine Violation Situational Violation Exceptional Violation General Foreman Ganger Agent Section Engineer Earthworks Team Yes - Put The Gang To Work With Little Information About The Cables & Standards Expected Of Them Yes - Did Not Ensure His Team Followed The Correct Control Measures For Buried Services Yes - Previously Been Told On Site About Scrapping With Machine Over A Communications Duct Yes - No Strong Conviction In The Team To Stop Work Having Experienced A Similar Incident Previously On 1st June 2014 Yes - New To The Company Just Following The Team & Trying To Do His Best

Basic Risk Factors (BRF) Definition Incident details Actions to be taken Action assigned to Action by date Design Poorly Designed Equipment That Is Not User Unfriendly   It Is Unclear Why The 11Kv Cable Was Positioned Originally Check All Works Carried Out By Western Distribution Power To Ensure Future Clashes Have Been Ruled Out With Temporary & Permanent Works. Review Project BIM Process, Can The Tool Be Used More Effectively Tools And Equipment Poor Quality, Condition, Suitability Of Materials, Tools, Equipment & Components Drag Box Ordered Is Incorrect For Excavating The 2.3m Excavation. The Safe System Of Work Had Not Been Planned Correctly Project Briefed On Correct Process For Risk Assessment And Method Statement Document Approval & Suitable Time Lines To Correctly Plan Resource Housekeeping No Or Insufficient Attention Given To Keeping The Work Floor Clean Or Tidy N/A Maintenance Management No Or Inadequate Performance Of Maintenance Tasks/ Routine Testing & Repairs Error Enforcing conditions Unsuitable Physical Conditions & Other Influences That Have A Disadvantageous Effect On Human Functioning Weather Drove The Team To Backfill The Trial Hole Previous Weeks Markings & Pegs Missing Before Breaking Ground Teams Must Ensure There Are Adequate Trial Holes Exposed For The Run Of An Excavation Training Given On Site Standards Expected For Buried Services & Operations Utilities Coordinator

Basic Risk Factors (BRF) Definition Incident details Actions to be taken Action assigned to Action by date Procedures Insufficient Quality Or Availability Of Procedures, Guidelines, Method Statement, Risk Assessment & Manuals Procedures Sufficient, But Not Adequately Understood Immediate Supervisory Team Briefed On Buried Services Procedures, Permits & The Buried Services Prompt Card   Brief The Other Permit Co-Ordinators To Ensure That The Procedures Are Understood Health & Safety Manager 03/07/14 Closed Training No Or Insufficient Competence Or Experience (See Training Strategy / MCG Requirement) Section Engineer Has Identified That He Is New To The Company & Feels That He Needs Assistance To Ensure That He Is Competent To Work To The Best Of His Abilities CAT & Genny Works To Be Mentored To Give Confidence That His Checks Are Being Done Correctly Feedback From CAT & Genny Users About Confidence In Cable Detection Construction Manager Communication No or Ineffective Communication Between The Various Employees, Sites Sub Contractors & Departments Supervisors Did Not Communicate Or Follow The Procedure Change Control Training For Supervisors At All Levels Employed On The Project: Ganger Foreman Engineer Works Manager Incompatibility Of Goals Safety Verses Production, Incentives, Political, Social Or Individual Goals Team Were Under Time Constraints To Provide A Quick Solution Before Earthworks As The Prime Objective & The Planned Outage On The 5/6 July 2014 Organisation Shortcomings In An Organisations Structure, Philosophy, Management Strategies Resulting Inadequate Or Ineffective Management Of The Company 11kva Cables Not Monitored To Ensure They Were Installed At The Correct Level

Lessons Learnt Briefings to be given when a new permit is issued to gangs including plant/machine operators Ensure good communication & planning of works prior to putting gangs to work Always brief any new restrictions/changes to a permit or risk assessment Ensure engineers & new staff are well aware of the sites rules & procedures prior to writing any permits Challenge supervision & be sure to fully understand the work to be carried out Ensure good communication with workforce prior to starting works Stop works if there is a change in the method or if you feel something is unsafe