Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.

Slides:



Advertisements
Similar presentations
An Introduction to On-line Partial Discharge Surveys
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
WECC TRD/NERC TADS Webinar
Storm Preparedness Workshop Verizon Florida, LLC May 23, 2007.
POWER QUALITY BACKGROUND & ELEC-SAVER TVSS
Electric Power Utility Motor Case Study Diagnostics & Resolution Power utility contracted to perform off-line circuit and insulation testing of critical.
APS Underground Distribution Cable Replacement Project
Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.
Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009.
Richard (Rick) Elwell Senior Operations and Safety Instructor and Consultant
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
Chapter : 7 : Mains Electricity
1 Fault Assistance Centre David Talbot & Chris Armstrong September 2014.
Circuit Protection Electrical circuits require protection to prevent fire or electrocution in the event of a fault. There are two main types of circuit.
Lesson.5: Fuses and Safe Plugs
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
Pipe Freeze Protection. 2 XL-Trace Systems Pipe Freeze Protection and Flow Maintenance.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Power Quality Understanding Effective Solutions Presented by YOUR NAME HERE.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
POWER SYSTEM PROTECTION. Power system Generators Transformers Transmission lines »Underground cables »Overhead lines Distribution systems.
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
Internal Fault Detection in Padmounted Distribution Transformers Western Underground Committee Fall Meeting – 9/26/12 Paul Henault – IFD Corporation.
ea technology Effective Condition Assessment of MV Switchgear
Grounding, bonding, and ground fault currents
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
September 25, 2012 Planning Working Group - PLWG Sub-Synchronous Resonance Protection & Mitigation John Adams Principal Engineer.
Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
Utility Engineers, PC.  Generation  Transmission  Distribution.
NERC Lessons Learned Summary LLs Published in September 2015.
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
Testing of Low Voltage Installations
MTE CORPORATION Motor Protection Filters1 4 Purpose 4 Motor Specs 4 Alternatives.
Procedures for work on Fixed Electrical Installations Toolbox Talk 2: Duties of Staff and Contractors.
Interconnected Generation Preliminary Engineering Work Related to Fees.
All About Workplace Electrical Safety
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
P2 - Physics Mains Electricity
Power System Protective Relaying-Part One
Hipot Testing 101.
Presentation to Portfolio Committee on Minerals & Energy
Static Management Program (SMP)
WELCOME.
Information technology services Non-core – 2018 budget proposal
Predictive-Based Maintenance Strategy
Advanced Fuse-Saving Techniques
WELCOME TO ALL.
Circuits Electrical Wiring.
An-Najah National University
THREE-PHASE GROUND-FAULT BASICS
Power System Protective Relaying-Part One
The Safe Use of Electricity
Static Management Program (SMP)
Hamilton County / National Grid Meeting
P2 - Physics Mains Electricity.
Hamilton County / National Grid Meeting
Presentation transcript:

Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing A Measured Approach Presented by Jerry L. Landers The Von Corporation

Primary Cable Fault Locating Radar Assisted Also Known As: Arc Reflection/ARM Radar Time Domain Reflectrometer

Generic Radar Signatures (Understanding TDR’s Riser Bond)

Initial and Fault Traces

Sectionalizing Practice: Refusing

SECTIONALIZING OPTIONS FAULT INDICATORS FAULT INDICATORS RECLOSING RECLOSING HIPOTING AT EACH TRANSFORMER HIPOTING AT EACH TRANSFORMER DIVIDE AND CONQUER DIVIDE AND CONQUER ARC REFLECTION ARC REFLECTION

DETRIMENTAL EFFECTS INRUSH INRUSH VOLTAGE TRANSIENTS VOLTAGE TRANSIENTS CABLE / INSULATION DEGRADATION CABLE / INSULATION DEGRADATION SPLICE DAMAGE SPLICE DAMAGE TERMINATION FAILURES TERMINATION FAILURES MOMENTARIES MOMENTARIES SYMPATHETIC CIRCUIT OUTAGES SYMPATHETIC CIRCUIT OUTAGES IMPROPER FUSING IMPROPER FUSING

OBJECTIVES RESTORE POWER QUICKLY RESTORE POWER QUICKLY ELIMINATE CABLE DAMAGE ELIMINATE CABLE DAMAGE ELIMINATE ACCESSORY DAMAGE ELIMINATE ACCESSORY DAMAGE PROTECT CUSTOMER DEVICES. PROTECT CUSTOMER DEVICES. ELIMINATE FUSING ERRORS ELIMINATE FUSING ERRORS REDUCE LABOR / MATERIAL COSTS REDUCE LABOR / MATERIAL COSTS ELIMINATE MOMENTARIES ELIMINATE MOMENTARIES ELIMINATE SYMPATHETIC OUTAGES ELIMINATE SYMPATHETIC OUTAGES

Initial Radar Trace with Transformers inline.

Radar Trace with Tranformers Marked

Radar Trace with Transformers and Fault Marked

Very Low Frequency Testing (VLF)

Today we are going to probe this issue Hopefully each of you will leave with the intention of being proactive Your Utility must answer this question To Test or not to Test?

Primary Cable Testing Is it necessary? What are the alternatives? Do nothing Injection Replacement strategy

Why Test Reliability issues Identify defective cables Diagnostic for cable replacement plan

For years utility engineers have been asked: How do we manage an aging underground infrastructure? How can we prolong the life or our older assets? By what means can we know which cables to replace?

Questions lead to More Questions

Non Destructive Testing Does it exist?

ON LINE ? OFF LINE ? ACDCVLFPD TAN DELTA

There are however alternatives and measured approaches. A first step is only the prelude to the next, Without the first the other steps can not be taken. A good first step is to realize you must do something. Secondly quit adding to the problem. Sub standard workmanship and or materials are time bombs waiting to explode. Find ways to limit or slow down the aging process.

Be Proactive Start Collecting Data Record Fault Activity Monthly Annually

Determine Type Cable Fault Splice Fault Termination Fault Dig In

Expand Parameters By Area By Cable Type By Age By Mfg

Identify Problem Areas Geography Critical Circuits

CONCLUSION After collection of the available information You will see what actions are indicated. There is no one size fits all or magic bullet. With fault activity types and frequency data. You are armed with enough information to meet with equipment suppliers and or testing providers to plan and budget your solutions.

I would like to thank The Western Underground Committee Management and Staff And YOU Travel Safe