Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
DOM 102: Principles of Operations Management Operations Scheduling
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Operations Management
Global Manufacturing and Materials Management
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
PowerPoint Presentation
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Production Systems Chapter 9.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Chapter 16: Learning Objectives
Operations Management
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Production Activity Control
Production Planning and Control Introduction
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Basics of Supply Chain Management
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Production Activity Control
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling Operations
AXUG Partner Showcase – Introducing Preactor
Manufacturing Planning and Control
Synchronous Manufacturing and Theory of Constraints
assemble-to-order (ATO) A system that produces standard modules to be
Manufacturing Planning and Control
Chap 11 Learning Objectives
Manufacturing Planning and Control
Theory of Constraints Part II: TOC Concepts
Synchronous Manufacturing and Theory of Constraints
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter 8

8-2 Production Activity Control Production Activity Control (PAC) concerns the execution of material plans. A number of MPC activities, including Shop-floor Scheduling and Control (SFC), Vendor Scheduling and Follow- up, Order Release, and Purchasing fall partly or completely within the realm of Production Activity Control.

8-3 Agenda Production Activity Control–An OverviewManufacturing Planning and Control LinkagesProduction Activity Control TechniquesTheory of ConstraintsVendor SchedulingPrinciples

8-4 Production Activity Control in the MPC System Resource planning Sales and operations planning Demand management Master production scheduling Detailed material planning Material and capacity plans Shop-floor scheduling and control (SFC) Purchasing Detailed capacity planning Vendor scheduling and follow-up Order release Production activity control

8-5 System Links–MPC and Production Activity Control PAC System Detailed Capacity Planning Planning information to PAC Feedback from PAC – status and warnings Detailed Material Planning Planning information to PAC Feedback from PAC – status and warnings

8-6 Just-in-Time (JIT) Effect on PAC Formal systems for shop-floor control are largely unnecessary under JIT PAC functions are simplified Order release through kanbans or other pull system Limited work-in-process inventories Detailed scheduling is not needed No data collection or monitoring requirements–only raw material and finished goods inventories Vendor scheduling may be more complex under JIT

8-7 Production Activity Control and Company Environment The primary PAC objective is managing material flows to meet MPC plans Other objectives may pertain to efficient use of capacity, labor, tools, time, or materials Under JIT the objective is material velocity PAC objectives reflect the firm’s strategy and competitive position

8-8 Production Activity Control Techniques Production Activity Control Gantt Charts Provides graphic representation of the system Priority Sequencing Rules Selecting the order of job processing Theory of Constraints Scheduling Scheduling to minimize impact of bottleneck resources

8-9 Basic Shop Floor Concepts Routing and lead-time data are essential inputs Routing specifies the operation, its duration, and the work center performing the work Lead times typically consist of four elements Run time Setup time Move time Queue time

8-10 Operation Setback Chart Component parts Sub-AssemblyFinished Product Part D has three operations

8-11 Lead-Time Management The four elements of lead time (run, setup, move, and queue) can be compressed with good PAC management A basic principle of MPC systems is to substitute information for inventory The knowledge of when an order will arrive at a work center replaces the need to WIP inventory feeding the work center

8-12 Gantt Charts Gantt charts show a schedule Each step listed separately Relationship between steps portrayed visually

8-13 Priority Sequencing Rules Determine which job to run next at a particular work center When a job is near completion, the available jobs in the queue are evaluated

8-14 Priority Sequencing Rules Common rules Order slack–work on the job with the least total slack Slack per operation–divide total slack by the number of remaining operations, then work on job with least slack Critical ratio–calculate (time remaining)/(work remaining) and work on job with lowest ratio Shortest operation next–work on the job that can be completed most quickly

8-15 Theory of Constraints (TOC) TOC focuses effort on bottleneck resources Bottlenecks limit the capacity of the entire plant Objective is to maximize throughput Bottlenecks may be constraints other than work centers Constraints are identified, buffered with inventory, and their importance is stressed to the entire factory

8-16 Theory of Constraints Scheduling Drum-Buffer-Rope Drum–bottleneck work centers which control the tempo of workflow through the plant Buffer–inventory and/or scheduling activities to protect the throughput at bottlenecks from random variation Rope–use of pull scheduling at non-bottleneck resources Material moves through non-bottleneck resources as quickly as possible, bottlenecks are managed for maximum efficiency

8-17 TOC Scheduling Potential bottlenecks are identified using rough-cut capacity planning Scheduling is completed according to the work center type

8-18 Capacity Utilization Chart Work centers over a capacity threshold (80%) are considered bottlenecks

8-19 Buffers TOC uses both safety stock and safety lead time at bottleneck operations Safety lead time is introduced between sequential orders at the bottleneck Safety stock of completed parts from preceding, non-bottleneck operations is held in front of the bottleneck to prevent shortages

8-20 TOC and Lot Sizing Lot sizes are calculated differently for bottleneck and non-bottleneck resources For the same finished item, lot sizes at different operations may be different TOC splits orders at non-bottleneck resources and combines orders at bottlenecks This maintains supply of non-bottleneck parts while reducing setup time and/or increasing efficiency at the bottleneck

8-21 Managing the TOC Schedule Schedule new orders on the bottleneck operations (drums) Finite backward scheduling Exploiting the drums If necessary, add capacity to drums by moving work or outsourcing Material release–ropes Release raw materials to non-bottlenecks only when scheduled Proactive management of buffers Ensure that bottleneck resources are not starved for orders Elevating the drum Increase capacity at the bottlenecks to allow the organization to grow

8-22 TOC Contributions A feasible master schedule Less WIP, shorter lead times, greater material velocity Eliminates the conflict between MRP and finite scheduling

8-23 TOC Implementation Issues Requires a major shift in manufacturing mindset (paradigm shift) Its OK to not work (at a non-bottleneck) if there are no orders Firm needs sound systems, education, top- management support, and willingness to change

8-24 Vendor Scheduling and Follow-Up Objective–align orders with due dates Vendor must have continually updated information concerning priorities Contractual agreements may limit the type and degree of change the vendor must accommodate Use of the Internet can enhance the speed and efficiency of information exchange

8-25 Principles Production activity control system design must be in concert with the firm’s needs. Vendor capacities should be planned and scheduled with as much diligence as internal resources. Lead times must be managed. Feedback from the PAC should provide both status and early warning information to other MPC modules

8-26 Principles E-based systems can improve communication between customer and vendor, reducing lead time and overhead. TOC scheduling provides improved performance by focusing on the constraining resources. TOC implementation requires a change in culture. Traditional priority rules can play a role in scheduling non-bottleneck resources. Stability in manufacturing loads and capacity plans facilitates shop-floor execution.

8-27 Quiz – Chapter 8 Production activity control (PAC) actions take place mainly in which section of the MPC system? The shop-floor control system is kept current on changes in material plans by the MRP system? (True/False) Formal shop-floor control systems are unnecessary under JIT? (True/False) A visual representation of the scheduling process can be provided by _________ charts. The TOC scheduling process is called ______-_________- _________. In TOC scheduling, buffers are maintained before and after _____________ resources.