Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
RAPIER TECHNOLOGIES LTD MADE IN UK. Heavy duty pan and tilt head future proof design with multiple options. Heavy duty pan and tilt head future proof.
Advertisements

Cylinder Design Cylinder Liner (Barrel) Design
Brief Introduction of 3D Construction System
Summary Sheet Session Number : Date : Subject Expert : Dr. M.C. Nataraja Professor Department of Civil Engineering, S.J. College of Engineering,
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
PISTONS, RINGS, AND CONNECTING RODS
Progress on the Coupling Coil & Focus Coil Interface Engineering
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1.
Forming. There are 4 main types of forming these are Press forming Embossing Deep drawing Spinning Forming comes under processing metals in redistribution.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
The problem of foundry production is manufacture of billets and machine parts by pouring fused metal into a casting mould, whose cavity has the shape of.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Selection Criteria Properties Availability Cost Manufacturability
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Absorber Home works RIKEN/RBRC Itaru Nakagawa. Machining MachineDepth PitchSpeed FactoryFraise0.5 ~ 2 mm 40 ~ 50 m/min Test BenchLathe1 mm78 m/min.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Selection Criteria Properties Availability Cost Manufacturability
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
The point is a square with a side length 1 yocto (the yocto is the smallest unit of measurement and it is equal to 10^-24 meter)
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Week No. 02 Lesson Name File
Mechanical Designs of The Central Detector Jinyu Fu
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
CONFIDENTIAL Silk metal cover concepts Silk/ Nokia Uni-body.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
MATERIAL PROCESSING: “ALL THAT IS DONE TO CONVERT STAFF TO THINGS”
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
K.K.ENTERPRISE Manufacturers & Exporters of Steel & Stainless Steel Forgings with Grey and Ductile Iron Fully Finished Components WELCOME Unit Address:
Automotive Engines Theory and Servicing
Status and Progress of NSW HUB and Extension
MICE Partial Return Yoke Mechanical Design
Basic Lines and Views.
SiD Muon Yoke Structure - Deformation Studies -
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Requirements of the support mechanics
MACHINE PARTS (FOR DCE / DIT)
Modern Automotive Technology PowerPoint for by Russell Krick
Surface area and volume: Surface area of a cuboid
Surface Area.
Neutron guide Shielding Concept
Single Detector Design
Selection Criteria Properties Availability Cost
support a power pole that is 15 meters
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Automotive Technology Principles, Diagnosis, and Service
Automotive Engines Theory and Servicing
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

Absorber Design Concept RIKEN/RBRC Itaru Nakagawa 1

2.34 meters  56cm 2 1cm 35 cm 37° 10° 16cm A (thickness 16cm)B (thickness 19cm) Volume0.38 m m 3 Net Weight3.4t5.2t 19cm 2 7cm Material : Copper, Brass, Bronze, Stainless Steel Total 8.6t 2

3 12 3 4 Since Flower pot is tapered, we cannot install absorber from the back if absorber is made in one body. Ring design also faces same installation problem. Since Flower pot is tapered, we cannot install absorber from the back if absorber is made in one body. Ring design also faces same installation problem. Thus the present idea is to segment front and back absorbers into 4 pieces, respectively. Total 8 pieces. Thus the present idea is to segment front and back absorbers into 4 pieces, respectively. Total 8 pieces.

4 12 3 4 If the company make the absorber by casting of whole absorber and then chop into pieces, then there will be space in the order of a few mm. If they do machining each pieces, then the joints will be exact (less than mm). If the company make the absorber by casting of whole absorber and then chop into pieces, then there will be space in the order of a few mm. If they do machining each pieces, then the joints will be exact (less than mm). We’ll fill out this gap with spacers, if we found it is necessary.

Constraint of Installation absorber Counter weight Crane Max = 12t Each absorber piece Is preferably less than 2 tons. (Don)  8 pieces segmentation brings each piece about 1t. Each absorber piece Is preferably less than 2 tons. (Don)  8 pieces segmentation brings each piece about 1t. 5

~ 25cm Interference w/ BBC Cables BBC cables are running at 25 cm elevation from the surface of central magnet back. We need to re-route cables at the elevation of 35cm on top of the absorber back surface. BBC cables are running at 25 cm elevation from the surface of central magnet back. We need to re-route cables at the elevation of 35cm on top of the absorber back surface. Andrew Cables Andrew cable/connectors are very stiff. Minimum bending angle and number of times are strictly limited. 6

7

Modification of BBC Patch Connection 8

Flower Pot Design (South) 10cm New patch panel (66mm) 9

Available Space 90mm 10

Japanese Companies CompanyMaterialManufactureQuoteComment Izumi Metal / Akaboshi co. ltd. BronzeCastingNext weekConfident in time Sumitomo Heavy Industrial ltd. BrassCasting$300kDifficulty in time Copper PlateFaster, but 4 layers Hitachi Engineering Oxygen Free Copper Forging3/18 Yuasa Ltd.BrassCastingNext week Tohoku Oye Industry Next week Takano GikenBrassNext week OkamotoBrassCasting $220k + machining 11

Stainless Steel CompanyMaterialMachiningQuoteComment Giken-Seiki Co.SUS310?Lathe Turning Experienced w/ SUS316 B<40uT Iijima Machinary Co. Appointment 3/19 Yagita Giken Co.SUS310?ASAP Inoue Material Need Drawing to Estimate 12

Permeability of SUS 13